Supported soil excavation for foundation setup, ensuring compliance with elevation standards using loaders and mini excavators. Prepared site by arranging boards for accurate center placements before foundation installation. Formed foundations per project specifications while ensuring precise rebar placement from blueprints. Chipped out existing concrete to install dials for new foundation and created holes to secure rebar with epoxy. Constructed tabletop prefab forms on the ground, lifted them with a crane, and installed handrails on top. Set up turnbuckles, whalers, clamps, shoes, speed bolts, and coil rods to support structural integrity. Poured concrete after completing foundations, pedestals, walls, trench, and tabletop installations. Operated hand and power tools for cutting, shaping, and assembling materials according to specifications.
Mark to cut piles, and chip piles, Pour seal slab, Set bad of Boards, Use string line to drop centers, Read Blueprints, Set Layouts, Set Foundation, Set Forms, Make Forms, Grout pockets, and Temple's, Then Once Foundation is poured, Set layout for pedestals, then Set Forms and Chansfer on corners and clamps, Once finished set Turnbuckles and level the sides, On the top of the forms find the center and mark them to aline temple's, set bolts and make sure they are squared using Rise and Run with calculator, plumb bolts with small torpedo level and tie with tie wire, once ready to pour make sure all turnbuckles are tight and bolts don't move, I also Asist with the concrete finishers to pour seal slab, foundations, pedestals and surge vessels, or help the rod busters tie rebar, cut rebar, and set rebar, ive used all types of forms like Deco forms, H-Forms, Emiba Forms, Alummna Forms and make forms, Also used all diffrenet type of hand tools like, Drills, Hammber Drill, Impact Drill, Skill Saw, Saw saw, Adjustable Drills, Bandsaw, etc. I also made forms for Modules, Compressor, Surge Vessel, Cold Box, and E-House, for grout.
Locate the breaker, Set Layouts, Read Blueprints, Set pipe into walls at different angles and measurements, Used Different type of pipes, 1/4, 1/2, 3/4, up to 2inch pipe, Tie down pipe every 3 Feet, Use Different benders to Bend pipe according to measurements and prints, Run wire through pipe with Fish tape, Set new Home Runs, Relocate pipe, and take out existing wire, and replace with new wire, Install outlets on new existing areas.
Make bad of boards and set them in place, Read all types of blueprints, shoot dirt elevation, prep for seal slab, set layouts, Set From, Turnbuckles, Clamps, Speed bolts, Shoes, Cut temples according to blueprints, Also transfer layouts with torpedo's from string line to pedestals Used different forms like, Alumna forms , Emiba forms, H forms, Deco forms, and make forms when needed too, use red wood for paving and set forms with wooden forms and marked top of concrete , Worked on Wing walls as wells as Table tops, Bushed pedestals and grout pockets with chipping hammer using bussing bits.
Build concrete footers, and pedestals for pipe rack, Shoot grade for seal slab and set stakes for grade, read Blueprints, set layouts for foundation, pedestals, surge vessel, compressors, cold box, etc., set forms, turnbuckles, clamps, spacers, or even made forms, Shoot elevation for anchor bolts, and plumb bolts, also worked on tanks, seting forms, bolts, temple's, and bushing small areas that needed to be bushed according to blueprints, also bused, chipped and cut compressor, Make adjustments to trenches when too low,
Read Blueprints, Set layouts, Cut material according to prints, shoot elevation, Make grout pockets, set forms, make forms, Make Templates, Cut templates with touch, Mark Toc on forms, use all types of levels, Line up bolts with string line and Square them using rise and run, pour seal slab, foundations, pedestals, etc. chip and cut piles, Also use all different type of tools like, Hamer drill, impact, skill saw, Jigsaw, saw saw, grinder, adjustable drill, torch, etc.,