Summary
Overview
Work History
Education
Skills
Timeline
Generic

Juan Vasquez

LAS CRUCES

Summary

At Morrow Enterprises, I excelled as a Foreman and Heavy Equipment Operator, also installing underground utilities, such as sewer, water, and gas lines.

Overview

12
12
years of professional experience

Work History

Foreman. Heavy Equipment Operator. Pipelayer

Morrow Enterprises
02.2013 - Current
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly
  • Ensured accurate documentation of all work performed, maintaining a comprehensive database of completed projects.
  • Developed positive relationships with clients, ensuring their concerns were addressed professionally and efficiently throughout the entire process.
  • Assembled and installed underground pipe, fittings, and valves of various sizes.
  • Enhanced workplace safety by consistently following standard operating procedures and wearing appropriate personal protective equipment.
  • Handled all repairs for sanitary sewer, water pipe, and gas pipe systems.
  • Demonstrated strong problem-solving abilities by addressing unexpected complications during pipe installation processes.
  • Improved project efficiency by accurately measuring, cutting, and joining pipes for various construction projects.
  • Reduced project delays by promptly identifying and resolving issues with pipe alignment and connections.
  • Boosted productivity by efficiently using hand tools such as pipe cutters, wrenches, and shovels in pipe laying tasks.
  • Increased overall project quality by performing thorough inspections of installed pipes to detect leaks or defects.
  • Contributed to a decrease in on-site accidents through diligent adherence to safety protocols during heavy machinery operation.
  • Conducted thorough pre-installation site inspections to assess and prepare groundwork for pipe laying, minimizing disruptions.
  • Ensured optimal pipe alignment and connection, preventing future leaks and infrastructure issues.
  • Utilized heavy machinery, such as excavators and backhoes, for trench digging while minimizing impact on surrounding areas.
  • Install sewer pipe, water pipe, gas pipe, fire hydrants

Education

GED -

Aztec Home Schooling
Albuquerque, NM
03.2011

Skills

  • Crew leadership
  • Attention to detail
  • Decision-making
  • Effective communication
  • Teamwork and collaboration

Timeline

Foreman. Heavy Equipment Operator. Pipelayer

Morrow Enterprises
02.2013 - Current

GED -

Aztec Home Schooling
Juan Vasquez