Summary
Overview
Work History
Education
Skills
Timeline
Generic

Julian Salazar

Uhland

Summary

Proficient Maintenance Leader with a strong background in project planning and team supervision. Experienced in heavy equipment operation and driving team collaboration to achieve results. Resourceful in coordinating supplies and personnel to address operational needs effectively.

Overview

34
34
years of professional experience

Work History

Maintenance Leader

City of Austin
Austin
11.2017 - Current
  • Travel to multiple sites to inspect buildings for structural and safety concerns.
  • Led and supervised crews of 2-6 employees, completing projects safely, on time, and to standard.
  • Planned and coordinated weekly work, managing procurement of materials and project preparation for efficient execution.
  • Inspect worksites for hazards and ensure compliance with safety regulations.
  • Addressed facility-related safety issues across multiple locations, ensuring compliance and risk mitigation.
  • Serve as acting supervisor when needed, overseeing operations and securing facilities.
  • Remain on call to support plumbing teams with irrigation and main water line repairs, including excavation.
  • Reconcile monthly ProCard expenses, submit P.O.P.S. requests, and maintain budget tracking.
  • Completed Banner system tasks and assisted team members.

Maintenance Worker II

City of Austin
Austin
09.2017 - 11.2017
  • Coordinated preventative maintenance schedules for vehicles and equipment to maximize operational readiness.
  • Completed diverse work orders to ensure timely maintenance across facilities.
  • Executed carpentry, drywall repair, tile installation, and door/window installation to enhance structural integrity and functionality.
  • Executed concrete work including forming, rebar placement, pouring, screeding, and finishing.
  • Performed roof patching and gutter installation/repair.
  • Operated heavy equipment including skid steer, forklift, aerial lift, and boom lift.
  • Ensured ADA compliance and installed accessibility features such as ramps.
  • Assisted with event setup, stage assembly, and park infrastructure.

Park Grounds Assistant

City of Austin
Austin
11.2016 - 09.2017
  • Installed and maintained park amenities including benches, fencing, signage, and picnic equipment.
  • Repaired fencing to ensure safe park conditions for visitors.
  • Operated landscaping equipment including mowers and augers.
  • Conducted safety inspections and performed general park maintenance to promote visitor safety and park usability.
  • Assisted public during community events like "It's My Park Day," enhancing community engagement.

Park Grounds Assistant

City of Austin
Austin
09.2016 - 11.2016
  • Maintained park cleanliness by removing debris and waste, ensuring a safe environment for visitors.
  • Cleaned and disinfected restrooms and public areas to promote hygiene and enhance visitor experience.
  • Inspected facilities, lighting, and playscapes for hazards to ensure safety and compliance with regulations.
  • Assisted with fencing, repairs, and seasonal park preparation.
  • Performed graffiti removal and pressure washing.

Detail Specialist

Dans Detail
Austin
03.2016 - 09.2016
  • Executed full-service vehicle detailing, enhancing vehicle appearance through washing, polishing, and paint correction.
  • Applied protective coatings such as wax and sealants.
  • Restored and cleaned interiors, effectively removing stains and odors to improve overall customer satisfaction.
  • Delivered high-quality finishes, consistently achieving customer satisfaction through attention to detail.

Prep/Buffer

Service King
Austin
05.2014 - 03.2016
  • Prepared vehicles for painting and buffed surfaces to achieve optimal finish quality.
  • Operated and maintained equipment for efficient vehicle repairs.
  • Assisted technicians in preparing vehicles for service and inspections.
  • Organized workstations to ensure a clean and safe environment.

Park Grounds Assistant (Temporary)

City of Austin
Austin
10.2013 - 02.2014
  • Operated various equipment, including bobcat and chipper, to support park maintenance operations.
  • Installed signage and assisted with maintenance operations to enhance park navigation and visitor experience.
  • Maintained parks through debris removal, restroom cleaning, and graffiti removal, ensuring clean and safe environments for visitors.

Tree Service Foreman

Awesome Tree Service
Austin
09.2009 - 10.2013
  • Supervised crew operations for tree trimming and removal projects, enhancing efficiency and safety.
  • Operated heavy equipment and tools, ensuring optimal functionality and safety during operations.
  • Ensured job site safety and conducted thorough cleanup, maintaining compliance with safety regulations.

Construction Worker

Duran Masonry
Austin
07.1998 - 07.2003
  • Supported material handling, fabrication, and job site preparation to facilitate efficient project execution.
  • Oversaw yard and equipment operations, ensuring optimal functionality and safety compliance.
  • Operated heavy machinery for masonry projects and ensured site safety.
  • Assisted in mixing, pouring, and finishing concrete for various structures.
  • Collaborated with team members to complete construction tasks efficiently.

Groundman

American Tree Works
Austin
06.1997 - 06.1998
  • Operated bobcat, chipper, and boom truck to facilitate project completion and site preparation.
  • Assisted in tree removal operations, ensuring safety and efficiency on job sites.
  • Executed debris removal and site cleanup to restore work areas to safe and usable conditions.

Crew Leader

Adam Commercial & Residential Flooring & Construction
Austin
03.1992 - 04.1997
  • Led crews and coordinated daily operations to ensure smooth workflow.
  • Ensured projects were completed safely, on time, and to customer satisfaction.
  • Managed materials logistics, transportation routes, and employee timekeeping to optimize project efficiency.
  • Ensured adherence to OSHA compliance and safety standards, promoting a safe work environment.
  • Performed flooring installation, light electrical/plumbing, drywall finishing, and fencing installation.

Education

Austin Community College
01-2012

Alvin Community College
01-2008

Skills

  • Construction & Facility Maintenance
  • Heavy Equipment Operation (Skid Steer, Forklift, Boom Lift, Backhoe)
  • OSHA & Workplace Safety Compliance
  • ADA Compliance & Accessibility Improvements
  • Project Planning & Coordination
  • Budget Management & ProCard Reconciliation
  • Work Order Systems (Banner, POPS)
  • Microsoft Excel
  • Microsoft Word
  • Workday
  • UKG
  • OneDrive
  • Team Leadership & Supervision
  • Communication & Team Collaboration

Timeline

Maintenance Leader

City of Austin
11.2017 - Current

Maintenance Worker II

City of Austin
09.2017 - 11.2017

Park Grounds Assistant

City of Austin
11.2016 - 09.2017

Park Grounds Assistant

City of Austin
09.2016 - 11.2016

Detail Specialist

Dans Detail
03.2016 - 09.2016

Prep/Buffer

Service King
05.2014 - 03.2016

Park Grounds Assistant (Temporary)

City of Austin
10.2013 - 02.2014

Tree Service Foreman

Awesome Tree Service
09.2009 - 10.2013

Construction Worker

Duran Masonry
07.1998 - 07.2003

Groundman

American Tree Works
06.1997 - 06.1998

Crew Leader

Adam Commercial & Residential Flooring & Construction
03.1992 - 04.1997

Austin Community College

Alvin Community College
Julian Salazar