Experienced PLC Programmer with over 8 years of experience in designing and optimizing automation systems. Expert in implementing innovative solutions to increase operational efficiency, and minimize downtime. Proven ability to manage integration projects and collaborate with engineering teams to enhance production workflows.
BEV wheel house, Cosma Body Assembly Michigan, Massiv 04/27/25 to 05/28/25.
Front and Rear Door, Fairfax GM Kansas City, Overdrive, 03/10/25 to 04/10/25.
VW426 and BMW G65, Magna Eaglebend, Massiv, 12/01/24 to 02/28/25.
Battery Tray 1 Phase 2, Magna Electric Vehicle Structure, Massiv, 04/01/23 to 11/30/24.
Honda Door Ring, Magna Eaglebend, Massiv, 12/01/22 to 02/28/23.
Battery Tray 1 Phase 1, Magna Electric Vehicle Structure, Massiv, 07/01/21 to 12/31/22.
Shocktower, Gestamp Alabama, FFT, 01/01/21 to 03/31/21.
Band IT Ford C340, Tenneco Puebla, Vinsa, 08/01/20 to 08/31/20.
AGG, Tenneco Puebla, Vinsa, 05/01/20 to 05/31/20.
Rocker Tarek, SLMF Magna, SLMF Magna, 01/01/20 to 03/31/20.
CX727, Gestamp 2 Toluca, MB Sistemas, 04/01/19 to 01/31/20.
MFA-02, Gestamp Aguascalientes, MB Sistemas, 04/01/19 to 04/30/19.
VW371_09-10-11, Gestamp I Puebla, Gestamp I Puebla, 08/01/18 to 08/31/18.
Roof_x247, Gestamp Aguascalientes, Force, 04/01/18 to 08/31/18.
VW371_07, Gestamp I Puebla, Gestamp I Puebla, 06/01/18 to 07/31/18.
Audi AU426 CKD, Gestamp II Puebla, MB Sistemas, 10/01/17 to 01/31/18.
Ruckwand, CIE Nougar S.A. de C.V., Ingemat engineering solutions, 11/01/16 to 03/31/17.
Cell27, Magna Morelos, Force, 07/01/16 to 06/30/17.
Passport, B1/B2 Visa and TN Visa
Rslogix
TIA Portal
Studio 5000
Factory Talk View
XG-X vision terminal
IX- Navigator