I have extensive experience in project management for high-profile, custom manufactured and field installation projects across a wide variety of industries. I have earned a reputation for facilitating the on-time completion of large, complex projects under tight budget constraints, leveraging my mechanical aptitude, structural knowledge, and problem-solving skills.

Overview

1
1
Certification

Work History

General Contractor

Almeida Shop/ADU
Rockford, WA
  • Oversaw all phases of constructing my home and a 60’ x 60’ x 18’ stick-built shop with integrated living quarters as the general contractor.
  • Managed construction projects from planning to completion within set timelines.
  • Collaborated with clients to determine project specifications and requirements.
  • Coordinated subcontractors and suppliers to ensure smooth workflow on-site.

Site Superintendent

High-Production 8-Silo Cement Terminal
Bainville, MT
  • Led the team as Site Superintendent to manage the entire manufacturing process of an 8-silo cement terminal designed for rail-to-truck transfer.
  • Directed onsite installation in Bainville, MT, overseeing site surveying, excavation, foundation work, and steel erection while managing subcontractors, schedules, and budgets to meet project milestones.
  • Managed project from blueprint review through resource allocation (fabrication, machining, coating) to procurement of automated controls package, ensuring alignment with project specifications.
  • Engineered design for rail-to-truck transfer system, optimizing flow and efficiency of material handling.
  • Project Value: $2,668,869.40

Job Site Foreman

Thorpe-Abbott Properties
Spokane, WA
  • Coordinated logistics, oversaw site preparation, collaborated with Garco Construction to adhere to schedule and budget, supported subcontractors to ensure seamless progress.
  • Led job site relocation of 100’ wide x 600’ long x 70’ tall building housing two 100-ton overhead bridge cranes and vacuum systems from Kaiser Mead.
  • Disassembled, refurbished, re-erected structure at new location, ensuring structural integrity and functionality.

Technician

Gonzales Construction
Worley, ID
  • Operated heavy equipment (scrapers, dozers, loaders) for Highway 95 project, ensuring efficient progress on construction timeline.
  • Coordinated logistics for equipment transport between job sites and shop, facilitating timely repairs and minimizing downtime.
  • Note: Gonzales Construction is no longer in operation; operations have been assumed by Winkler.

Education

High School Diploma -

East Valley High School
Spokane, WA
06-2006

Skills

  • Construction planning
  • Project management
  • Budget management
  • Site coordination
  • Site safety management
  • Risk management
  • Client collaboration

Certification

  • Certified Train-The-Trainer for Forklift Operators
  • Certified Train-The-Trainer for Aerial and Telescoping Man Lift Operators
  • Class A CDL
  • First Aid and CPR
  • Lift Director
  • Rigger/Signalman certified
  • 20 years operating heavy equipment

Recent Project Experience

  • Almeida Shop/ADU, Not Provided, Rockford, WA, Not Provided, Justin Almeida, Acted as general contractor and self-performed all aspects of building my own home from the ground up, including a 60’ x 60’ x 18’ stick-built shop with integrated living quarters.
  • High-Production 8-Silo Cement Terminal, Not Provided, Bainville, MT, Not Provided, Stan Dueck (Lehigh Hanson), Served as Site Superintendent responsible for the entire manufacturing process of an 8-silo cement terminal designed for rail-to-truck transfer. Managed the project from blueprint review and resource allocation (fabrication, machining, coating) to procuring the automated controls package. Directed the onsite installation in Bainville, MT, including site surveying, excavation, foundation work, and steel erection, while successfully managing subcontractors, schedules, and budgets.
  • Thorpe-Abbott Properties New Facility Construction, Not Provided, Spokane, WA, Not Provided, John Rouse, Served as Job Site Foreman for the relocation of a 100’ wide x 600’ long x 70’ tall building (housing two 100-ton overhead bridge cranes/top-running vacuum systems) from Kaiser Mead. Disassembled, refurbished, and re-erected the structure at its new location. Coordinated all logistics, oversaw site preparation, worked with Garco Construction to maintain the schedule and budget, and supported all subcontractors to ensure continuous progress.
  • Gonzales Construction, Not Provided, Worley, ID, Not Provided, Steve Gonzales, Served as a Technician operating heavy equipment (scrapers, dozers, loaders) for the Highway 95 project in 2006. Also served as an equipment mechanic and logistics coordinator for transporting equipment between job sites and the shop for repairs.

Years Of Experience

Wemco Inc. 13 years as Foreman/superintendent 

other job related experience is a total of  7 years in  

Timeline

Technician

Gonzales Construction

Job Site Foreman

Thorpe-Abbott Properties

Site Superintendent

High-Production 8-Silo Cement Terminal

General Contractor

Almeida Shop/ADU