Inspection on chain hoist and come a longs , testing and disassembling them and replacing friction plates and other wear and tear parts of the tooling. I tested the v tip grinding kits and the all the transition alignment kits designated in the work area . I work in the pneumatic area repairing impacts and hoses for kits, I tested the bladder kits and the pelican kits as well. I learned some of the hydraulics , I worked on some hand pumps and repaired them and re-greased bottle jacks the 50 and 30 tons that go in the w , v and a-set rigging racks
Pipefitter Journeyman
3 Months
Neal Construction Co Inc. | 2023.03 - 2023.06
Set up job for welding and fitting pipe spools and prepare pipe to be fitted and welded out in shop and field. Pull measurements and trace down line in pipe rack and install and removed valves , valve included gate, flow, ball, needle values. Also bolt up pipe spools from 1/2 inch to 24 inch pipe
Pipefitter Helper
10 Months
Cima Services LP | 2022.05 - 2023.03
Set up job for welding and fitting pipe spools and prepare pipe to be fitted and welded out in shop and field. Pull measurements and trace down line in pipe rack and install and removed valves , valve included gate, flow, ball, needle values. Also bolt up pipe spools from 1/2 inch to 24 inch pipe. Hydro test and pressure test pipe spools
Oil spill Technician
9 Months
OMI Environmental Solutions | 2021.08 - 2022.05
Clean chemicals spill on rail roads and in all chemicals plants and ports. My duty where to transfer Chemicals to tote and drums from tanker trailers and Label all transfer. If I was not doing transfer I was clearing spill on barges , rail roads and chemical plants. They bumb me up to Forman in 3 mouths to run jobs for clarant, my job tasks where to handle incoming loads for the mouth and answer emails on that job
Pipefitter Helper
5 Months
Cima Services LP | 2021.02 - 2021.07
Set up job for welding and fitting pipe spools and prepare pipe to be fitted and welded out in shop and field. Pull measurements and trace down line in pipe rack and install and removed valves , valve included gate, flow, ball, needle values. Also bolt up pipe spools from 1/2 inch to 24 inch pipe. Hydro test and pressure test pipe spools
Pipefitter Helper
2 Years 2 Months
Worley | 2018.10 - 2020.12
Set up job for welding and fitting pipe spools and prepare pipe to be fitted and welded out in shop and field. Pull measurements and trace down line in pipe rack and install and removed valves , valve included gate, flow, ball, needle values. Also bolt up pipe spools from 1/2 inch to 24 inch pipe and pressure test and hydro test pipe spools
Pipefitter Helper
3 Years 6 Months
S&B Engineers and Constructors, Ltd. | 2015.04 - 2018.10
Set up job for welding and fitting pipe spools and prepare pipe to be fitted and welded out in shop and field. Pull measurements and trace down line in pipe rack and install and removed valves , valve included gate, flow, ball, needle values. Also bolt up pipe spools from 1/2 inch to 24 inch pipe
Education
High School Diploma
Stone Coast Academy | 2221 N.E. 164th Street Miami , Florida 33160
Skills
I'm a fast learner
I have good listening skills and I'm open for new opportunities