Summary
Overview
Work History
Education
Skills
SKILLS SUMMARY
Timeline
Generic
Justin Stapleton

Justin Stapleton

Burkburnett,Tx

Summary

Equipped with strong problem-solving abilities, willingness to learn, and excellent communication skills. Poised to contribute to team success and achieve positive results. Ready to tackle new challenges and advance organizational objectives with dedication and enthusiasm.

Overview

13
13
years of professional experience

Work History

Superintendent

Rycon Construction
01.2025 - Current
  • Oversaw daily construction operations, ensuring adherence to safety standards and project timelines.
  • Coordinated with subcontractors and suppliers to align schedules and deliverables effectively.
  • Implemented quality control measures, enhancing project outcomes and reducing rework incidents.
  • Managed site logistics, optimizing workflow efficiency through strategic resource allocation.

Heavy Equipment Operator

Wynn Construction Services
03.2023 - 01.2025
  • Operating heavy machinery like graders, track hoes, forklifts, sky lifts, scissor lifts, backhoes, front end loaders, skid steer, sheep’s foot, compactors, etc. regularly checking equipment and maintenance, utility experience , experience digging around existing underground utilities, pipeline experience and grading, ensuring everyone is following OSHA regulations and job site maintains in compliance. framing, roofing, siding, rough carpentry, finish carpentry, trim work, flooring installation, window and door installation , road busting, concrete foundations, slab on grade, walls, pits, piers and structural concrete engineering. Installation of all machinery, installation of bathroom fixtures and commercial partitions. interpret blueprints and architectural drawings to accurate building structures. Foreman and supervising of all projects.

Lonestar Pro Construction
02.2020 - 03.2023
  • Remodels, flooring, tile, laminate, full bathroom remodels, plumbing, framing and concrete.

Sundt Construction
02.2019 - 02.2020
  • Built Bridges, Carpenter, concrete, heavy equipment, welding etc.

Triplett Wellman
12.2017 - 01.2019
  • Carpenter, concrete, design, form, building schools , water treatment plants also highway work. Skilled skid steer, loader and dump truck operator ,backhoe operator and track hoe operator.Concrete forming foundation walls and slabs and pits, rebar, concrete finish. Exp with pouring concrete grading string lines, turn buckets, snaps ties, shoring,pipe laying,earth work and installation pipe fitting, metal stud framing, finish work. Can be dependable at all times with no supervision finishing projects in a timely manner.

Hendon construction
01.2012 - 12.2017
  • Carpenter for Hendon for 5 years building schools , water treatment plants also highway work. Skilled skid steer, loader and dump truck operator. Concrete forming foundation walls and slabs, tanks and pits, rebar, concrete finish. Exp with pouring concrete grading string lines, turn buckets, snaps ties, shoring,pipe laying,earth work and installation pipe fitting, metal stud framing, finish work. Can be dependable at all times with no supervision finishing projects in a timely manner.

Education

Military Training Installation

Fort Sill
01-2025

Heavy Equiptment Operations

NCCER
12-2023

OSHA 10

360 Training
05-2024

OSHA 30

360 Training
01-2024

CPR Certification

Pomona Hosptial
02-2012

High school -

Walla Walla
01.2010

Skills

  • Management Skills
  • Heavy equipment operator
  • Dedicated work ethic
  • Carpenter
  • Trench safety certified
  • Mechanical ability
  • Dependable
  • Blueprint interpretation
  • OSHA regulations
  • Trustworthy
  • Journeyman Concrete carpenter & finisher
  • Scheduling and planning
  • Materials management
  • Construction software proficiency
  • Equipment inspection

SKILLS SUMMARY

  • Carpentry 100%
  • Management 91%
  • Operator 100%

Timeline

Superintendent

Rycon Construction
01.2025 - Current

Heavy Equipment Operator

Wynn Construction Services
03.2023 - 01.2025

Lonestar Pro Construction
02.2020 - 03.2023

Sundt Construction
02.2019 - 02.2020

Triplett Wellman
12.2017 - 01.2019

Hendon construction
01.2012 - 12.2017

Military Training Installation

Fort Sill

Heavy Equiptment Operations

NCCER

OSHA 10

360 Training

OSHA 30

360 Training

CPR Certification

Pomona Hosptial

High school -

Walla Walla