Summary
Overview
Work History
Education
Skills
References
Certification
Timeline
Generic

Justin Terry

Lufkin,TX

Summary

Provide quality technical services in a fashion that will positively reflect upon the overall project quality. In any capacity or special assignment my objective is safety, effective communication, compliant inspections and supporting documentation.

Overview

11
11
years of professional experience
1
1
Certification

Work History

Welder

Woods Welding Inc
Woodlake , TX
01.2024 - Current
  • Fabrication welder and contract millwright.

Senior welding inspector / QCS

Plains Oryx Permian
09.2022 - 12.2023
  • Multiple gathering systems and LACT installations.
  • Stateline station expansion.
  • Inspected all aspects of pipeline construction.

Utility Inspector / ICI

Summit Midstream
04.2021 - 11.2021
  • Double E pipeline.
  • The project consisted of 135 miles of 42-inch and 36-inch mainline.
  • Inspected the padding and backfilling crew.
  • Inspected on the hydro testing, cleaning, and drying crews.

Chief inspector / QCS

Plains All American
05.2019 - 07.2020
  • Delaware Ranch Phase I and Phase II, PM Allen Roman.
  • The station consists of 1 charge pump, 2 booster pumps, and 2 mainline pumps.
  • The gathering system consists of 3 supply lines (6”, 8” & 10”) as well as a 10” discharge line
  • Phase II consisted of 2 incoming lines (15 miles of 8”) and a charge pump
  • Overseen hot taps and anomaly digs.
  • This project was completed on schedule without any incidents.

Senior welding inspector / QCS

Plains All American
02.2019 - 05.2019
  • Devon Cotton Draw snapping 12-2 connections, PM Walker, Marrow.
  • The project consisted of 5.5 miles of 6-inch pipeline and 1 pump.
  • Overseen welding inspectors, welder testing, kept track of weld and X-ray counts, weld-mapped fabrication drawings, and made redline drawings.

Senior welding inspector / QCS

Plains All American
06.2018 - 02.2019
  • Matador rustler breaks to Hayhurst 12”, PM Michael Cramer, and Sean Leonard.
  • This project consisted of 24 miles of 12-inch pipe with three 2000-foot HDDs, one pump station, and four MLV settings.
  • Overseen welding inspectors, welder testing, kept track of weld and X-ray counts, weld-mapped fabrication, and made redline drawings.

Senior welding inspector / QCS

Plains All American
04.2018 - 02.2019
  • El Mar Station Phase II, PM Nimish Modha.
  • This project consisted of facility work, as well as pipelines.
  • The facility included 2 booster pumps, 3 mainline pumps, 5 incoming meters, and 3 outgoing meters.
  • The incoming pipelines (12”, 16”, & 20”) were included with this project
  • Overseen welding inspectors, welder testing, kept track of weld and X-ray counts, weld-mapped fabrication, and made redline drawings.
  • I also covered a tie in crew and mainline welders.
  • Covered the anomaly digs for the project.

Utility inspector / ICI

Enterprise
01.2018 - 03.2018
  • Enterprise 16" Red Hills to Loving and 20" Loving to Midland pipelines.
  • Road Bores.

Senior welding inspector | Directional project support (DPS)

EnLink Midstream
12.2016 - 12.2017
  • 12-inch High Lonesome pipeline and 16-inch Desperado pipeline.
  • Redlining the fabrication and completing the weld logs.
  • Coordinating and resolving any issues with the X-ray crews or the contractors.
  • Checking and reassuring that the pipeline and fabrication were welded and installed to EnLink specifications.

Welding inspector | Directional project support (DPS)

EnLink Midstream
07.2016 - 12.2016
  • Jam to High Lonesome 6" pipeline and 12" High Lonesome pipeline.
  • Welding Inspector over mainline, tie-ins, and fabrication.
  • Checking and reassuring that the pipeline and fabrication were welded and installed to EnLink specifications.

Welder

WHC
, Freeport, TX
03.2016 - 04.2016
  • 42-inch pipe

Welder

Troy Construction
, Houston, TX
11.2015 - 03.2016
  • 24” pipeline
  • Mainline and Tie-in welder

Welder

Louisiana Crane and Construction
, Eunice, LA
04.2015 - 11.2015
  • Compressors installation and fabrication

Welder

Troy Construction
, Houston, TX
03.2014 - 03.2015
  • 6", 10", 12", 18", and 24" fabrication, mainline, and tie-ins

Education

High School Diploma -

Central High School
Lufkin, TX
05-2005

Skills

  • Reporting procedures
  • Teamwork and Communication
  • Documentation Review
  • Blueprint Reading
  • Visual inspections

References

  • Jason Waller, Summit Midstream, 936-433-2191
  • John Gobber, EnLink, 830-730-3803
  • Tim Prewit, EnLink, 405-445-9031
  • Allen Roman, Plains, 281-841-1499
  • Sean Lewis, Plains, 940-867-9532
  • Shaun Miller, EnLink, 337-351-1640
  • Brad Koonce, Plains, 575-252-3084

Certification

  • API 1169 # 116561 exp 2/26/2027
  • CPWI # 63729522 exp 7/21/2025
  • PEQ Safeland and Safegulf

Timeline

Welder

Woods Welding Inc
01.2024 - Current

Senior welding inspector / QCS

Plains Oryx Permian
09.2022 - 12.2023

Utility Inspector / ICI

Summit Midstream
04.2021 - 11.2021

Chief inspector / QCS

Plains All American
05.2019 - 07.2020

Senior welding inspector / QCS

Plains All American
02.2019 - 05.2019

Senior welding inspector / QCS

Plains All American
06.2018 - 02.2019

Senior welding inspector / QCS

Plains All American
04.2018 - 02.2019

Utility inspector / ICI

Enterprise
01.2018 - 03.2018

Senior welding inspector | Directional project support (DPS)

EnLink Midstream
12.2016 - 12.2017

Welding inspector | Directional project support (DPS)

EnLink Midstream
07.2016 - 12.2016

Welder

WHC
03.2016 - 04.2016

Welder

Troy Construction
11.2015 - 03.2016

Welder

Louisiana Crane and Construction
04.2015 - 11.2015

Welder

Troy Construction
03.2014 - 03.2015

High School Diploma -

Central High School
Justin Terry