Airframe:
Pneumatics Welding (acetylene)
Brake system inspection (Aero Commander 100 hour Airframe inspection
Removed, inspected, reinstalled & rigged left aileron (Cessna 150H) Hi Loks Bucking Bar
Sheet metal fabrication and repair Rigging
Riveting Composite construction/repair
Powerplant:
Fuel injection systems Carburetor inspection and repair
Magnetos/electrical systems Disassemble/reassemble JT12A-6A turbojet engine
Perform 100 powerplant inspection (Cessna 150H) Run turbine engine PT6A-20
Propeller inspection & minor repair Lycoming GO-480 engine overhaul
Run reciprocating engines TIO-541, O-200, O-300, O-540, R-985, GO480 Disassemble/reassemble reciprocating engine IO-470