Run multiple reactors, distillation columns, heaters and other equipment associated in the manufacturing of alkylphenol intermediates
Continuously monitoring multiple tank levels and temperatures to stay within state permitted parameters
Proficient in the DCS (Delta V Operating) and field equipment operations of multiple units within plant
Effectively communicate with field tech to resolve plant issues
Trained multiple operators on DCS as well as field operations
Field Manager/Business Development - Co Owner
Standard Well Services
01.2017 - 08.2017
Manage day-to-day operations of torque and test crews and field rental equipment
Coordinate equipment delivery and personnel
Ordering of all materials and equipment
Perform monthly billing and P&L Statements
Field Operations/Sales
Trio Equipment
05.2013 - 01.2017
Supervise 2 to 4 crew members on rigging of well head and BOP’s for work over rig completion
Effectively perform a 15K pressure test to verify the well heads condition
Installation and removal of 2-way check and back pressure valves
Rigging of flow back iron and manifolds for well depressurization
Coordinate with company men on future well locations and necessary equipment
Key role in starting up and managing Permian basin expansion in 2016
Chemical mixing plant operator
South Texas Oilfield Solutions
03.2012 - 05.2013
Operate chemical mixing plant and oversee all fluids on site
Accurately mix chemical to a specific standard for all needs in down hole operations
Correlate with consultant and tool pusher for the day-to-day functions of rig and well site procedures
Coordinate with trucking company for delivery and disposal of fluids
Air & Hydronic Balancing Technician
GOWAN INC.
03.2007 - 03.2012
Lead operations of system evaluations and balancing
Coordinate with building engineers and general contractors to obtain daily work permits
Effectively perform all tasks needed in evaluating and balancing systems such as obtaining performance data on all equipment associated in HVAC and Hydronic systems
Write a detailed report over all data collected and adjustments made to air handling units and pumps throughout the duration of the project