Summary
Overview
Work History
Education
Skills
Timeline
Generic

Kahlan Mohamed

Dearborn,MI

Summary

Seeking a position where I can contribute my technical skills and leadership qualities to the growth of the organization

Overview

8
8
years of professional experience

Work History

Project Manager

Prime Home Construction
12.2023 - Current
  • Create detailed project plans outlining project scope, deliverables, timelines, and milestones.
  • Allocate necessary resources including labor, materials, equipment, and tools.
  • Ensure that all project phases are clearly scheduled to meet deadlines.
  • Develop cost estimates based on project scope and past project data.
  • Create and monitor the project budget to ensure financial control.
  • Track expenses and adjust for any changes in scope or unforeseen costs.
  • Coordinate with architects, engineers, and specialists to ensure the project meets technical specifications.
  • Reporting Work Progress and Budget Matters to Clients, and Responding to Work Delays.
  • Overseeing Design, Resource Planning, and Project Execution.
  • Negotiating with Vendors, Suppliers, and Subcontractors.
  • Preparing and Reviewing Project Bids and Negotiating and Managing Subcontractor Contracts.
  • Manage and process any changes in scope, design, or materials that impact the project’s cost or timeline.
  • Entrepreneur, Dearborn

Product Assurance Engineer

Alten Technology
09.2021 - 12.2023
  • Ensured products are tested to meet customer and internal functional requirements through comprehensive analysis, developmental, Design Validation (DV) and Process Validation (PV) testing.
  • Analyzed OEM specification and requirements for product validation.
  • Designed and developed product validation plans (EMC, Environmental and others as required).
  • Created and Reviewed validation plans with internal (Product Engineering) and external customer(OEM).
  • Developed requirements for test equipment, gathered quotes and sourced suppliers.
  • Performed the necessary GR&R before DV/PV.
  • Scheduled internal and external labs for planned DV/PVs.
  • Tracked and reported progress throughout the DV/PV.
  • Debugged, analyzed and reported failures that occurred during DV/PV.
  • Supported product engineering with root cause analysis (8D, Fish Bone etc).
  • Archived test data, reports and parts as mandated by internal and external requirements.
  • Released final DV/PBR / PV/PBR for customer approval.
  • Product Assurance Engineer, Troy, MI

EMC Test Engineer

Gentherm
04.2018 - 05.2021
  • Operated lab equipment and instruments following established procedures and assisted in the calibration of internal test equipment.
  • Monitored inventory levels and ordered materials and supplies in accordance with established policies and procedures.
  • Recommended designs and built new test equipment as required for performing tests.
  • Ensured appropriate scheduling and distribution of electronics testing workload.
  • Established test timelines and pertinent limitations and communicated to customers and managers.
  • Performed tests and measurements on electrical and electronic components to provide reliable and precise data following the test lab process flow.
  • Developed and implemented test procedures, including the ability to read schematics and debug analog and digital hardware.
  • Supported lab test technicians and test technicians with electronics training.
  • Provided opinions and interpretations of test data when required.
  • Assisted test technicians in determining the root cause of an incident and led corrective action planning.
  • Analyzed test results and provided feedback.
  • Approved test reports as needed.
  • Electronics Test Engineer, Farmington Hills, MI

Education

Bachelor of Science - Electrical Engineering

University of Michigan

Skills

  • GENERAL: Comprehensive Laboratory Safety Training, Cross-functional Teamwork, Effective Communication, Inventory oversight, Problem Solving, Project Planning, Time Management, Troubleshooting, Validation, Testing, Product Development, Leadership, EMC Testing, Environmental Testing, Electrical Testing, Budgeting, Scheduling, Data Analysis, Project Management, Collaboration, Project Scheduling, Risk Management, Project Tracking
  • SOFTWARE: C, C, Code Warrior , Keil , LabView , Matlab , Microsoft Office (Word, Excel, Power Point) , Multisim , PowerWorld , PSpice , Simulink , Toyo EMC Software , Xilinx, jobtread construction software
  • HARDWARE: Arduino , Digital Multimeter , EMC Antennas (EMS & EMI), ESD & CI Test Equipment , Function and Signal Generators , Injection and Monitor Probes , Oscilloscope , Raspberrypi , Twin C Series , CAN Tool, Environmental Chambers

Timeline

Project Manager

Prime Home Construction
12.2023 - Current

Product Assurance Engineer

Alten Technology
09.2021 - 12.2023

EMC Test Engineer

Gentherm
04.2018 - 05.2021

Bachelor of Science - Electrical Engineering

University of Michigan
Kahlan Mohamed