Summary
Overview
Work History
Education
Skills
Certification
Affiliations
Timeline
Generic
KAZI NUR E MUSTAKIM

KAZI NUR E MUSTAKIM

Arlington,TX

Summary

Experienced Construction Project Engineer with 11+ years of expertise in successfully managing large-scale infrastructure, industrial, and commercial projects. Demonstrated leadership skills in effectively leading multi-disciplinary teams, overseeing transportation engineering, contract administration, feasibility studies, estimation, and scheduling to ensure projects are completed on time, within budget, and to the highest quality standards. Adept at preparing Project Initiation Documents (PIDs), managing procurement processes, and implementing rigorous quality control measures with a strong emphasis on safety standards and regulatory compliance. Proficient in utilizing Primavera P6, Microsoft, and other project management tools to streamline operations and drive project success.

Overview

13
13
years of professional experience
6
6
years of post-secondary education
2
2
Certifications
3
3
Languages

Work History

Graduate Teaching Assistant

The University of Texas at Arlington
08.2024 - Current
  • Teaching and leadership, instruction cost estimation, planning, scheduling and supply chain management using Primavera P6, AutoCAD, Bluebeam Revu, RS Means, and Heavy Bid, AutoCAD 2D, 3D, Microsoft Office Suite (Word, Excel, Outlook, Teams), shop drawing, grading
  • Develop lecture modules on project acquisition, subcontracting, project delivery method and supplier selection

Chief Project Coordinator

Biswas Trading & Construction / SRBG - BTC JV
03.2019 - 12.2023
  • Operation head of 53 mega infrastructure projects including bridges, 14 lane highways (transportation), International Airport (aviation), metro rail, underpasses, dredging, ground development, land development and high-rise buildings (3 Underground basements) worth $500M+
  • Coordination between logistics and project implementation and assist the department in all official matters
  • Ongoing projects monitoring and evaluation of project activity and reporting the progress to owner (Managing Director)
  • Tendering (Design bid build, Design build, CMAR, Integrated) includes design and Bill of Quantity (BOQ) with RFIs for resolving MEP and HVAC design issues and RFQ
  • Coordinated with owners, architects, engineers, contractors, technicians and field staff to optimize schedules
  • Conducted material takeoff, bid package preparation, cost tracking, forecasting and subcontractor bid analysis for large-scale projects
  • Extensive experience in sampling, testing, and inspecting soils, aggregates, concrete, masonry, asphalt, RMC, Crusher with proper mix design and laboratory materials test report analysis and structural steel placement by rebar chart
  • Timely handover $522.00 million projects developed and implemented financial reports for subtasks and roll-up reports summarizing costs
  • Precast pile, RE wall, sand pile, mat or raft, deep, shallow foundation, soil test, geotextile work, geo bag, river protective, canal switch gate, polymer modified bitumen, PVD, road (subbase, base course, top) pavement, drainage, footpath work by CMAR
  • Responsible for acquiring materials, equipment planning, purchasing, and leasing work order with bill approval with final review as a supply chain management head
  • Ensuring equipment, plant production rate to achieve better performance, quality, and availability of components

Head of Department

Partex Cables Ltd (Partex Star Group)
05.2015 - 03.2019
  • Project types: Industrial, Factory, Multistoried building (Five-star standard), Substation, Land development, new project assessment
  • Led a 171-acre land development with earth compaction, soil improvement, ensuring compliance with safety and environmental regulations
  • 5010000 square feet (Steel & RCC Structure), multistoried with Helipad, Sub-station, 201700 square feet mezzanine floor, Aluminum plan, wood treatment Plant, land developing guideline as a departmental head
  • Field screening equipment, and specification document readings
  • From design phase, supervised and prepared whole construction budgeting, procurement, and financial reporting of $35.00 Million Project

Project Engineer

Seventh Day Adventist / Adventist Development & Relief Agency (ADRA)
03.2012 - 05.2015
  • Material requisition, estimation, materials test Performing calculations and data reduction of test results, project report and cost control
  • Ensured adherence to CPM scheduling, cost savings, risk analysis, and construction standards

Education

Master of Science - Construction Management

The University of Texas At Arlington
Arlington, TX
05.2024 - 07.2025

Bachelor of Science - Civil Engineering

World University of Bangladesh
Bangladesh
05.2008 - 04.2013

Skills

Project Management

Certification

OSHA 30

Affiliations

  • SEI Graduate Students Chapter at UTA
  • NASTT UTA Student Chapter
  • UTA Construction Management Club
  • CUIRE Schools
  • DBIA

Timeline

OSHA 30

02-2025

Procore: Project Management

02-2025

Graduate Teaching Assistant

The University of Texas at Arlington
08.2024 - Current

Master of Science - Construction Management

The University of Texas At Arlington
05.2024 - 07.2025

Chief Project Coordinator

Biswas Trading & Construction / SRBG - BTC JV
03.2019 - 12.2023

Head of Department

Partex Cables Ltd (Partex Star Group)
05.2015 - 03.2019

Project Engineer

Seventh Day Adventist / Adventist Development & Relief Agency (ADRA)
03.2012 - 05.2015

Bachelor of Science - Civil Engineering

World University of Bangladesh
05.2008 - 04.2013
KAZI NUR E MUSTAKIM