Key Responsibilities, Key Achievements.
- Ensured optimal specific power, specific fuel consumption, and cost efficiency across all production processes.
- Monitored plant parameters to prevent deviations and implemented corrective actions to meet organizational goals.
- Reduced false air entry and optimized operational processes, boosting overall efficiency.
- Conducted air balance and heat balance calculations to identify and resolve process issues.
- Planned and executed plant shutdowns, including bar chart preparation, material procurement via SAP, and manpower management.
- Extended refractory life to over one year by using alumina bricks and alternative fuels like rice husk, carbon black, liquid chemicals, and shredded plastic, reducing costs, and improving sustainability.
- Led successful shutdown operations, ensuring on-time completion, within budget, and adhering to safety protocols.
- Achieved exceptional operational metrics: 4500 TPD Kiln: Specific Power 21 kW/t, Raw Mill 17.0 kW/t, Cement 27.0 kW/t.
3500 TPD Kiln: Specific Power 24 kW/t, Raw Mill 18.0 kW/t, Cement 28.0 kW/t.
- Managed two production lines with advanced configurations: 4500 TPD Kiln (FLS), Raw Mill (KHD Roller Press), and Cement Mill (Ball Mill with Roller Press - KHD).
3500 TPD Kiln (FLS): Double Preheater, Raw Mill, and Cement Mill (Ball Mill with Roller Press - KHD).