Overview
Work History
Education
Skills
Work Availability
Quote
Timeline
Generic
Kedar El Basir Bey Sr.

Kedar El Basir Bey Sr.

Katy,TX

Overview

10
10
years of professional experience

Work History

Solar Roof Lead

Freedom Solar Power LLC
11.2022 - Current
  • Checked electrical installation for proper wiring, polarity, grounding and integrity of terminations.
  • Used drawings, schematics and instructions to properly install PV systems in accordance with codes and standards.
  • Applied weather sealing to array, building or support mechanisms.

Crew Leader

Freedom Forever Solar
09.2020 - 07.2022
  • .Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Demonstrated system functionality performance in start-up, shut-down, normal operation and emergency shut-down processes.
  • Determined appropriate sizes, ratings and locations for system overcurrent devices, disconnect devices and grounding equipment.
  • Used drawings, schematics and instructions to properly install PV systems in accordance with codes and standards.
  • Configured PV systems based on site conditions and customers needs and expectations.
  • Checked electrical installation for proper wiring, polarity, grounding and integrity of terminations.
  • Connected system wiring and components to achieve both aesthetic and operational targets.
  • Conducted visual inspections and physical tests on previously installed modules and systems to identify faults.
  • Met and exceeded customer preferences with high-quality solar photovoltaic installations matching designs parameters.
  • Tested system wiring layouts, grounds and terminations to finalize installations.
  • Isolated and addressed problems with electrical or environmental factors negatively impacting system operations.
  • Put in place systems consistently surpassing code and safety standards.
  • Completed installations and inspections on both commercial and private buildings for over hundreds of monthly clients.
  • Inventoried supplies and materials for installations and repairs, documented changes and requested new inventory to meet expected demand.
  • Reworked positions and workflow based on individual abilities and production targets.
  • Oversaw employee attendance record, handled payroll and ordered new materials for sites.
  • Checked equipment to determine if maintenance was required.
  • Maintained zero site accidents and lost work days for 9 years.
  • Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions.
  • Interacted with employees to demonstrate high standards and mitigate issues effectively.
  • Established clear priorities and production quality standards.
  • Assessed quality control report data from solar edge and enphase software to monitor and detect issues with quality of final products.
  • Meticulously tracked parts and equipment used on each job site.
  • Verified completed projects met approved time, quality and cost.
  • Settled crew member disputes by addressing problems quickly and providing successful mediation.
  • Communicated effectively with upper management, team members and customers to keep everyone informed.

Roof Lead

Momentum Solar
04.2017 - 04.2019
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Applied weather sealing to arrays
  • Used drawings, schematics and instructions to properly install PV systems in accordance with codes and standards.
  • Checked electrical installation for proper wiring, polarity, grounding and integrity of terminations.
  • Conducted visual inspections and physical tests on previously installed modules and systems to identify faults.
  • Met and exceeded customer preferences with high-quality solar photovoltaic installations matching designs parameters.
  • Put in place systems consistently surpassing code and safety standards.

Electrical Apprentice

Vivint Solar
06.2013 - 04.2017


  • Executed electrical wiring plans for Photovoltaic and residential electrical systems.
  • Adhered closely to safety regulations and industry best practices.
  • Handled installation of electrical components by splicing, joining and connecting wire.
  • Pulled EMT and PVC conduit wire according to plans and code requirements.
  • Terminated wiring and connected circuits with correct techniques.
  • Conducted detailed tests on electrical systems after completing installations, replacements and repairs.

Education

Residential Electric - Electrician

Camden County Technical School
Berlin, NJ
05.2013

Vineland Senior High School
Vineland, NJ
06.2010

Skills

  • Testing Devices
  • Safety Codes
  • OSHA Regulations
  • Creative Solutions
  • Active Listening
  • Safe Work Practices
  • Installer Communication
  • Training Junior Team Members
  • Conduit Running
  • Social Perceptiveness
  • Multitasking Abilities
  • Team Leadership
  • Quality and Compliance
  • Maintaining Clean Work Areas
  • Work Order Completion
  • Schematics Reading
  • Corrective Actions
  • Customer Satisfaction

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Quote

You only have to do a few things right in your life so long as you don’t do too many things wrong.
Warren Buffett

Timeline

Solar Roof Lead

Freedom Solar Power LLC
11.2022 - Current

Crew Leader

Freedom Forever Solar
09.2020 - 07.2022

Roof Lead

Momentum Solar
04.2017 - 04.2019

Electrical Apprentice

Vivint Solar
06.2013 - 04.2017

Residential Electric - Electrician

Camden County Technical School

Vineland Senior High School
Kedar El Basir Bey Sr.