Summary
Overview
Work History
Education
Skills
Computer Skills
Certification
References
Timeline
Generic

Kelly R Driskill

4220 Cheyenne Dr. May,TX

Summary

I am a safety minded superintendent with a vast work history in industrial and commercial construction. Seeking employment with a safety and quality conscious company that will benefit from my experience and skills. In my 25+ years I have experience in many facets of construction from fabrication, installation, and maintenance of structural, piping components, and mechanical equipment. In the heavy industrial, petroleum, chemical, power, and commercial building settings. I have a through knowledge of P&ID's piping isometrics, orthographic drawings, structural drawings, QC requirements, industrial safety standards, installation & repair techniques, rigging, and welding procedures. I have 20 years experience in supervision as crew foreman, general foreman and superintendent.

Overview

11
11
years of professional experience
1
1
Certification

Work History

Construction Superintendent

Central Environmental Inc.
Las Vegas, Nevada
06.2024 - Current
  • Reviewed project plans, specifications, and change orders to ensure accuracy and completeness.
  • Communicated regularly with clients throughout the duration of the project in order to keep them informed of progress.
  • Inspected job sites daily for conformance with building codes, ordinances, and other regulations.
  • Coordinated material deliveries with suppliers to maintain an uninterrupted flow of materials to the job site.
  • Assisted in the development and implementation of safety programs to ensure compliance with OSHA regulations.
  • Interpreted engineering drawings and blueprints for workers in order to facilitate efficient completion of tasks.
  • Ensured that all personnel followed established safety protocols at all times during construction operations.
  • Provided guidance and direction to workers regarding proper installation techniques for various types of construction materials.
  • Maintained records of all changes made during construction process including cost estimates and labor hours worked.
  • Maintained project compliance, reviewed contractor scope, secured materials and negotiated pricing for competitive bidding with zero lost time due to accidents.

Construction Superintendent

SGS builder, LLC
Lawton, OK
08.2023 - Current

Demolition and abatement of a existing DFAC dining hall Building and building a new 36,000 sq ft. AIT DFAC dinning facility on Ft. Sill army base located in Lawton ,OK

  • Maintained project compliance, reviewed contractor scope, secured materials and negotiated pricing for competitive bidding with zero lost time due to accidents.
  • Maintained written daily log of job site activities for permanent records.
  • Tracked material usage and contractor hours to align projects with budgets.
  • Managed 36 employees and subcontractors across 14 different trades by adhering to protocols and best practices implementation.
  • Guided and directed third-party inspectors throughout project.
  • Inspected earthwork, concrete, structural steel, decking, fireproofing, framing and finish work.
  • Eliminated project lags by inspecting work-in-progress to maintain pace, compliance and top quality control.
  • Established and cultivated professional working relationships, which proved highly effective during store construction.
  • Coordinated training of construction teams on site-specific project requirements, techniques and procedures to keep staff members informed of goals.

Project Superintendent

Greenland Enterprises
Dallas, Texas
12.2021 - 12.2023
  • CONSTRUCT CENTRAL UTILITY PLANT VA Medical Center, Dallas, TX Assigned Role: Project Superintendent (2022 – Present) Greenland is the CM responsible for renovating the energy center and cooling towers. The project involves adding one new 1,500 Ton centrifugal chiller and replacing six 1,000 Ton cooling towers. The cast-in-place concrete cooling tower basins are being expanded from six to nine. Sluice gates are being added to allow the basins to become a “common” basin for all six existing chillers and the one new chiller. All condenser water piping is being reworked to a common return header and basin supply. This arrangement will allow all chillers and cooling towers to operate independently of each other for maximum redundancy and backup. All ancillary equipment is being replaced to include new primary/secondary chilled water pumps, condenser water pumps, a new refrigerant exhaust fan system, VFDs, electrical, and new controls tied into the existing BAS system. Additional work includes select demolition, drilled caissons, site utilities, new underground piping, masonry, structural pipe and cooling tower canopy framing, access catwalks and decking, roofing, high-performance basin coatings, site grading, erosion and sedimentation control, landscaping, irrigation, asphalt paving, concrete curbs/gutters/sidewalks, and fencing.

Project Superintendent

Greenland Enterprises
Columbus, MS
03.2021 - 12.2021
  • FUEL FACILITY REPLACEMENT Columbus Air Force Base, MS Assigned Role: Project Superintendent (2021 – 2022) Greenland is the MEP Coordinator responsible for replacing the fuel facility. The project includes the construction of a new fuel facility, which consists of three above-ground, horizontal, double-walled storage tanks (50,000 gallons each) with tank-mounted pumps, a filter separator shelter with receipt and issue filtration, truck fill stands, a truck unload, a product recovery tank, and associated infrastructure. The project also includes the replacement of the existing transfer pumps, which are located at the existing bulk fuel facility, along with other related mechanical and electrical modifications.

Project Superintendent

Greenland Enterprises
Alexandria, LA
01.2022 - 03.2022
  • REPLACE BOILER PLANT AND STEAM DISTRIBUTION SYSTEM Alexandria VA Health Care System, Pineville, LA Assigned Role: Project Superintendent (2021 – 2021) Greenland is the MEP Coordinator responsible for replacing the boiler plant and steam distribution system. The new/renovated boiler plant will include a boiler room with access to an equipment mezzanine and pit, chemical feed room with water testing area, control room, general storage, and electrical equipment areas. The control room will accommodate the energy control center and boiler control functions. Support areas will include a training/ conference room, office, generator room, electrical room, toilets/shower, housekeeping closet, and IT closet.

Construction Superintendent

MBA Energy, and Industrial
Magnolia, TX
08.2019 - 03.2020
  • Maintained written daily log of job site activities for permanent records.
  • Estimated materials and labor requirements to complete jobs within budgetary and timeline requirements.
  • Coordinated schedules and day-to-day activities of crew to satisfy project needs.
  • Determined optimal construction requirements and site plans.
  • Eliminated project lags by inspecting work-in-progress to maintain pace, compliance and top quality control.

Pipe Superintendent

Tellepsen
Houston, TX
1 2019 - 08.2019

OWL CDP / XTO Coyanosa,TX

  • Studied project specifications to plan the sequence and schedule for pipe installations.
  • Inspected worksites to survey for potential hazards or safety concerns.
  • Obtained notices of completion and compliance certifications from construction administration consultants.
  • Eliminated project lags by organizing works-in-progress and delegating tasks.
  • Followed strict timelines and guidelines for installations of piping. equipment and structures.
  • Examined pipelines using pressure gauge, hydrostatic testing, and other methods.

Pipe General Forman

TEiC Construction Services Inc.
Duncan, SC
08.2018 - 11.2018

Duke Energy- Citrus County Crystal River ,FL

  • Analyzed job sites daily to mitigate risks for workers and visitors.
  • Studied project specifications to plan the sequence and schedule for pipe installations.
  • Led worksite preparation and project planning for smoothly run jobs.
  • Reported to supervisors weekly regarding project progress, site problems and labor status.
  • Delegated work to team members and checked for completion in compliance with company guidelines and customer needs.

Pipe Foreman

Mohawk Field Services Inc.
Tulsa, Ok
03.2018 - 08.2018

Formosa Plastics Corporation-Port Lavaca, Tx

  • Inspected worksites to survey for potential hazards or safety concerns.
  • Studied project specifications to plan the sequence and schedule for pipe installations.
  • Reported to supervisors weekly regarding project progress, site problems and labor status.
  • Conferred with other managers, technical personnel and team leaders to coordinate efficient site work and maintain tight schedules.
  • Reported to superintendent each day with project updates and estimated completion dates, noting any delaying issues.

Forman, Journeyman Pipefitter

The Systems Group
Eldorado, AR
03.2017 - 08.2017

TPCO America Corporation-Gregory, TX

  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining.
  • Viewed and checked job equipment daily to determine maintenance requirements.
  • Analyzed job sites daily to mitigate risks for workers and visitors.
  • Observed safe work rules, including fall protection and PPE.
  • Fabricated and positioned screw pipe, socket weld pipe and stainless steel tubing.

Journeyman Pipefitter

Fluor Corporation
Sugar Land, TX
02.2016 - 10.2016

CP CHEM Ethan Cracker Cedar Bayou-Baytown,TX

  • Handled responsibilities for piping systems, including fabricating, assembling, installing and maintaining.
  • Observed safe work rules, including fall protection and PPE.
  • Managed movement of materials and equipment to different job sites.
  • Read and interpreted specifications, P&ID diagrams and prints for job.
  • Cut and pipes with beveling machine and metabo to prepare pipes for welding.

Field Superintendent

Reynolds Industrial Contractor
Minden,, LA
02.2015 - 11.2015

Calumet Shreveport Refining- Shreveport, LA

Calumet Cotton Valley Refining, Cotton Valley, LA

Cabot Ville Platte, LA

  • Established operational and educational plans with clear objectives and paths to achievement.
  • Prepared, executed and monitored service, personnel and safety plans for projects.
  • Managed safety of worksite and adherence to all OSHA regulations .

Pipe Superintendent/Iron Worker Foreman

Ames Construction
Aurora, Colorado
03.2014 - 09.2014

CCV Goldmining Company- Cripple Creek, CO

  • Led and mentored less-experienced ironworkers and assisted foremen in assigning work activities.
  • Wrote and submitted detailed project reports and evaluated completed work via visual inspection to confirm safety and quality of work.
  • Managed and tracked materials and supplies needed for projects and expedited additional materials to avoid project delay.
  • Studied and understood blueprints and specifications before beginning work on projects.
  • Collaborated with construction foreman to establish and confirm task sequences and reinforcing requirements.

Pipe And, Structural Superintendent

Casey Industrial
Westminster, Colorado
04.2013 - 12.2013

Dolet Hills Power station- Mansfield, LA

Asarco Mission Copper Mine- Pima County, AZ

SRP Gila River Power Station- Gila Bend, AZ

  • Improved project completion time by multi-tasking on heavy equipment such as forklifts.
  • Oversaw daily work of 80 workers using knowledge of local and national building codes for all areas of construction.
  • Evaluated plans and inspected ongoing construction to keep work in line with project goals.
  • Managed projects by coordinating materials, inspections and contractor tasks.
  • Prepared, executed and monitored service, personnel and safety plans for projects.

Education

Some College (No Degree) - Business

Howard Junior College

Some College (No Degree) - Business

Cisco Junior College

High School Diploma - Basic Studies

Santa Anna High School
Santa Anna, TX
05.1991

Skills

  • Forklift, manlift and scissor lift competent
  • Knowledge of P&ID's piping isometrics, structural drawings
  • Power and hand tool operation
  • Threading machines
  • Flex pipe certified Cert #8406
  • Secor and McElroy
  • HDPE polyethylene certified on 28, 412, 500 and 900 machines
  • Nupi Pipe Trained
  • Victolic pipe groovers

Computer Skills

Microsoft office - Word, Excel, Outlook,

Google Drive- Docs, Sheets, Forms

Spreadsheets-Excel, Folders

Smart Sheet

Certification

  • OSHA #510 certifcate 8/25/2023
  • OSHA 10 Card #25-003021169 10/29/2009
  • OSHA 30 Card #26-607321441 01/31/2021
  • EM385 40 Hour 08/02/2021
  • Confined Space Supervisor 8 Hour 07/15/2021
  • Excavation and Trenching Competent Person 5 Hour 07/15/2021
  • MSHA MIIN #M65539752
  • NCCER Card #6444081 10 Hour Construction Site Safety 01/06/2009 Industrial pipefitterV3 05/20/2009 Rigger Fundamentals 07/13/2009
  • PEC Safety PEC100655357 04/15/2015
  • TWIC EXP- 02/05/2020
  • Powersafe Card #9402979 05/19
  • CCS Card #469699 05/2018
  • American Red Cross-Adult FA/CPR/AED 10/11/2021
  • 24HR Fall arrest systems-RMOL 0113 5/25/2022

References

Tracy Green

Safety Coordinator

(925) 381-0377

10 years

Toby Tidwell

Construction Superintendent

(903) 814-2857

10 years

John Hathaway

Piping Superintendent

(361) 463-9644

12 years

Timeline

Construction Superintendent

Central Environmental Inc.
06.2024 - Current

Construction Superintendent

SGS builder, LLC
08.2023 - Current

Project Superintendent

Greenland Enterprises
01.2022 - 03.2022

Project Superintendent

Greenland Enterprises
12.2021 - 12.2023

Project Superintendent

Greenland Enterprises
03.2021 - 12.2021

Construction Superintendent

MBA Energy, and Industrial
08.2019 - 03.2020

Pipe General Forman

TEiC Construction Services Inc.
08.2018 - 11.2018

Pipe Foreman

Mohawk Field Services Inc.
03.2018 - 08.2018

Forman, Journeyman Pipefitter

The Systems Group
03.2017 - 08.2017

Journeyman Pipefitter

Fluor Corporation
02.2016 - 10.2016

Field Superintendent

Reynolds Industrial Contractor
02.2015 - 11.2015

Pipe Superintendent/Iron Worker Foreman

Ames Construction
03.2014 - 09.2014

Pipe And, Structural Superintendent

Casey Industrial
04.2013 - 12.2013

Pipe Superintendent

Tellepsen
1 2019 - 08.2019

Some College (No Degree) - Business

Howard Junior College

Some College (No Degree) - Business

Cisco Junior College

High School Diploma - Basic Studies

Santa Anna High School
Kelly R Driskill