Summary
Overview
Work History
Education
Skills
Timeline
Generic

Kenneth Addison

Midwest City,OK

Summary

Dynamic commercial construction professional with extensive experience at Orcutt Mechanical, excelling in crew leadership and a intimate knowledge of codes and regulations relating to the construction industry. Proven track record in project management and quality control, ensuring timely completion and adherence to specifications. Skilled in blueprint interpretation and employee training, fostering a culture of excellence and precision on-site.

Overview

21
21
years of professional experience

Work History

Foreman

Orcutt Mechanical
05.2014 - Current
  • Manage a team for the install of plumbing and hydronic systems.
  • Conducted thorough quality control checks to ensure high standards of workmanship across all projects.
  • Report progress using various construction software including daily reports with photos via procore.
  • Develop and compose RFI's via procore.
  • Use excel and outlook to make project take-offs and material lists for ordering.
  • Review blueprints and construction documents to ensure install is per plans and per code.
  • Provide guidance and instruction to apprentices.
  • Collab with general constractor on projects to ensure schedule is maintained and identify areas where a project may be behind.
  • Have intimate knowledge of equipment and systems installed including the operation and ability to troubleshoot issues that arise.
  • Be quality control for work installed by others.
  • Knowledge of codes and regulations related to commercial construction.
  • Provide owner training of installed plumbing systems.
  • Experience with BIM drawings, 3D models, and other blueprint construction software.
  • Knowledge of construction software including Procore, Touchplan, and Buildr.
  • Communicated effectively with supervisors to report project progress and challenges.
  • Supported professional growth among team members through ongoing mentorship.
  • Improved overall job site safety through consistent monitoring, training, and adherence to safety protocols.

Co-Owner

Custom Creation Frameworks
09.2010 - 05.2014


  • Diagnosed and resolved framing issues through effective problem-solving techniques.
  • Cut, measured and shaped wood after inspecting blueprints, build areas and work orders.
  • Constructed structural frameworks using precise measurements and specifications.
  • Interpreted blueprints and architectural drawings to guide framing processes.
  • Installed windows, doors, and roof structures according to project requirements.
  • Contributed to successful project outcomes by consistently meeting deadlines and staying within budget constraints.
  • Ensured proper installation of structural elements such as beams, headers, and floor systems following blueprints and specifications.
  • Upheld exceptional levels of accuracy in measurements during layout processes for walls, ceilings, floors which resulted in fewer adjustments later on.

Construction Framer

K Diggs Construction
07.2005 - 09.2010
  • Constructed structural frameworks using precise measurements and specifications.
  • Collaborated with team members to ensure timely completion of framing projects.
  • Interpreted blueprints and architectural drawings to guide framing processes.
  • Installed windows, doors, and roof structures according to project requirements.
  • Ensured proper installation of structural elements such as beams, headers, and floor systems following blueprints and specifications.
  • Contributed to successful project outcomes by consistently meeting deadlines and staying within budget constraints.
  • Reduced material waste by accurately measuring, cutting, and assembling wood framing components.
  • Upheld exceptional levels of accuracy in measurements during layout processes for walls, ceilings, floors which resulted in fewer adjustments later on.
  • Maintained high-quality craftsmanship through attention to detail and knowledge of industry best practices.
  • Collaborated with architects, engineers, and designers to resolve design issues or discrepancies during the construction process.
  • Accurately and safely installed wall, roof and floor structures according to blueprints, customer requests, and available inventories.
  • Followed blueprints and instructions from supervisors to erect columns, beams and girders.

Oilfield Roustabout

Rite-Way Construction
02.2004 - 07.2005
  • Assisted in maintaining equipment and tools for optimal operational efficiency.
  • Learned proper handling and use of various tools and machinery on site.
  • Supported team members in executing daily work assignments effectively.
  • Maintained and repaired production equipment and pipelines to support efficient operations.
  • Connected and disconnected pipes, pumps and other production equipment to support functionality.
  • Assisted with rigging and installation of production equipment, pumps and pipes.
  • Assisted in well testing procedures, collecting critical data for analysis and improvement recommendations.
  • Worked in extreme weather conditions and hazardous areas to keep rigs operational.

Education

High School Diploma - General Studies

Chandler High School
Chandler, OK
05.2002

Skills

  • Journeyman Plumbing License
  • Medical Gas License
  • 6010 Brazing Certification
  • Test Scheduled for Journeyman Unlimited Mechanical License
  • Crew leadership
  • Attention to detail
  • Decision-making
  • Effective communication
  • Dedicated work ethic
  • Critical thinking
  • Workplace safety
  • Equipment operation
  • OSHA compliance
  • Construction supervision
  • Quality control
  • Daily reporting
  • Job planning
  • Employee training
  • Site inspection
  • Materials management
  • Commercial construction experience
  • Project management
  • Blueprint interpretation
  • Project planning
  • Site coordination
  • Schematics and blueprints
  • Construction management
  • Subcontractor management

Timeline

Foreman

Orcutt Mechanical
05.2014 - Current

Co-Owner

Custom Creation Frameworks
09.2010 - 05.2014

Construction Framer

K Diggs Construction
07.2005 - 09.2010

Oilfield Roustabout

Rite-Way Construction
02.2004 - 07.2005

High School Diploma - General Studies

Chandler High School