Experienced in many different areas of the electrical field. Reliable support with great customer communication skills. Going on seven years of data center experience, most of which is QA/QC/Cx related. Fast learner who wants to excel at any position.
Underground systems, branch circuit installation, and lighting.
Currently foreman over:
Telecommunications raceway installation, ATS feeder raceway, PDU feeder raceway, AHU feeder raceway, Power Distribution.
Underground installation, and temporary power.
Underground installation, cable tray installation, buss duct installation, data hall build out, branch circuit installation, wire pulling ranging from 120V-MV cable.
Foreman over QA/QC/Cx including:
Torquing, meaning cables, documentation, cable routing, terminations, receiving and inspecting gear, setting equipment, pre-energization inspections, start-ups, cable and equipment labeling, commissioning for the EC, Load bank set up, coordinating with other Cx contractors.
CUB Build out and QA/QC/Cx
Power distribution, branch circuits, and MV wire pulls.
Checked cable routing, termination torque values, and termination locations.
Megged and torqued buss duct connections.
Foreman over punch out, troubleshooting, and final branch circuit installation.
Install of new BDM System
Cable tray installation, cable pulling, terminating MTS's,
Underground systems, temporary power, electrical room build-out, wall rough-in, branch circuits, power distribution, lighting, and lighting control systems.
Raceway installation and wire pulling.
De-icing project, WiFi Project, and C-Concourse expansion.
Underground system installation, data raceway, wall rough-in, branch circuit installation, lighting, power distribution, and buss duct installation.
Installed new switchgear, pulled and terminated feeders, and updated lighting systems within the plant.