Surveyor /Survey Party Chief

Austin Bridge And Road
04.2025 - Current

worked with management from Flour on the LSI.nex project. Was responsible for layout of drainage, retaining walls, drill shafts, and all bridge work. Including abutments and caps. Created as-built drawings as project progressed.

Surveyor / Party Chief

Lane Construction
01.2023 - 03.2025

Layout of Structural projects for 183 A toll road which includes retaining walls, drill shafts, utilities, bridge decking boxed culverts, drainage ponds, & driveways

Surveyor / Patty Chief

Dean Ward Company
01.2017 - 01.2023

Created roadway alignments & grades on TXDOT highway projects

Calculation of quantities of roadway material such as base, asphalt & concrete. Layout of out driveway & drainage on major highway projects. including bridges and box culverts.

Surveyor

T & D Moravits
01.2014 - 01.2017

Provided layout for structural projects. Layout consisted of building piers, drainage , parking lots, anchor bolts, curb and gutter and bridge work.

Supervisor

D & H Construction
01.2007 - 01.2014

Supervised construction crews for building bridges, Culverts, SETs & drainage for TXDOT projects. Also surveyed calculations and created points along with Tx-Dot inspectors.

Survey Manager

Zachry Construction
01.2004 - 01.2007

Built horizontal & vertical alignment models on Terra model. For 183A Toll Road project phase 1. Supervised 3 or more survey crews. Worked with Engineers and Managers on project matters including RFI's and other Quality Control matters.

Patty Chief

Balfour Beatty
01.2001 - 01.2004

Create & Calculated points for 130A Toll Road project

Responsible for layout of points, & other structural related projects. Prov iced elevations for bridges, boxes, drainage and retaining walls.

Education

CCTTS/ CACC Certified -

Capital Rad & Technical School

Auto CADD Design - undefined

CCTTs
Austin, Texas
01.1988

Civil Engineer Studies -

Austin Community College
Austin, Texas
01.1987

Skills

  • Auto CADD Design Terra model Trimble GPS & Robotics & most heavy Equipment

Timeline

Surveyor /Survey Party Chief

Austin Bridge And Road
04.2025 - Current

Surveyor / Party Chief

Lane Construction
01.2023 - 03.2025

Surveyor / Patty Chief

Dean Ward Company
01.2017 - 01.2023

Surveyor

T & D Moravits
01.2014 - 01.2017

Supervisor

D & H Construction
01.2007 - 01.2014

Survey Manager

Zachry Construction
01.2004 - 01.2007

Patty Chief

Balfour Beatty
01.2001 - 01.2004