Adept at horizontal and vertical welding, I significantly enhanced project quality and efficiency at James Construction Group LLC. My expertise in blueprint reading and problem-solving aptitude led to a notable reduction in maintenance costs and rework. Committed to safety and quality control, I consistently deliver superior workmanship, meeting tight deadlines with precision.
Overview
7
7
years of professional experience
Work History
Structural Welder
James Construction Group LLC
02.2014 - 12.2014
Maintained proper usage and care of equipment, resulting in prolonged tool lifespan and reduced maintenance costs.
Reduced project completion times through efficient planning and prioritization of welding tasks.
Ensured safety compliance by strictly adhering to OSHA regulations during all welding activities.
Expanded skill set through continuous learning and training, staying up-to-date on industry advancements and best practices.
Tested welding and safety equipment to check performance.
Increased overall project quality with meticulous attention to detail in weld alignment and configuration.
Collaborated with other trades on large-scale projects, coordinating efforts to ensure seamless integration of welded components into the final structure.
Contributed to a reduction in rework costs by consistently delivering accurate welds that met or exceeded industry standards.
Performed thorough inspections of completed welds, ensuring adherence to design specifications and high-quality workmanship.
Contributed to successful project outcomes by collaborating effectively with team members, engineers, and supervisors.
Enhanced safety on job site, rigorously adhering to all OSHA standards and company safety protocols during welding operations.
Enhanced team safety, conducting regular checks on welding equipment and ensuring all use was in compliance with safety standards.
Inserted sealing strips, wiring and insulating material, as called for in blueprints.
Followed blueprints and instructions from supervisors to erect columns, beams and girders.
Analyzed specifications and blueprints and suggested quantities, types and sizes of materials required per job allocation.
Structural Welder
C B & I Llc
01.2013 - 12.2013
Vast Structural welding background
Exceptional grasp of structural welding concept practices
mDemonstrated adaptability by successfully completing challenging projects that required diverse welding methods and materials expertise.
Ensured safety compliance by strictly adhering to OSHA regulations during all welding activities.
Reduced project completion times through efficient planning and prioritization of welding tasks.
Enhanced structural integrity by executing precise welding techniques on various materials.
Tested welding and safety equipment to check performance.
Contributed to a reduction in rework costs by consistently delivering accurate welds that met or exceeded industry standards.
Performed thorough inspections of completed welds, ensuring adherence to design specifications and high-quality workmanship.
Supported a positive work environment through active participation in safety meetings, training sessions, and team-building activities.
Supported quality assurance efforts, participating in inspections and making adjustments as needed to meet strict industry standards.
Dismantled structures and prepared equipment for travel or site movement.
Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
Analyzed specifications and blueprints and suggested quantities, types and sizes of materials required per job allocation.
Unloaded and positioned prefabricated steel and heavy equipment using hoisting equipment, such as cables, pulleys, or hooks.
Followed blueprints and instructions from supervisors to erect columns, beams and girders.
Structural Welder
Savard Marine
11.2010 - 01.2012
Used MIG and TIG welding on structural supports.
Facilitated smoother project transitions, preparing detailed welding reports and documentation for follow-on trades.
Enhanced safety on job site, rigorously adhering to all OSHA standards and company safety protocols during welding operations.
Ensured structural integrity for new construction projects by performing precise welds according to engineering specifications.
Reduced rework and material waste by applying advanced welding techniques for stronger and cleaner joints.
Improved project completion times with efficient organization of welding tasks and effective coordination with other trades.
Enhanced team safety, conducting regular checks on welding equipment and ensuring all use was in compliance with safety standards.
Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
Analyzed specifications and blueprints and suggested quantities, types and sizes of materials required per job allocation.
Followed blueprints and instructions from supervisors to erect columns, beams and girders.
Inspected projects, identified issues that occurred and implemented corrective measures.
Followed safety guidelines to fasten structural steel members and hoisted cables, chains and rope.
Prepared welding equipment to perform advanced welding work.
Kept work area clean and organized.
Maintained proper usage and care of equipment, resulting in prolonged tool lifespan and reduced maintenance costs.
Consistently met production targets without sacrificing craftsmanship or safety standards by balancing speed with precision in every task.
Tested welding and safety equipment to check performance.
Increased overall project quality with meticulous attention to detail in weld alignment and configuration.
HVAC DUCT WELDING
Shaw SSS
08.2009 - 11.2010
Minimized downtime in HVAC operations by swiftly completing complex duct installations in challenging environments.
Provided excellent customer support by addressing questions or concerns regarding the functionality of newly-installed HVAC systems.
Delivered reliable results under tight deadlines, effectively managing time and resources to complete duct installation projects on schedule.
Enhanced HVAC system efficiency by expertly installing ductwork according to specifications and blueprints.
Increased overall project quality by conducting thorough inspections of installed ducts, ensuring proper sealing and insulation.
Collaborated with team members to complete projects on time and within budget constraints.
Collaborated with other tradespeople such as electricians and plumbers to ensure seamless integration of HVAC systems within building projects.
Fastened joints and seams together to assemble components into sheet metal products.
Structural Welder
Trinity Marine
10.2007 - 08.2009
Removed excess slag with arc-cutting, grinding and using other equipment.
Prepared welding equipment to perform advanced welding work.
Demonstrated adaptability by successfully completing challenging projects that required diverse welding methods and materials expertise.
Kept work area clean and organized.
Maintained proper usage and care of equipment, resulting in prolonged tool lifespan and reduced maintenance costs.
Reduced project completion times through efficient planning and prioritization of welding tasks.
Ensured safety compliance by strictly adhering to OSHA regulations during all welding activities.
Enhanced structural integrity by executing precise welding techniques on various materials.
Chipped away debris and thick crusts of rust, slag, and other materials to ready surfaces for welding.
Expanded skill set through continuous learning and training, staying up-to-date on industry advancements and best practices.
Tested welding and safety equipment to check performance.
Increased overall project quality with meticulous attention to detail in weld alignment and configuration.
Collaborated with other trades on large-scale projects, coordinating efforts to ensure seamless integration of welded components into the final structure.
Supported project management in estimating job costs and materials needed, ensuring projects stayed within budget.
Reduced downtime on job site, maintaining welding equipment in optimal condition and ready for immediate use.