Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

Kenneth Watkins

Superintendent
Haysi,VA

Summary

Hard-working Site Manager with years of experience. Educated in OSHA safety requirements and experienced leading team of over workers. Proficient in carpentry, flooring installation, concrete work, framing, cabinetry, painting and forklift operation. Certifications that i have obtained over the years are my CDL's, Fuse Appoly, Welding, Cutting, Operate machinery. I have worked with several different companies like Columbia, trans Canada, EQT, Equitrans, CNX, Consol, and Exxon.

Overview

15
15
years of professional experience

Work History

Superintendent

Tucker Energy Solutions
, Texas
2016.01 - Current
  • Oversees new projects and build compressor stations.
  • Oversees high profile interstate jobs, as well as laying pipe on steep grades.
  • Oversees crew projects for new - existing pipeline, valve, traps, pig launcher and receiver installations.
  • Assessed current usage and future needs to determine expansion plans.
  • Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Maintained safety onsite and upheld OSHA regulations.
  • Directed projects producing exceptional cost savings by closely managing project budget.
  • Maintained compliance with relevant regulatory authorities by remaining transparent on operations.
  • Compiled daily field report, detailing all key activities and outlining project progress for stakeholders.
  • Handled scheduling of subcontractors and staff to complete projects within required timeframes.
  • Coordinated on-site construction shutdowns, testing and inspections, reporting details and concerns to designated team supervisors.
  • Increased customer satisfaction by solving problems and concerns effectively.
  • Worked with inspectors, workers and unions, to conduct weekly status updates.
  • Conducted walk-throughs with clients prior to project close, completing punchlists and answering all questions.
  • Continuously inspected job sites for observation of safety protocols by staff and subcontractors.
  • Coordinated equipment use and maintenance to create safe working environment, limit accidents and prevent damages.
  • Led weekly production and operations contractor meetings, facilitating stronger communication and helping to resolve critical issues.


Foreman- Labor Operator

Western Construction
Prestonsburg , KY
2007.01 - 2016.01
  • Oversees Installation of new steel pipe and poly pipe ranging in size from 2 inch to 42 inch's, also, installation of split T and stopple.
  • Determined materials needed for daily shift and loaded vehicles with equipment and supplies.
  • Operated Equipment such as excavator, dozers, side boom, skid steer, fork lift, and man lift.
  • Reviewed blueprints and job specifications to plan completion and estimate project costs.
  • Read and understood orders to accurately measure, cut and lay out needed materials.
  • Removed imperfections and applied chemical solutions to treat materials and achieve smooth finishes.
  • Collected measurements and marked locations as part of project preparations.
  • Directed traffic away from hazardous locations to protect team members and general public.

Education

GED -

Ervinton High School
2001.05 -

Skills

OSHA compliance,

undefined

References

Herb Swiger

Owner, CEO of Western Construction

(606) 422- 3515


David Ryan

Construction Manager

(601) 870-5044


Andrew Johnson

Construction Manager

(225) 421-9798

Timeline

Superintendent

Tucker Energy Solutions
2016.01 - Current

Foreman- Labor Operator

Western Construction
2007.01 - 2016.01

GED -

Ervinton High School
2001.05 -
Kenneth Watkins Superintendent