Summary
Overview
Work History
Skills
Languages
Timeline
Generic

Kevin Cooper

Glendale,AZ

Summary

Dedicated Metal Stud Framer with proven expertise at Pete King Construction, consistently delivering high-quality results through meticulous adherence to safety protocols and efficient installation practices. Known for strong measuring skills and reliability, I actively contribute to project planning and foster teamwork to ensure minimal site impact and optimal project outcomes.

Overview

8
8
years of professional experience

Work History

Metal Stud Framer

Pete King Construction
06.2018 - 07.2025
  • Delivered high-quality results consistently through diligent adherence to company standards and guidelines for each project undertaken.
  • Provided valuable input during project planning phases, contributing expertise on best practices for efficient metal stud framing installation.
  • Ensured minimal site impact through proactive measures such as using drop cloths or barriers when cutting metal studs.

General Labor Construction Worker

Capstone Construction
05.2017 - 06.2018
  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Assisted in ensuring accurate measurements and proper material usage for optimal resource management on projects.
  • Operated power equipment to move materials and promote job efficiency.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Loaded and unloaded materials onto trucks and trailers.
  • Used variety of hand and power tools to complete tasks.

Skills

  • Measuring skills
  • Punctuality
  • Hand tool proficiency
  • Heavy lifting
  • Teamwork and collaboration
  • Metal stud framing
  • Reliability
  • Safety protocols and procedures

Languages

English

Timeline

Metal Stud Framer

Pete King Construction
06.2018 - 07.2025

General Labor Construction Worker

Capstone Construction
05.2017 - 06.2018
Kevin Cooper