Summary
Overview
Work History
Skills
Languages
Timeline
Generic

Kevin Delgado

Houston,TX

Summary

Resourceful Mechanic known for high productivity and efficient task completion. Specialize in diagnostics, repair techniques, and preventative maintenance. Excel in time management, problem-solving, and adaptability to new technologies or procedures. Committed to safety standards and effective communication to ensure job success.

Overview

2
2
Languages
2
2
years of professional experience

Work History

Tower Mechanic

REPCON
2026.01 - 2026.07
  • Removed and installed tower internals to ensure optimal functionality, including trays, packing, and demister pads
  • Adhered to OSHA and refinery safety standards in confined-space, lockout/tagout, and fall-protection procedures
  • Disassembled and reassembled flanges, manways, and piping during scheduled maintenance and turnarounds
  • Rigged and moved heavy components in and out of towers using cranes, chain falls, and come along to facilitate maintenance operations

Boilermaker

Brown & Root Industrial Services
2025.09 - 2025.12
  • Verified proper installation, alignment, and orientation of studs according to job specifications to maintain structural integrity.
  • Executed removal of channel heads, floating head, and dollar plate to facilitate maintenance and ensure equipment reliability.
  • Monitored exchanger pressure to confirm system integrity during operations.

Boilermaker

Performance
2025.02 - 2025.08
  • Removed and installed PSV valves to ensure system integrity and compliance
  • Installed and maintained fin fans in operational systems
  • Operated control valves, butterfly valves, and gate valves for effective system regulation
  • Monitored and adjusted system parameters to prevent high and low pressure fluctuations
  • Utilized high torque rat guns and large torque wrenches for precise assembly and maintenance

Boilermaker

Wyatt Field Service
2024.07 - 2025.01
  • Installed and tested fin fans in HVAC systems to ensure optimal airflow and efficiency.
  • Installed and maintained control valves, including butterfly and gate valves, to regulate system performance.
  • Remove and install PSV valves
  • Monitored and adjusted installations to eliminate high/low spots and bird mouths, ensuring proper alignment and function.
  • to conclude the finish, we are using high torque Rat guns, in lines and big torque wrenches

Skills

  • Pressure testing
  • Hydro tree setup
  • NCCR certification
  • TWIC certification
  • Troubleshooting
  • Work order management

Languages

Spanish
Professional
English
Professional

Timeline

Tower Mechanic

REPCON
2026.01 - 2026.07

Boilermaker

Brown & Root Industrial Services
2025.09 - 2025.12

Boilermaker

Performance
2025.02 - 2025.08

Boilermaker

Wyatt Field Service
2024.07 - 2025.01
Kevin Delgado