Summary
Overview
Work History
Education
Skills
Personal Information
Citizenship
Accomplishments
Timeline
Project Manager – Greenfield & Brownfield

Kevin Price

MODEC America Inc.
Cypress,TX
2027
years of professional experience

Project manager and installation engineer with broad offshore oil and gas experience across EPC, EPIC, and brownfield work. Leads engineering, procurement, fabrication, logistics, and commissioning for FPSO, mooring, and life extension projects, with a record of coordinating multinational teams and delivering complex scopes across global work fronts.

Work History

Project Manager – EPC MV34 Disconnectable Tower Yoke FPSO

10 Years 7 Months
MODEC America Inc. | , Mexico | 04.2016 - Current
  • Coordinated engineering, procurement, fabrication (Mexico, China), and commissioning across global work fronts (Canada, Italy, UK, Norway, Germany, USA), achieving successful project delivery amid COVID-19 pandemic challenges.
  • Delivered first-in-industry disconnectable mooring system for shallow water offshore Mexico, enhancing operational capabilities.
  • Developed system features including patented gimbal connector, dual chain pendants, and rapid-release hydraulic winch system, contributing to innovative project solutions.

Project Manager – Greenfield & Brownfield

10 Years 8 Months
MODEC America Inc. | Houston, Texas | 03.2016 - Current
  • Directed multi-million-dollar Life Extension projects for key FPSOs (MODEC’s Bongkot, Pra-1, Baobab) in Thailand, Brazil, and West Africa.
  • Managed cross-functional SOFEC Engineering, Procurement, and Logistics teams to coordinate all engineering activities, procurement/delivery of parts, and technician mobilization for offshore inspections.

Project Manager – Enbridge, Walker Ridge Pipeline Gathering Project, US GoM

6 Years 2 Months
EMAS AMC | 02.2010 - 04.2016
  • Managed the EMAS project team for the execution of six (6) offshore campaigns utilizing three distinct EMAS assets.
  • Scope included design, engineering, procurement, and installation preparation for suction pile and manifold installation, five jumper fabrications/installations, pipeline crossings, span rectifications, and pre-commissioning support.

Offshore Installation Engineer

3 Years 5 Months
SMB Atlantia/SBM Offshore | 08.2006 - 01.2010
  • Thunder Hawk Semi-Submersible (US GOM): Installation lead for the hook-up of moorings to the platform, including management of installation of driven piles. Responsible for operating tensioning equipment for removal of construction stretch from polyester mooring line sections.
  • CALM Buoy Expertise: Led remediation/replacement projects for CALM buoys in Trinidad & Tobago (bearing replacement) and Chile (anchor installation/pre-tensioning).
  • Akpo CALM Buoy (Nigeria): Developed ballast plan and performed all associated stability analysis for buoy load out and float-off using a submersible barge.

Pipeline Fabrication Engineer – Chevron Texaco Lobito Tomboco Project

1 Year 9 Months
Subsea 7 | , Angola | 11.2004 - 08.2006
  • Project Field Engineer / Site Manager (1 year in Luanda): Led engineering, logistics, and site management for the EPIC contract involving 120 kms of rigid flowlines, umbilicals, jumpers, and manifolds.
  • Spoolbase Establishment: Sourced, transported, and mobilized all equipment/supplies to successfully set up and operate the Subsea 7 spoolbase in Luanda on time and on budget.
  • Managed all welding, NDE, and field joint coating subcontractors, overseeing approximately 150 multi-national personnel for pipeline fabrication and vessel spooling scope.

Staff Naval Architect / Installation Engineer

3 Years
Sea Engineering Inc. | 11.2001 - 11.2004
  • Installation Support: Provided pre-installation and offshore support for the Marco Polo TLP project, including development of ballast plans, pump flow rate monitoring, and quayside/offshore ballasting for lock-off draft achievement.
  • Weight Management: Developed weight management procedures, methodologies, and tracking systems (initial estimates, tracking, and final reporting) for multiple platform types (TLPs, Spars, FPU, Semi-Subs). Provided steel material take-off for client procurement.
  • Project Naval Architect: Led concept development for a Wave Dodger Near Surface Production System. Responsible for all weight management, stability, and transportation/installation stability analysis using GHS and StabCAD software.

Staff Naval Architect

1 Year 6 Months
Trinav Consultants Inc. | 05.2000 - 11.2001
  • Design & Analysis: Responsible for the design of FRP and FRP/wood fishing vessels (45 ft. to 65 ft.), including lines plans, structural layout, stability analysis, propeller/shaft selection, and weight management.
  • Regulatory & Field Work: Performed lines lifting, vessel inclining, and stability calculations for submission to the Canadian Department of Fisheries and Oceans - Marine Safety Branch. Served on a team with the Canadian Coast Guard to establish new stability booklet procedures.

Project Manager – JUBILEE FPSO Bearing and Mooring Remediation

MODEC America Inc. | , Ghana, West Africa
  • Led engineering and logistics to develop a full case for operation for the FPSO operator.
  • Successfully managed the stabilization of the damaged main turret bearing and the design/procurement of a new mooring system, converting the FPSO from an external turret to a spread moored system.

Project Manager/Installation Manager

EMAS AMC
  • Zaftro & Serpentina FPSO Mooring Line Rectification/Replacement (Equatorial Guinea, West Africa): Managed fast-tracked, emergency mooring line change-outs, including development of all required offshore procedures, managing installation vessels, and overseeing replacement of anchors and mooring lines.

Project Manager/Installation Manager

EMAS AMC
  • PSVM & Jubilee FPSO Installation (Angola & Ghana, West Africa): Led development of specifications and procedures for FPSO hook-up in deepwater (1000m to 2100m). Managed EMAS teams on the FPSO for mooring line hook-up, riser reinstatement, and offloading hose assembly.

Education

Naval Architecture Diploma

Marine Institute of Newfoundland | 01-2000

Skills

Project & Program Management (EPC/EPIC/Brownfield)
FPSO/FPU Life Extension & Remediation
Offshore Installation & Commissioning
Budget management
Global Supply Chain & Logistics Management
Multi-Disciplinary Team Leadership
Contract Management
Offshore project management
Cross functional coordination
Fabrication planning
Commissioning support
Stakeholder communication
Risk management
Team leadership

Personal Information

Nationality: Canadian/US

Citizenship

Canadian and United States Citizen

Accomplishments

  • Academic Achievement Award - June 2000

Timeline

Project Manager – EPC MV34 Disconnectable Tower Yoke FPSO

MODEC America Inc.
04.2016 - CurrentRead More

Project Manager – Greenfield & Brownfield

MODEC America Inc.
03.2016 - CurrentRead More

Project Manager – Enbridge, Walker Ridge Pipeline Gathering Project, US GoM

EMAS AMC
02.2010 - 04.2016Read More

Offshore Installation Engineer

SMB Atlantia/SBM Offshore
08.2006 - 01.2010Read More

Pipeline Fabrication Engineer – Chevron Texaco Lobito Tomboco Project

Subsea 7
11.2004 - 08.2006Read More

Staff Naval Architect / Installation Engineer

Sea Engineering Inc.
11.2001 - 11.2004Read More

Staff Naval Architect

Trinav Consultants Inc.
05.2000 - 11.2001Read More

Project Manager – JUBILEE FPSO Bearing and Mooring Remediation

MODEC America Inc.
Read More

Project Manager/Installation Manager

EMAS AMC
Read More

Project Manager/Installation Manager

EMAS AMC
Read More

Marine Institute of Newfoundland

Naval Architecture Diploma
Read More
Kevin Price