Detail-oriented professional transitioning to semiconductor industry as Entry-Level Technician. Strong adaptability and aptitude for mastering complex documentation ensure compliance with cleanroom standard operating procedures. Focused on supporting high-volume fabrication production while prioritizing quality and precision in a fast-paced environment.
Work History
Material Handler
9 Years 7 Months
Ichor Systems | 04.2017 - Current
Received, inspected, and verified incoming shipments against purchase orders and packing slips
Unloaded deliveries and organized stock for efficient storage and distribution
Documented discrepancies, damages, and shortages for prompt resolution
Maintained accurate inventory records using receiving and warehouse tracking systems
Prepared materials for stocking, labeling, and routing to proper storage locations
Trained new staff on receiving procedures, safety practices, and documentation standards
Improved dock workflow by streamlining receipt processing and prioritization of urgent deliveries
Unloaded pallets and deliveries and organized products in warehouse.
Delivery Driver
1 Year 3 Months
Bellagios Pizza | 08.2016 - 11.2017
Delivered orders promptly while verifying accuracy, customer details, and special instructions
Navigated optimized routes to maintain on-time service and reduce delays
Coordinated with kitchen staff to prioritize high-volume deliveries and curbside handoffs
Inspected vehicle condition before shifts to support safe, reliable operation
Resolved delivery issues professionally, including address changes, missing items, and customer concerns
Assembly Line Worker
3 Months
Nortek Air Solutions | 08.2016 - 11.2016
Interpreted work instructions and blueprints to complete accurate assembly tasks.
Assembled HVAC components using hand tools, power tools, and production specifications.
Inspected finished units for defects, ensuring consistent quality and compliance.
Maintained safe, organized workstation while following plant safety procedures.
Operated various tools, machinery, and equipment to complete assembly tasks efficiently and accurately.
Assembler
3 Months
Davis Tool, INC | 05.2016 - 08.2016
Assembled precision components using hand tools, power tools, and blueprints.
Inspected finished assemblies for defects, fit, and alignment.
Operated production equipment while following safety and quality standards.
Interpreted work instructions, schematics, and routing documents accurately.
Cashier
11 Months
7-11 Convenience Stores | 06.2015 - 05.2016
Processed cash, card, and mobile payments accurately at point of sale.
Balanced register drawer and resolved discrepancies following store procedures.
Verified customer age for tobacco, alcohol, and lottery sales compliance.
Restocked shelves, coolers, and impulse displays to maintain product availability.
Waiter
2 Years 2 Months
West Hills Health & Rehabilitation Center | 03.2013 - 05.2015
Assisted residents with menu choices, promoting comfort and satisfaction during mealtimes.
Verified meal selections against special instructions to support safe, individualized dining service.
Served meals to residents promptly, following dietary restrictions and portion guidelines.
Coordinated meal delivery with kitchen staff to support smooth dining service.
Verified tray accuracy against resident diet orders before distribution.
Solar Panel Installer
5 Months
MG Company | 06.2011 - 11.2011
Installed solar panels on residential properties, ensuring compliance with safety regulations and optimal energy efficiency.
Conducted quality control inspections to ensure product standards.
Oversaw team operations to achieve project goals and improve performance.
General Manager
10 Months
San Carlos Roofing | 07.2009 - 05.2010
Developed roof estimates and coordinated installation processes
Managed team to ensure productivity
Conducted quality control inspections and maintained site cleanliness
General Laborer
10 Months
Ron Melrose Heating and Air Conditioning | 07.2008 - 05.2009
Completed air conditioning installation projects for customer satisfaction
Responded to service calls to address customer needs and resolve issues promptly
Ensured quality standards were met and cleaned job site for safety
General Laborer
2 Years 1 Month
Tom Olson Construction | 04.2006 - 05.2008
Prepared sites for demolition by clearing debris and ensuring safety protocols were followed.
Constructed basic framing structures for residential buildings, ensuring adherence to design specifications.
Performed site cleanup to remove debris and ensure a safe working environment.
General Laborer
3 Years 8 Months
West-Bay Roofing | 07.2002 - 03.2006
Prepared job estimates and coordinated roof preparation tasks
Supported roofing team during installations
Conducted quality control checks and performed site cleanup
Tire Service / Lube Tech
3 Months
Tire Pro's | 03.2002 - 06.2002
Performed tire installations and oil changes, ensuring vehicle readiness and customer safety
Performed safety inspections to identify potential hazards
Provided customer service by addressing inquiries and ensuring a positive service experience
Store Clerk
3 Years 6 Months
Piler and Lillie's Grocery Store | 09.1998 - 03.2002
Maintained stockroom organization and stocked shelves to ensure product availability
Addressed customer inquiries and resolved issues
Operated baling machine for efficient box recycling