Summary
Overview
Work History
Skills
Timeline
Generic

KEVIN RODRIGUEZ

Sealy,TX

Summary

Detail-oriented Electrician with expertise in installing and maintaining electrical systems, including three-phase power distribution. Efficiently interprets blueprints and electrical drawings to uphold safety standards. Excels in troubleshooting electrical faults using meters and schematics, enhancing operational reliability. Conducts megger tests to verify insulation resistance, ensuring the safety and functionality of electrical cables.

Overview

7
7
years of professional experience

Work History

Electrician

C.U.R
Katy, Texas
06.2026 - Current
  • Install proper cable to MER buildings
  • Installed cable trays and conduits to support electrical systems
  • Inspected motors, panels, and circuits to ensure safe, reliable operation
  • Troubleshot electrical faults using meters, schematics, and control diagrams to restore functionality
  • Conducted megger tests on electrical cables, ensuring insulation resistance met safety standards
  • Read blueprints and electrical drawings to complete installation and repair work.
  • Performed electrical installations, maintenance and repairs of electrical systems, wiring, fixtures and components.
  • Worked extensively on three-phase, 277/480 volt power distribution systems.

Electrician

ABB
Houston, TX
02.2025 - 02.2026
  • Installed and wired transformers, service panels, control panels, and switchgear to support reliable electrical operations
  • Planned layout and installation of electrical wiring, equipment, and fixtures for optimal functionality and compliance
  • Analyze electrical schematics and drawings
  • Interpret drawings & wiring diagram
  • Install conduit(aluminum, rigid, emt)
  • Install cable tray
  • Conducted megger tests on electrical cables, ensuring insulation resistance met safety standards
  • Performed tests to check continuity in circuits for proper functionality

Electrical Foreman

PIC
Spring, TX
09.2022 - 11.2024
  • Install and wire transformers, service panels, control panels, mcc's switchgear
  • Implemented safety protocols to minimize risk and ensure job safety
  • Planned layout and installation of electrical wiring, equipment, and fixtures to optimize functionality
  • Interpreted electrical drawings and wiring diagrams to ensure accurate installation
  • Analyzed electrical schematics to ensure accurate implementation of designs
  • Interpret drawings & wiring diagram
  • Installed and wired transformers, service panels, control panels, and switchgear to support system operations
  • Performed megger tests on cables to assess insulation integrity
  • Tested continuity of circuits using multimeter to verify electrical connections
  • Operated heavy equipment such as compactor, boom lift, forklift, and trencher for site preparation

Electrician

Enerflex
Houston, TX
01.2020 - 09.2022
  • Plan layout and installation of electrical wiring, equipment & fixtures
  • Planned layout and installation of electrical wiring, equipment, and fixtures to ensure compliance with safety standards
  • Reviewed and interpreted electrical drawings and wiring diagrams to ensure accurate installations.
  • Installed aluminum, rigid, emt, and underground conduit to facilitate effective electrical distribution
  • Analyzed electrical schematics and drawings to ensure accurate understanding of systems.
  • Interpret drawings & wiring diagram
  • Performed megger testing on cables to verify insulation quality and prevent electrical failure.
  • Executed continuity tests on electrical circuits to verify proper connections and functionality.

Skills

  • Blueprint reading
  • Control panels
  • Conduit installation
  • Power distribution
  • Safety compliance
  • Team coordination
  • Team player
  • Bi-lingual
  • Schematic reading

Timeline

Electrician

C.U.R
06.2026 - Current

Electrician

ABB
02.2025 - 02.2026

Electrical Foreman

PIC
09.2022 - 11.2024

Electrician

Enerflex
01.2020 - 09.2022
KEVIN RODRIGUEZ