Work Preference
Summary
Overview
Work History
Education
Skills
Personal Information
Timeline
Generic
KEVIN J ROBERTS
Open To Work

KEVIN J ROBERTS

OOLOGAH,OK

Work Preference

Desired Job Title

Electrical AssemblerElectrical AssemblerInterim Team LeadPanel WirerPANEL SHOP SUPERVISOR

Work Type

Full Time

Location Preference

On-Site
Location: OOLOGAH, OK, US
Open to relocation: No

Summary

Experienced Panel Shop Supervisor/ I&E Team Leader/Electrician/Foreman/Project Manager for Hire. Dear Hiring Manager, I'm contacting you in regards to a position at your company. I am very interested in further particulars and in filling out an application. Resourceful Team Member with proven history of reliability and excellent work. Dedicated to quality assurance and maximizing daily progress. Expert in electrical equipment use, maintenance and emergency repairs. Proven leader with exemplary workplace focus and productivity. Seasoned in production of electrical products in most settings. Dedicated manufacturing team member skilled in team-based settings and experienced in leadership and assembly positions. Stepped into any role and producing consistent, high-quality work. Enthusiastic Group Leader eager to contribute to team success through hard work, attention to detail and excellent organizational skills. Clear understanding of NEC and electrical installation. Motivated to learn, grow and excel in electrical or assembly industry. enclosed resume details will show you that I have the career history. I can be reached for an interview at your convenience. I look forward to meeting to discuss your business needs and how I can contribute to your success.

Experienced with assembling electrical components and systems efficiently and accurately. Uses skills in troubleshooting and quality control to ensure all projects meet high standards. Knowledge of industry safety protocols and effective communication within team environments.

Electrical assembly professional committed to high standards and delivering results. Experienced in assembling and testing electrical components and systems, ensuring reliable performance. Strong focus on team collaboration and adaptability to changing needs, known for reliability and effective problem-solving skills.

Hardworking production assembly team member offering significant background in Area of expertise. History of successfully aligning output with quality and performance targets. Highly organized approach reducing errors and materials waste through proactive controls.

Overview

2026
2026
years of professional experience

Work History

Electrical Assembler

HMH (DrillForm)
Tulsa, OK
03.2025 - Current
  • Interpreted schematics and blueprints to assemble and install electrical wiring and components.
  • Analyzed product dimensions and clearances for compliance with OEM specifications.
  • Maintained high product quality through strict adherence to standard operating procedures.
  • Ensured a safe work environment by following safety guidelines and using personal protective equipment.
  • Trained new team members on assembly techniques, improving overall team performance.
  • Increased production efficiency by identifying and eliminating bottlenecks in assembly process.
  • Optimized workspace layout to enhance productivity and reduce project turnaround times.
  • Collaborated with management and design teams to meet strict production specifications.

Electrical Assembler

OGI PROCESSING
Sand Springs, OK
08.2025 - 09.2025
  • Interpreted schematics and blueprints to assemble and install electrical wiring and components.
  • Analyzed dimensions and clearances of parts for compliance with OEM specifications.
  • Ensured product quality through strict adherence to standard operating procedures during assembly.
  • Maintained a safe work environment by following safety guidelines and wearing personal protective equipment.
  • Optimized workspace layout to enhance productivity and reduce project turnaround times.
  • Installed conduit and electrical wiring in overhead raceways, adhering to blueprints and wiring diagrams.
  • Contributed to project success by meeting deadlines while ensuring accuracy in component assembly.
  • Complied with OSHA, EPA, and Flex Energy safety rules during job execution.

Interim Team Lead

Serva
Catoosa, OK
10.2024 - 03.2025

Construct and assemble panel and console systems, installing electrical wiring and components on Reel Trucks, Cement Mixer Trucks, and Command Centers.

Panel Wirer

Siemens Manufacturing
Broken Arrow, OK
05.2024 - 08.2024
  • Demonstrated strong adaptability and quick learning in fast-paced environments.
  • Collaborated effectively within teams, providing support and guidance to peers.
  • Assisted with day-to-day operations, ensuring productivity and efficiency.
  • Exhibited attention to detail while completing assignments to high standards.
  • Maintained organization and a strong work ethic in all tasks undertaken.
  • Fostered respect and friendliness, contributing positively to team dynamics.
  • Worked independently to achieve goals while remaining responsive to team needs.

PANEL SHOP SUPERVISOR

Victory Energy
Collinsville, Ok
03 2021 - 05 2024
  • Provide management with scheduling and production updates of controls installation on boilers.
  • Attended business strategy meetings to help attain the furture goals of the business.
  • Created kitting processes for conduit and controls for boilers and trained personnel on the processes.
  • Organized panel shop materials to make kitting more efficient and setup a VMI system for commonly used materials.
  • Brought 5S audit scores from nearly 0 to an almost perfect 4. Educated team members on the importance of 5S and organization.
  • Assist team members with building control panels and the installation of control systems on boilers.
  • Ensured adherence to company policies, safety regulations, and local laws by educating staff about compliance requirements.
  • Developed strong team dynamics, fostering a positive work environment for all staff members.
  • Streamlined operations through effective employee scheduling and task delegation.
  • Maintained a clean and organized shop floor, promoting an inviting atmosphere for customers.
  • Oversaw daily operations, ensuring that all tasks were completed accurately and on time.

Group Leader

Honeywell
Catoosa, Ok
03 2013 - 03 2021
  • Provided management with materials and schedule information through up-to-date daily logs and detailed production reports.
  • Mentored junior team members on protocols and procedures of each station to maximize contributions.
  • Created schedules for teams to follow and complete tasks in a timely manner.
  • Trained new employees and promoted supportive, performance-oriented atmosphere by, instructing each in use of machinery, standard operating procedures and company policies.
  • Maximized productivity by keeping detailed records of daily progress and identifying and rectifying areas for improvement.
  • Created new methods of kitting projects to decrease cycle time and increaseperformance.
  • Utilized computer-aided design to lay out new electrical systems.

I & E Team Lead:

  • Lead Instrumentation and Electrical Installation Team in installation of instruments and electrical wiring and tubing by mentoring on the electrical codes for Rigid conduit installation.
  • Held classes on how to read the NEC on conduit fill and how to calculate cable fill of various types of conduit.
  • Ordered all necessary materials for projects including: Electrical conduit, cables, wire, various sizes of tubing and fittings for upcoming projects.
  • Managed project schedules by reassigning personnel as priorities changed.
  • Mentored team members in the process of kitting and assembly, on newprojects, by working hands on with them.
  • Created consistency and reduced cycle time by creating kitting books for conduit installations on standard projects.
  • Through research, created more efficient methods for marking terminal blocks, wire tags, and cables.
  • Mentored the team in efficient ways to manage their time to get other requirements accomplished, that didn't include building skids.
  • Created an I&E kitting area to build conduit kits and prep instruments prior to skids being ready for I&E installation.

I&E Team Member:

  • Learned the installation process conduit and tubing on many different skids.
  • Learned how to read P&ID and follow the process flow to tag valves and check the installation of valves and piping for correct flow direction.
  • Learned how to read all documents necessary to build a skid, such as: P&ID, spool drawings, GA's, and Structural drawings
  • Collaberated with other team members to create a full valve tag list for each skid. This reduced overall tagging process time by half for standard skids.
  • Helped to develop kitting processes for all standard skids. This reduced I & E controls installation by over 50%.
  • Helped to create a more efficient stream lined installation of conduit to help the team to get on skids earlier and to reduce cycle time.

LEAD ELECTRICIAN

Madison Industries
Sapulpa, Ok
02 2012 - 03 2013
  • Installed complete electrical sytems in new modular buildings.
  • Repaired and installed new fixtures, wiring, circuits and motors.
  • Operated tools according to prescribed safety practices.
  • Interpreted electrical codes and diagrams to complete electrical repair and installation tasks.
  • Trained junior electrical professionals on proper procedures.
  • Diagnosed issues and developed effective solutions.
  • Installed and wired electrical hardware, including transformers, junction boxes, service panels, electrical boxes, switches and circuit breakers.
  • Installed safety and distribution components for electrical systems, such as switches, resistors and circuit-breaker panels.
  • Tested electrical systems functionality and continuity of circuits using devices such as ohmmeters, voltmeters, and megar.
  • Executed electrical wiring plans for Car wash equipment and other electricalsystems.
  • Managed business administration duties, including report generation, recordkeeping, material ordering, and estimating.
  • Demonstrated expertise in use of cable reels, stripping tools, voltage detectors, crimping tools and wire and cable cutters to complete fast-paced work.
  • Installed, tested and modified circuit breakers, controls, fuses, lights and motors.
  • Consistently updated knowledge of safety requirements and policies.
  • Planned layout and installation of electrical wiring, equipment and fixtures based on specifications and applicable codes.
  • Effectively worked with multi-craft team; providing wiring installation, preventive maintenance and testing of equipment.
  • Installed 120/208 volt systems and 277/480 volt systems.
  • Performed electrical system installation of conduit, wire, power distribution and motor controls.
  • Replaced and repaired lighting fixtures and electrical control, and distribution equipment, including switches, relays and circuit breaker panels.
  • Tested electrical systems and continuity of circuits in electrical wiring,equipment and fixtures using various testing devices
  • Applied knowledge of trade tools and ability to read and follow blueprints andwiring plans to projects
  • Adhered closely to NEC and NFPA regulations and industry best practices.
  • Read and interpreted electrical, mechanical and architectural drawings and electrical code specifications for wiring layouts.
  • Spliced, joined and connected wire to fixtures and other electrical components
  • Interpreted drawings, wiring diagrams, flow charts and written descriptions of project requirements.

Electrician:

  • Assisted the foreman with electrical installations of small kiosks and buildings.
  • Performed rough-in, trim, and testing of electrical circuits installed.
  • Performed check-in of materials received and noted all discrepancies.
  • Performed maintenance on various plant equipment such as:Dust collector, conveyor systems, air conditioning systems, and all other equipment.

Warehouse receiving and shipping:

  • Re-organized warehouse to meet the production schedules and to help pick orders faster for the assembly teams.

PROJECT MANAGER

Prime Electric
Edmond, OK
03 2009 - 03 2011
  • Developed and initiated projects, including managing costs, schedule and performance.
  • Identified plans and resources required to meet project goals and objectives by setting realistic timelines and checkpoints.
  • Developed implementation methodologies to rein in project costs while meeting key milestones.
  • Eliminated discrepancies by reviewing performance, status and safety adherence.
  • Orchestrated projects within strict time frames and budget constraints by solving complex problems and working closely with senior leaders.
  • Provided management for 25+ internal personnel, contractors and vendors.
  • Drove team success through shared vision and recognition of quality performance.
  • Oversaw projects for electrical installation by planning, designing, and scheduling.
  • Modified and directed project plans to meet organizational needs.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Managed all phases of projects up to a $1,000,000 electrical installation from procurement to commission.
  • Created close out documents for customers.

Electrical Foreman

  • Outlined underground conduit installations to maximize electrical installation and reduce cost.
  • Laid out conduit installation and circuiting of projects within the interior of the building.
  • Lead team of 5 to 25 persons to efficiently install electrical systems and meet schedules by mentoring and demonstrating conduit bending and wire pulling techniques.
  • Followed project specifications and guidelines for material use and installation methods.

Education

Electrical Journeyman License - Electrical NEC

ELECTRICIAN IEC
Seattle, Wa

GED -

Lincoln Academy
Newcastle, Me
06.1985

Skills

  • Industrious Foreman Electrician with expertise in project management and electrical troubleshooting Effective leader completes tasks quickly Proficient in installing electrical outlets and connecting wires to central circuit panels Offering [Number] years of dedicated service
  • Checked safety credentials and licenses for electrical crew members to comply with corporate rules
  • Analyzed blueprints to determine where to run wires, install electrical outlets and connect wires to central circuit panels
  • Power distribution
  • Adhered to US Occupational Health and Safety Administration mandates requiring use of gloves and insulating blankets for installation of high-voltage equipment
  • Capable Foreman Electrician with over 30 years of experience in construction safety Skilled in use of power tools, saws and wire pullers Offering demonstrated proficiency in maintaining clean, organized and highly productive work area
  • Project Management
  • Supportive Foreman Electrician successful with guiding apprentices on installation procedures and duties Dependable and hardworking with 30 years of experience in electrical installations Proficient in completing projects on schedule and demonstrating safe work habits
  • Worked from ladders, scaffolds and roofs to install electrical wiring, equipment, and fixtures
  • Energetic Foreman Electrician recognized for excellence in electrical wiring, adherence to safety standards and leading crews to complete projects on time Successful in project planning and monitoring team performance Reliable and diligent individual
  • Improved panel building efficiency by streamlining assembly processes and implementing time-saving techniques
  • Implemented safety protocols to reduce workplace accidents and maintain a hazard-free environment for team members
  • Reduced project completion times by effectively managing resources and prioritizing tasks for optimal workflow
  • Consistently met or exceeded company targets in terms of both quantity and quality of completed panels
  • Promoted a culture of continuous improvement within the team by actively seeking feedback from colleagues and implementing suggestions for enhancing productivity and quality
  • Collaborated with engineering teams to ensure accurate design specifications and adherence to project deadlines
  • Streamlined communication channels within the team, fostering improved collaboration between departments for smoother project execution
  • Evaluated blueprints for accuracy before beginning each project, minimizing errors during the build process and saving valuable time on corrections later on
  • Electrical testing
  • Safety procedures
  • Wiring techniques
  • Blueprint reading
  • Training and mentoring
  • Schematic interpretation
  • ESD safety protocols
  • Component installations
  • Component installation
  • Control panel assembly
  • Precision measuring instruments
  • Hand tool expertise
  • Voltage meters
  • Multimeter usage
  • Electrical box assembly
  • Electrical component testing
  • Power source connection
  • Wiring assembly
  • Schematic reading
  • Assembly line experience

Personal Information

Timeline

Electrical Assembler

OGI PROCESSING
08.2025 - 09.2025

Electrical Assembler

HMH (DrillForm)
03.2025 - Current

Interim Team Lead

Serva
10.2024 - 03.2025

Panel Wirer

Siemens Manufacturing
05.2024 - 08.2024

Electrical Journeyman License - Electrical NEC

ELECTRICIAN IEC

GED -

Lincoln Academy

PANEL SHOP SUPERVISOR

Victory Energy
03 2021 - 05 2024

Group Leader

Honeywell
03 2013 - 03 2021

LEAD ELECTRICIAN

Madison Industries
02 2012 - 03 2013

PROJECT MANAGER

Prime Electric
03 2009 - 03 2011