Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Kien Chau

Renton,USA

Summary

27 years experienced in New Construction, Building Improvement, and Professional maintenance worker with strong expertise in building upkeep, repair, and preventative maintenance. Demonstrated ability to work collaboratively with teams, adapting to changing needs while ensuring efficient and reliable operation of facilities. Skilled in HVAC systems, electrical troubleshooting, plumbing, and general repairs, bringing reliability and precision to each task. Known for hands-on approach and focus on achieving tangible results.

Experienced with performing routine and emergency maintenance tasks efficiently and effectively. Utilizes problem-solving skills to identify and address issues before they escalate. Track record of maintaining safety standards and ensuring functionality of building systems.

Overview

26
26
years of professional experience

Work History

General Foreman

Andersen's Structures Inc.
06.2024 - Current
  • Supervised daily operations and ensured adherence to safety protocols across multiple projects.
  • Coordinated schedules and resource allocation for efficient workflow management on-site.
  • Conducted regular inspections to ensure compliance with industry standards and regulations.
  • Led safety training sessions, fostering a culture of safety awareness among all team members.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
  • Ordered necessary supplies and materials required for installation of new work and remodeling of existing systems.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Assigned daily duties to each employee based upon individual strengths, effectively completing [Number]% of roofing jobs on time.
  • Analyzed blueprints to determine where to run wires, install electrical outlets and connect wires to central circuit panels.
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Managed communication between subcontractors, suppliers, and project managers to streamline operations.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Provided feedback to workers on job performance and safety procedures.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Collaborated with property managers to develop and implement preventive maintenance programs.

Foreman

Sessler Inc.
05.2016 - 06.2023
  • Managed and oversaw multiple crews to maintain efficient scheduling, time, and cost.
  • Ordered materials and supplies to keep the project on schedule.
  • Kept accurate records of daily job tasks and progress.
  • Led and monitored safety and security procedures within crew.
  • Supervised and coordinated the daily activities of construction personnel to ensure work was completed on schedule and within budget.
  • Addressed customer inquiries promptly while providing accurate information about ongoing projects.
  • Collaborated with other departments to resolve problems related to workflow or staffing issues.
  • Developed and implemented cost-saving measures to increase profitability.
  • Trained workers in construction methods, operation of equipment, safety procedures, or company policies.
  • Read specifications, such as blueprints, to determine construction requirements or to plan procedures.
  • Assigned work to employees, based on material, and worker requirements of specific jobs.
  • Developed crew schedules, delegated tasks, monitored progress, and provided feedback as needed to ensure successful completion of projects.
  • Assisted in resolving customer complaints by quickly identifying problems that arose during a project's execution phase.

Accustical Ceiling Installer

GL System
07.2014 - 05.2016
  • Ensured that work areas were kept clean at all times by disposing of waste properly.
  • Installed acoustic ceilings to walls and ceilings in a timely manner, ensuring quality standards were met.
  • Utilized ladders, scaffolding, and lifts safely during installation process.
  • Read blueprints and other specifications to determine method of installation, work procedures and material and tool requirements.
  • Layed out work, according to blueprints and drawings, using tape measures, straightedges, and squares, and marking devices.

Metal Framer and Hanger

Northwest Partition
09.2013 - 06.2014
  • Proficient in reading blueprints and accurately measuring materials.
  • Exhibited strong problem-solving skills to troubleshoot any issues that arose during construction processes.
  • Successfully installed metal framing for a variety of commercial and residential projects.
  • Inspected completed work for quality assurance before finalizing project.
  • Cut steel studs for installation at predetermined lengths according to blueprints.
  • Followed safety protocols while working onsite including wearing appropriate PPE gear at all times.
  • Demonstrated expertise in cutting, shaping, joining, and securing steel frames to create structural supports.
  • Fabricated equipment according to blueprints or instructions from supervisors.
  • Read specifications or blueprints to determine locations, quantities, or sizes of materials required.

Construction Foreman

Norogachi Construction
06.2011 - 09.2013
  • Coordinated activities in order to meet project deadlines while maintaining quality standards.
  • Monitored daily operations at job sites including adherence to company policies and procedures.
  • Conducted weekly meetings with crew members discussing progress and any changes in plans.
  • Developed and implemented safety protocols for construction sites to ensure compliance with OSHA regulations.
  • Maintained accurate records of materials used, labor costs and progress reports for each job site.
  • Reviewed blueprints and specifications prior to commencement of work ensuring accuracy of plans.
  • Resolved conflicts between labor unions, contractors and other stakeholders on construction sites.
  • Managed and oversaw multiple crews to maintain efficient scheduling, time, and cost.
  • Ordered materials and supplies to keep the project on schedule.
  • Inspected work performed by subcontractors and laborers to check conformance with specifications.
  • Led and trained lower-skilled employees in safe and productive work procedures.
  • Reviewed work orders and verified equipment prior to starting job.
  • Completed assignments to meet customer response time objectives.
  • Resolved customer complaints to support customer satisfaction.
  • Read specifications, such as blueprints, to determine construction requirements or to plan procedures.
  • Assigned work to employees, based on material, and worker requirements of specific jobs.
  • Coordinated work activities with other construction project activities.

Metal Framer

Pacific Construction System
04.2007 - 05.2011
  • Repaired damaged metal frames quickly and efficiently according to customer specifications.
  • Exhibited strong problem-solving skills to troubleshoot any issues that arose during construction process.
  • Cut steel studs for installation at predetermined lengths according to blueprints.
  • Assisted coworkers with complex tasks as needed throughout the job site.
  • Successfully installed metal framing for a variety of commercial and residential projects.
  • Followed safety protocols while working onsite including wearing appropriate PPE gear at all times.
  • Collaborated closely with general contractors throughout each stage of project completion.
  • Inspected completed work for quality assurance before finalizing project.
  • Laid out and accurately fabricated structural iron.
  • Maintained, repaired and replaced steel components and fasteners.
  • Fabricated steel frames, columns, beams, and girders, according to blueprints and instructions from supervisors.

Restaurant Owner

Hon's Restaurant
02.2005 - 07.2008
  • Successfully managed daily operations of a restaurant including staff scheduling, customer service, and inventory management.
  • Provided excellent customer service by responding promptly to guests' needs.
  • Worked with staff to keep restaurant establishment up to food and health safety standards.
  • Ensured compliance with health codes, safety regulations, and other applicable laws.
  • Reviewed financial statements and sales reports to monitor business performance and make adjustments.
  • Created menu options that appealed to customers while meeting profitability goals.
  • Developed strong relationships with suppliers to ensure cost effective purchasing of food and beverage items.
  • Oversaw day-to-day operations of restaurant to maintain profitability.
  • Trained staff on food preparation techniques, cooking methods and food safety practices to maximize productivity.
  • Supervised staff productivity to address performance issues.
  • Established strong working relationships with vendors for better pricing terms.
  • Served as primary point of contact for customer inquiries or complaints.
  • Analyzed market research data to identify new opportunities for growth.
  • Counted money and made bank deposits.
  • Monitored employee and patron activities to enforce liquor regulations.
  • Scheduled and received deliveries and verified goods received against paperwork.
  • Maintained food and equipment inventories to support business demand.
  • Cooked food by tasting and smelling it to ensure palatability and flavor conformity.

Foreman

Finisher's Corp
07.1999 - 09.2005
  • Utilized advanced tools and equipment to complete project tasks.
  • Maintained a safe work environment by enforcing safety regulations, policies, and procedures.
  • Reviewed plans, drawings, blueprints and specifications prior to commencement of worksite operations.
  • Provided clear direction to staff regarding job duties, expectations and deadlines.
  • Ordered materials and supplies to keep the project on schedule.
  • Kept accurate records of daily job tasks and progress.
  • Led and monitored safety and security procedures within crew.
  • Supervised personnel on job sites, reporting tardiness and disciplinary issues to appropriate stakeholders.
  • Reviewed work orders and verified equipment prior to starting job.
  • Supervised and coordinated the daily activities of construction personnel to ensure work was completed on schedule and within budget.
  • Addressed customer inquiries promptly while providing accurate information about ongoing projects.
  • Monitored inventory levels of materials needed for projects while ensuring accuracy of orders placed.
  • Resolved conflicts between workers by acting as a mediator when disputes arose among employees.
  • Analyzed production schedules, manpower requirements and workflow to maximize efficiencies.
  • Attended meetings with clients, contractors and other stakeholders involved in building projects.
  • Collaborated with other departments to resolve problems related to workflow or staffing issues.
  • Scheduled shifts for employees based on their availability while taking into account workloads assigned.
  • Negotiated contracts with vendors for supplies necessary for projects completion in a timely manner.
  • Read specifications, such as blueprints, to determine construction requirements or to plan procedures.
  • Estimated material or worker requirements to complete jobs.
  • Provided assistance to workers engaged in construction and extraction activities, using hand tools, and other equipment.
  • Developed crew schedules, delegated tasks, monitored progress, and provided feedback as needed to ensure successful completion of projects.

Education

Apprenticeship Program -

Renton Technical College
Renton

Associate in Arts (A.A.) - undefined

North Seattle Community College

Project Management - Constructions

Renton Technical College
Renton
01.2008

High School Diploma - undefined

Cleveland High School
Seattle
06.1997

No Degree - Equipment And Safety Cordination

Northwest Carpenter Training Center
Kent, WA

Skills

  • Daily Reporting
  • Resource Allocation
  • Effective Communication
  • OSHA Compliance
  • Work Planning and Prioritization
  • Crew Scheduling
  • Construction Vehicles Operation
  • Workplace Safety
  • Job Planning
  • Crew Leadership
  • Maintenance management
  • Forklift operation
  • Preventive Maintenance
  • Emergency response
  • Environmental awareness
  • Construction safety
  • Schematics and Blueprints
  • Materials Management
  • OSHA Regulations
  • Problem Solving
  • Quality Control
  • Site Coordination
  • Scaffolding set up
  • Quality control standards
  • Manpower recruiting
  • Project milestones
  • Residential plumbing
  • Commercial plumbing
  • Subcontractor management
  • Hand and power tools
  • Job planning
  • Safety meetings
  • Team leadership skills
  • Construction supervision
  • Safety compliance
  • Site coordination
  • Work assignments
  • Blueprint analysis
  • Crew oversight
  • Daily planning
  • Coordinating tasks
  • Verbal and written communication
  • Wood and Metal Framing
  • Attention to Detail
  • Conflict Resolution
  • Staff Training
  • Decision Making
  • Structural Repairs
  • Electrical Installation
  • Material Ordering
  • Business Management
  • Drywall Installation
  • Equipment Oversight
  • Technical Knowledge
  • Task Delegation
  • Workforce Management
  • Safety Compliance
  • Blueprint Interpretation
  • Customer Relations
  • Workforce Scheduling
  • Dimensions and Measurements
  • Critical Thinking
  • Subcontractor Management
  • Construction Supervision
  • Adaptability
  • Blueprint Reading
  • Dedicated Work Ethic
  • Equipment Operation
  • HVAC Systems
  • [Language] Fluency
  • Site Measuring and Marking
  • Hand and Power Tool Operation
  • Supply Ordering
  • Schedule Determination
  • Production Optimization
  • Safe Operating Procedures
  • Labor Costing
  • Procedure Planning
  • Worker Supervision
  • Decision-Making
  • Assignment Delegation
  • Dependable and Hardworking
  • Equipment Safety Verification
  • Work Monitoring
  • Multi-Project Coordination
  • Specifications Conformance
  • Site Safety
  • Repair Coordination
  • Materials Estimation
  • Property Damage Assessment
  • Field Inspection
  • Lockout and Tagout
  • Safety enforcement

Languages

Vietnamese
Native or Bilingual
Chinese (Cantonese)
Professional Working

Timeline

General Foreman

Andersen's Structures Inc.
06.2024 - Current

Foreman

Sessler Inc.
05.2016 - 06.2023

Accustical Ceiling Installer

GL System
07.2014 - 05.2016

Metal Framer and Hanger

Northwest Partition
09.2013 - 06.2014

Construction Foreman

Norogachi Construction
06.2011 - 09.2013

Metal Framer

Pacific Construction System
04.2007 - 05.2011

Restaurant Owner

Hon's Restaurant
02.2005 - 07.2008

Foreman

Finisher's Corp
07.1999 - 09.2005

Associate in Arts (A.A.) - undefined

North Seattle Community College

Project Management - Constructions

Renton Technical College

High School Diploma - undefined

Cleveland High School

Apprenticeship Program -

Renton Technical College

No Degree - Equipment And Safety Cordination

Northwest Carpenter Training Center
Kien Chau