Summary
Overview
Work History
Education
Skills
Work Availability
Timeline
Generic

Kirk Petersen

Riverton,UT

Summary

Efficient Floor Installer with 7 years of hands-on experience placing floor coverings in both commercial and residential buildings. Reliable and punctual individual skillful in preparing accurate estimates, cutting and trimming carpet and tile and trimming excess material. First-rate communication, multitasking and time management abilities.

Overview

6
6
years of professional experience

Work History

Floor Installer/Polished Concrete/Caulker

National Construction Specialties
01.2021 - Current
  • Swept, scraped, and chipped dirt and irregularities from base surfaces and filled cracks with cement and putty to form smooth foundation.
  • Removed existing flooring to prepare and grind floor surfaces for new polished flooring.
  • Maintained excellent communication, cleanliness, and safety standards on work sites and projects, boosting customer satisfaction ratings 100%.
  • Spread adhesive cement over floor to prevent board joint wearing.
  • Took measurements and studied floor sketches to calculate area to be floored and amount of materials needed.
  • Operated sit-down forklift to dump slurry into slurry bins and keep work areas clean.
  • Coordinated with subcontractors to facilitate on-time delivery of supplies and flooring materials.
  • Formed tight and secure joints by removing excess materials and connecting individual pieces.
  • Recorded measurements and devised plans to match installation specifications.
  • Supplied accurate measurements and estimates for projects.

Flooring Installer

A N I Flooring
06.2017 - Current
  • Polishing Walmart's Super Centers across the Western United States, pulling up the existing tile and polishing the concrete underneath.
  • Re-locating for 8-12 weeks at a time to complete each Super-Center.
  • Taping off area with plastic to protect over splashing from the slurry and keep work area clean.
  • Engaged with customers and subcontractors and provided timelines for project completion.
  • Estimated materials and labor costs for concrete projects to manage project budgets.
  • Cutting and shooting the existing joints with polyurethane.
  • Operating a walk behind saw
  • Operating a CPS Grinder for each progression
  • Operating a Burnisher after sealing the floor to protect the shine.
  • Applying Densifier to harden the concrete and bring out the shine.

Education

High School Diploma -

Jordan High School
Sandy, UT

Skills

  • Excellent Work Ethic
  • Hand Tool Usage
  • Safety Protocol Knowledge
  • Precision Cutting
  • Contractual Obligations
  • Attentive to Detail
  • Training Junior Team Members
  • Estimate Generation
  • Critical Thinking
  • Strong Organization Skills

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Floor Installer/Polished Concrete/Caulker

National Construction Specialties
01.2021 - Current

Flooring Installer

A N I Flooring
06.2017 - Current

High School Diploma -

Jordan High School
Kirk Petersen