Summary
Overview
Work History
Education
Skills
Personal Information
Timeline
Generic

Kirk Watkins

Grantsburg,WI

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.


Skilled Maintenance Technician adept at interpreting blueprints, developing schedules and overseeing team operations. Well-versed in managing workflow and delegating tasks to meet objectives. Offering 20 years of repair and maintenance expertise with proven history or hard work and dependability.

Overview

31
31
years of professional experience

Work History

Machinist (locomotive mechanic)

BNSF Railway
12.2011 - Current
  • Diagnosed issues with a variety of mechanical systems on diesel locomotives such as engine components, air brake system, trucks, and traction motors.
  • Demonstrated expertise in repairing locomotive parts by efficiently handling tasks like disassembly and reassembly of mechanical components.
  • Performed maintenance and testing on mechanical systems, such as air, fuel, and oil filters. Additionally, calibrated pneumatic gauges with analog and digital test equipment. Verified pressure by adjusting fuel regulators.
  • Successfully navigated high-pressure situations by seamlessly transitioning between different responsibilities as needed, delivering efficient results without compromising adherence to protocols.
  • Demonstrated expertise in identifying and resolving locomotive system malfunctions through efficient use of diagrams, drawings, and technical references.
  • Utilized relevant specialized equipment and common hand tools to complete tasks
  • Operated and maintained various tools such as overhead crane, associated lifting rigs, and cargo securing equipment.
  • Proficient in the use of various hand tools such as impact guns, torque wrenches, calipers, micrometers, feeler gauges and dial indicators for mechanical tasks.

Maintenance Technician

Royal Concrete Pipe Inc
01.2001 - 12.2011
  • Skilled at ensuring the proper functioning of all hydraulic, electrical, pneumatic, and mechanical systems within a fully automated concrete pipe production facility
  • Successfully accomplished all tasks related to scheduled maintenance and emergency repairs while prioritizing efficiency and minimizing down-time.
  • Demonstrated exceptional attention to detail in all aspects of operations and workmanship
  • Collaborated with maintenance supervisor and purchasing department to expedite replacement parts and supplies for equipment
  • Efficiently modified work schedule to align with scheduling adjustments and equipment maintenance
  • Experienced with hand tools, computer controls, and diagnostic equipment
  • Deliver honest feedback and advice on machinery condition and equipment safety to management


Relief Operator

Royal Concrete Pipe
  • Consistently achieved high-quality production results, surpassing set targets
  • Provided effective leadership to a small team, ensuring their welfare and safety
  • Maximized efficiency through the use of computer monitoring equipment and making necessary adjustments to production programs.

Assistant Quality Assurance Manager

TeamVantage Molding
01.1998 - 01.2001
  • Guided a team of 3 quality assurance technicians in conducting inspections, addressing quality issues, and managing individual assignments
  • Aided engineering and sales staff by providing support for new product development, customer concerns, and technical data
  • Ensured precision in conducting quality checks for first article and prototype items
  • Proficient in precision measurement techniques and equipment calibration
  • Continuously enhanced knowledge through various training programs and seminars on Quality Control environment.
  • ISO 2001 Auditor
  • Consistently maintained a professional work ethic in demanding, time-critical environment
  • Successfully addressed concerns with faulty items, regardless of whether they were received via internal processes or returned by customers.
  • Implemented a systematic approach to product inspection by creating standardized visual guides for precise measurements and identification of recurring defects
  • Performed in-house audits of product to effectively reduce customer returns.

Machinist

Metal-Matic Inc
01.1994 - 01.1998
  • Skilled in the operation of manual machining equipment including cylindrical and surface grinders, milling machine and lathe
  • Effective use of precision measuring equipment
  • Supported maintenance department in repairing or making new parts for production equipment
  • Completed work assignments accurately and promptly
  • Adapted work schedule to meet staffing requirements and overtime
  • Performed all duties with minimal supervision.

Laborer

Metal Matic
01.1994 - 05.1995
  • Advanced rapidly from basic tasks to skilled operator positions
  • Successfully operated a variety of production equipment including: tube straightener, magnetic testing, push pointing, and chemical dip tanks
  • Performed a variety of janitorial duties such as: Tennant floor cleaning equipment, refuse and the recycling of hazardous chemicals.

Education

East Central High School
Sandstone, MN

Century Technical College

Skills

  • Highly skilled mechanic
  • Equipment Installation
  • Lockout and tagout procedures
  • Blueprint and schematic understanding
  • Equipment monitoring
  • Teamwork and Collaboration
  • Preventive Maintenance
  • Mechanical Troubleshooting

Personal Information

Title: Machinist (locomotive mechanic) - BNSF Railway

Timeline

Machinist (locomotive mechanic)

BNSF Railway
12.2011 - Current

Maintenance Technician

Royal Concrete Pipe Inc
01.2001 - 12.2011

Assistant Quality Assurance Manager

TeamVantage Molding
01.1998 - 01.2001

Laborer

Metal Matic
01.1994 - 05.1995

Machinist

Metal-Matic Inc
01.1994 - 01.1998

Relief Operator

Royal Concrete Pipe

East Central High School

Century Technical College
Kirk Watkins