Results-focused industrial engineering professional specializing in building and leading high-performance teams. High-performing leader and business developer. Dedicated to keeping companies in the forefront of manufacturing excellence.
Overview
6
6
years of professional experience
Work History
GSC Coordinator - Packaging Engineer
General Motors Co
04.2024 - Current
Help implement production pull system through RESS assembly.
Lead Engineer on GSC for ASRS with a focus on dealing with day to day throughput issues, fault response and equipment improvements.
Managed Container flow process for all Factory Zero RESS packaging.
Lead engineer for small lot and bulk part launch from 3rd party LOC.
Participated in container buy off with corporate containerization team for new and existing packaging.
Implemented 10 density improvement for current model year parts.
Increased line side part presentation to hold 5 hours of material for small lot parts.
Drafted TIS documents and delivery schedule for small lot operators.
49 CFR certified.
Container Planning Packaging Engineer
General Motors, GM
08.2022 - 04.2024
Designed concepts for general assembly parts and steel racks to ensure safety and ergonomic standards are met.
Sourced packaging concepts to suppliers for sample containers and production orders.
Worked with manufacturing plant and parts suppliers for container validation and sample buy off.
Knowledge and understanding of GVDP process and milestone requirements for packaging.
Worked and developed packaging concepts and cost saving statistics with expendable packaging department.
Conducted shake test analysis on wide variety of different packaging designs.
Performed SCCR studies for future program launches.
Developed and maintained relationships with suppliers to facilitate quality and timely delivery of materials.
Placed 1st in the 2022 GPSC WOC-Innovation Challenge.
Active member on the personal and professional development board for GPSC.
Participated in OpEx to solve critical delays in the financial transaction process.
Industrial Engineer
FCA/Stellantis Mack Assembly
10.2021 - 08.2022
Lead Industrial Engineer at Mack for General Assembly/Final.
Lead weekly meetings with production supervisors and area managers for increased throughput initiatives.
Conducted weekly meetings with Union officials for Final assembly and Quality on productivity and throughput issues.
Helped intergrade reporting tools for high warranty claims items and quality issues with in General Assembly.
Supervised production workers to determine problematic areas and implement solutions for optimized production.
Optimized material routes to reduce down time and reduced total number of tugger operators required throughout the plant.
Worked to reduce bottle necks throughout final assembly and quality testing to improve throughput.
Achieved 1 productivity position a week for 5 months starting in January 2022.
Trained entry level Industrial Engineers on MODAPTS.
Assisted in interview process for job applicants.
Launch Industrial Engineer
FCA/Stellantis Mack Assembly
05.2021 - 10.2021
Participated in station audits for work cell readiness.
Collected line speed data through out the plant on different lines in final assembly.
Tracked issues/collected data on pre-production pilot builds for upcoming launch.
Verified man assignments/MODAPTS validation on SWI and process sheets for new model launch.
Responsible for helping current plant IE with Trim 4, Trim 5, and Door Line at DACM.
Industrial Engineer
Flex-N-Gate
07.2019 - 05.2021
Liaison between plant automation and corporate automation for new product launch. Lead weekly equipment readiness meeting between integrators and plant.
Drafted plant layout for new welding cells, warehouse, and coil receiving for new program launch.
Conducted in plant buy off for all assembly cells from cycle time, dimensional, and machinery verification standards.
Managed final approval/buy off for finished good racks for 13 assembly parts on new program launch.
Handled initial design, RFQ's, and final buy offs for internal racks and containers.
Visited rack suppliers to track progress of the rack/container builds for the plant.
Worked with plant ergonomics to test and validate new racks designs for launch program.
Constructed and validated total fleet size for containers/racks for internal and external packaging.
Managed engineering changes for all new parts and assembly equipment.
Implemented 5S principles for improving organization and efficiency across all organization within plant.
Asia-Pacific Regional EHS (Environment, Health & Safety) Coordinator at Avon Products Mfg., Inc.Asia-Pacific Regional EHS (Environment, Health & Safety) Coordinator at Avon Products Mfg., Inc.