Summary
Overview
Work History
Education
Skills
Project history
Timeline
Generic

Koebi King

Pensacola,FL

Summary

Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Overview

6
6
years of professional experience

Work History

Project Engineer

Martin Concrete Construction
08.2023 - Current
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Developed detailed project plans to ensure timely completion and deliverables were met.
  • Provided and maintained layout
  • Identified risks and implemented mitigation strategies, minimizing potential issues during the project lifecycle.
  • Ensured quality control for all aspects of the project, reducing defects and rework.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.

Field Engineer

BL Harbert International LLC
02.2021 - 08.2023
  • Identified any key changes to project that could affect cost, completion date and customer relationship.
  • Interacted effectively with site engineering team and field staff to coordinate work that complied with design and construction documents.
  • Identified major issues that could arise and provided solutions for these problems.
  • Observed construction methods and installations, inspection and testing processes to maintain consistent progress.
  • Reviewed and interpreted plans and provided layout and support
  • Provided and maintained project control, elevation, x and y
  • Completed asbuilds in a timely manner

Concrete Foreman

Gcf Concrete
08.2021 - 01.2022
  • Set wood and other forming materials to prepare for concrete pours.
  • Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Provided and maintained project layout

Concrete Form Carpenter

Bayside Structures
01.2019 - 08.2021
  • Set wood and other forming materials to prepare for concrete pours.
  • Utilized wheelbarrows, shovels and other tools to move, spread and level concrete.
  • Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Safely operated concrete-cutting and finishing drills, power saws and trowels to complete assigned tasks.

Education

Ged -

Navarre Highschool
03.2019

Skills

  • Project management
  • Scheduling and planning
  • Quality control
  • Cost management
  • Field support
  • Quality assurance
  • People management
  • Engineering
  • Continuous improvement
  • Job material ordering
  • Blueprint reading
  • RFI documentation

Project history

Federal projects

•325th fighter wing HQ, TYNDALL AFB

• SAPR Building AFB

• Silver flags Vehicle maintenance, Technical Training Classroom, Storage facility, TYNDALL AFB

• Lodging facility Tyndall AFB

• Subscale drone facility, Tyndall AFB

• Tyndall AFB marina

• Aero Dynamic Research facility, Langley AFB

  • ADOC Corrections facaility, Deatsville AL


Timeline

Project Engineer

Martin Concrete Construction
08.2023 - Current

Concrete Foreman

Gcf Concrete
08.2021 - 01.2022

Field Engineer

BL Harbert International LLC
02.2021 - 08.2023

Concrete Form Carpenter

Bayside Structures
01.2019 - 08.2021

Ged -

Navarre Highschool
Koebi King