Highly accomplished Civil Quality Assurance and Quality Control Engineer with 20+ years, including 16 in the GCC. Proven record of delivering superior quality and compliance on high-profile construction projects for infrastructure and facilities like airfields, buildings, warehouses, PEMB, and hotels. Expertise includes implementing comprehensive quality control programs, conducting thorough testing (ASTM, AASHTO, ACI), and leading QA/QC teams to exceed quality and regulatory standards. Certifications include the U.S. Army Corps of Engineers, The Chartered Quality Institute and the American Concrete Institute.
Project: Falcon 5/F-15QA Beddown Project
Employer: United States Army Corps of Engineers
Project Cost: 524,000,000.00 US$
· Assist the Contractor Quality Control (CQC) System Manager in daily organization of Quality Control activities.
· Managing of daily Quality Assurance and Control at site.
· Managing the teams of QA/QC Inspectors and schedule of inspections.
· Managing testing and laboratory on site.
· Ensuring that quality of work is being followed.
· Inspection of works carried out by subcontractors for compliance to design, standards, project requirement, local Qatar specification (QCS2014) and company system.
· Documenting on-site inspections and testing.
· Preparing and issuing submittals towards the Client Representative / Consultant.
· Reviewing and coordinating Method Statement, Checklist, Activity Hazard Analysis (Risk Assessment).
· Preparing of Inspection and Test Plan.
· Keeping records for all works carried out.
· Raising of non-conformance and quality observations when needed.
· Supporting construction team in quality issues.
· Escalating to management any urgent quality issues.
· Auditing
· Authority to stop work.
· Providing guidance and training to construction team thru Quality Control Toolbox Talks.
· Controlling quality by Implementing and documenting the Three Phases of Control on every definable feature of work. Collaborated with clients through weekly quality meetings and site walks, fostering a transparent and proactive approach to quality management.
· Reviewing redline markup and as-built drawings prior submission to Client.
· Management of hand-over package.
Project: Falcon (1) Modification of Al-Udeid Existing Building to Accommodate Rafale (Z-304-01)
Client: State of Qatar Minister of Defense GHQ
Consultant: F.D. Consult
Project Cost: $50,000,000.00 US$
· Implemented a systematic inspection process that identified and resolved discrepancies early, mitigating potential delays and ensuring adherence to project requirement.
· Fostered strong communication with the client to align with project objectives, resulting in a streamlined approval process and enhanced client satisfaction.
· Guided and trained the QA/QC team to uphold quality standards, resulting in improved efficiency and a noticeable reduction in non-conformance reports.
· Maintained high standards for design specification adherence.
· Enforced QA/QC policies and procedures while supporting project and construction managers in maintaining client relations.
· Conducted thorough inspections to ensure compliance with all design and project specifications.
· Supported managers to strengthen client relationships.
Contractor: Saudi Bin Ladin Group
Project Cost: $4.1bn
· Ensured projects aligned with the approved setting-out plans, Project Quality plans, and Safety plans, effectively maintaining compliance with established standards.
· Monitored project progress against the Baseline Schedule, proactively identifying and addressing potential delays to keep timelines on track.
· Conducted thorough investigations of site conditions to identify obstacles and formulate solutions during project execution.
· Ensured construction activities were conducted in accordance with Issued for Construction (IFC) drawings and project specifications.
· Oversaw the testing and acceptance of materials ensuring all meet stringent quality standards through on-site and off-site tests.
· Supervised a team of Civil Inspectors, coordinating efforts between Civil, Structural, Architectural, and MEP to ensure seamless project integration.
· Conducted thorough investigations of site conditions to identify obstacles and formulate solutions during project execution.
· Gathered and analyzed data to prepare detailed reports on work progress, resource utilization, and compliance with the project schedule.
Project: Princess Nora Bint Abdulrahman University (PNU)
Project: King Abdullah University of Science and Technology (KAUST)
· Managed detailed civil and architectural finishing work estimates, ensuring precision and accuracy in budget allocation.
· Assessed progress billings against actual site accomplishments to ensure billing accuracy and financial integrity.
· Evaluated subcontractor quotations to guarantee cost-effectiveness while maintaining compliance with project standards.
· Reviewed subcontractor contract agreements and Bills of Quantities (BOQs), including applicability of General Conditions of Subcontract (GCS), to ensure alignment with project specifications.
· Liaised with vendors, engineers, architects, and the quantity surveying team to effectively address and resolve project-related issues.
· Conducted regular site visits and inspections, providing timely progress reports to the Senior Quantity Surveyor to track development and compliance with project milestones.
· Additionally, I prepared and submitted monthly invoices for completed works to Saudi Aramco, ensuring smooth financial transactions and clear documentation of executed work.
Project: Crown Regency Hotel and Towers
Developer: J King and Sons Company, Incorporated
Architect: T.I Vasquez Architects & Planners Inc (TVA&P Inc.)
Structural Engineer: G.E Origenes Consulting Engineers
Contractor: ASEC Development and Construction Corporation
· Ensuring all works were conducted according to IFC drawings and specifications, maintaining the highest standards of quality and excellence
· Overseeing and monitoring the performance of subcontractors across various disciplines, including Civil, Structural, Plumbing, and Architectural works
· Conducting regular material testing (concrete, steel, and other materials) to guarantee the quality and integrity of project materials
· Strategically organizing project staff (including admin workers) according to project work requirements, ensuring efficient resource allocation and maximum productivity
· Notable Achievement: Instrumental in the early completion of 54 suite rooms, exceeding project expectations and enhancing the overall operational efficiency of the hotel
Project: Aldea Del Sol
· Supervised on-site operations to ensure all works are executed in accordance with the approved construction drawings and specifications, maintaining strict adherence to quality and safety standards.
· Utilized strong monitoring, controlling, and decision-making skills to address challenges proactively, ensuring efficiency and cost-effectiveness.
· Conducted monthly evaluations of subcontractor progress and accomplishments, preparing Certificates of Payment to facilitate timely and accurate compensation.
Significant Contribution:
Played a pivotal role in the construction and successful completion of two (2) Model House units, which received high commendations from the Planning Department for excellence in design and execution.
Quality Standard Enfrorcement
undefinedISO 9001:2015 QMS Lead Auditor, Certificate No.: DISS/QMS/LA/240057
CQI | The Chartered Quality Institute
American Concrete Institute
Saudi Council of Engineers | الهيئة السعودية للمهندسين
Philippines Institute of Civil Engineers – PICE Qatar and Saudi Arabia Chapters
ISO 9001:2015 QMS Lead Auditor, Certificate No.: DISS/QMS/LA/240057
ACI Associate Concrete Construction Special Inspector, Certificate No.: 02079718
Construction Quality Management for Contractors, TAM-02-22-00217
ACI Concrete Field Testing Technician - Grade I, Certification No.: 02079718
Saudi Council of Engineers, Membership No.: 114465