Efficient Backhoe Operator known for high productivity and ability to complete tasks swiftly with precision. Skilled in operating a wide range of heavy machinery, maintaining equipment for optimal performance, and adhering to safety protocols. Excels in time management, problem-solving, and communication, ensuring smooth operation on construction sites.
Overview
29
29
years of professional experience
Work History
Backhoe Operator
City of Burnaby
Burnaby
01.2008 - Current
Perform required pre-trip checks on assigned machine and update mechanics on needed repairs
Work with multiple department including Water, Sewers and Roads on as-assigned basis
Work closely with lead hands in excavating around water mains, gas and hydro lines
On-call and snow removal shifts as needed
Worked on different machines JCB, John Deere, 590 case and a Cat frontend Loader
Followed safety protocols while operating the backhoe in order to minimize risk of injury.
Oversaw proper PPE use to facilitate working conditions compliant with safety regulations.
Backfilled trenches after pipe laying operations were complete using the rear-mounted blade attachment.
Promoted continuous improvement of workplace safety and environmental practices.
Removed debris from excavation sites using buckets on a backhoe arm.
Checked fuel supplies at sites to verify adequate availability.
Lifted and positioned pipes into place with a backhoe during pipeline installation projects.
Employed heavy equipment operation best practices resulting in minimal complaints or incidents.
Operated equipment to remove debris, snow or other equipment from streets and work areas.
Identified hazardous materials on job sites and took action to mitigate and enhance safety.
Performed minor service on equipment and referred complicated mechanical issues to appropriate personnel.
Operated backhoe to excavate trenches, foundations, and other structures.
Operated digging and transporting equipment to efficiently fulfill project requirements.
Performed pre-shift and post-shift equipment inspections and accurately completed reports to support company policy.
Checked hydraulic systems of the backhoe for proper functioning before starting work.
Followed worker hand signals to align machines, cutterheads or depth gauge makers with reference stakes and guidelines.
Collaborated with other crew members to complete tasks efficiently and effectively.
Adjusted handwheels and depressed pedals to control blades, buckets and scrapers.
Managed multiple tasks simultaneously while operating a backhoe in tight spaces with precision accuracy.
Operated heavy equipment to demolish current structures, remove plants or trees and clear property of debris.
Adhered to company policies regarding safe operation of machinery at all times.
Loaded and offloaded rocks, debris and other materials from heavy equipment.
Followed signals from ground crew and other operators to safely move materials and prevent dangerous interactions or missed cues.
Excavated soil around existing structures without damaging them or surrounding areas with an excavator bucket.
Loaded and moved dirt, rocks, equipment and materials.
Labourer
City of Burnaby
Burnaby
01.2003 - 01.2008
Repair leaking and/or broken water mains and water services of various sizes; locate, repair and adjust valve boxes as necessary
Install new water mains and connect new mains to existing distribution grids; perform water purification and de-chlorination as required
Follow plans to turn on and off valves in order to flush water mains
Service and repair fire hydrants
Drive service truck as required; maintain effective working relationship with public
Proper and prompt completion of all required paperwork
Participated in team meetings to discuss project progress updates.
Understood how to operate and maintain job site equipment safely and for maximum productivity.
Cut materials into specified sizes for installation using tile cutters and power saws.
Assisted with diverse construction challenges to help team and customer.
Cleaned or prepared construction sites to eliminate hazards.
Cleaned work area after job completion ensuring all debris is properly disposed of.
Mixed, poured, and spread concrete, asphalt gravel, and other materials.
Followed all safety procedures when handling hazardous materials in the laboratory setting.
Loaded and unloaded materials onto or from pallets, trucks, or other vehicles using a forklift.
Displayed high standards for quality workmanship and routinely double-checked work.
Lifted objects weighing up to 50 pounds without assistance when necessary.
Installed sewer, water or storm drain pipes using pipe-laying machinery or laser guidance equipment.
Performed physical activities requiring heavy lifting, walking and standing for long periods of time.
Dug ditches or trenches, backfilled excavations or compacted and leveled earth to grade specifications.
Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
Maintained clean, safe working environment by removing debris from job site prior to shift completion.
Ensured that all personal protective gear was worn at all times while on the job site.
Operated equipment with strong focus on safety and ground communication.
Organized tools, supplies, and equipment needed for specific jobs according to instructions provided by supervisor.
Completed variety of physical labor tasks.
Operated various power tools such as drills and saws safely while following manufacturer's instructions.
Collaborated with team members to complete assigned tasks and meet tight deadlines.
Head Irrigation Technician
Westwood Plateau Golf and Country Club/Academy
Westwood Plateau
01.1997 - 01.2003
Responsible for overseeing all irrigation practices on the 27-hole property at Westwood Plateau Golf facilities including general operation, maintenance and rebuilding/replacement of system components
Trained in creation and interpretation of as-built drawings
Diagnosed system and parts failures, located and repaired leaks
Ensured efficient and effective watering schedules were in place; performance of full blow-out process in the fall as well as start-up in the spring
Originally trained in Rain Bird Maxi-5 System; was responsible for total upgrade to Rain Bird Nimbus II System and wireless Freedom system (1999)
Created detailed plans for new installations that included the layout of sprinkler heads and piping systems.
Monitored water usage and adjusted the timer settings as necessary to conserve resources.
Maintained accurate records of all irrigation system components, including timers, pumps, backflow preventers, pressure regulators.
Operated seed drills and manure spreaders to plant, fertilize, dust and spray crops.
Sprayed fertilizer and pesticide solutions to control insects, fungus, weed growth and diseases.
Cleaned debris from clogged emitters or filters to improve water flow efficiency.
Utilized active listening and effective interpersonal skills to cultivate customer relationships that lasted years.
Installed and programmed clocks, timers and rain sensors to maintain proper irrigation levels and reduce water waste. parts.
Inspected sprinkler heads, valves, and pipes for proper functioning and identified any problems or needed repairs.
Special Projects Foreman
Westwood Plateau Golf and Country Club/Academy
Westwood Plateau
01.1996 - 01.1997
Special post-construction fairway re-leveling and seeding projects
Complete knowledge, training and experience with regards to operation of all golf course maintenance equipment
Conducted regular performance reviews with crew members.
Maintained daily logs of labor and equipment used on-site.
Ensured all workers adhered to company policies and procedures.
Scheduled staff shifts based on project needs and availability.
Monitored equipment operation during extraction process to detect problems.
Reported project progress, site problems and labor status to supervisors.
Coordinated with other departments to ensure project deadlines were met.
Viewed and checked job equipment to determine maintenance requirements.
Education
High School Diploma -
Cariboo Hill Secondary School
Burnaby, Canada
06-1991
Skills
Equipment operation
Heavy machinery operation
Site excavation
Hydraulic system checks
Safety protocols
Debris removal
PPE compliance
Team collaboration
Task prioritization
Problem solving
Attention to detail
Effective communication
Time management
Customer service
Team communication
Drainage systems installation
Site grading
Foundation preparation
Excavation techniques
Road construction
Weather adaptation
Trenching expertise
Land clearing
Demolition procedures
Heavy equipment operation
Hazardous materials handling
Team leadership
Backhoe operation
Loader operation
Air compressor use
Preventive Maintenance
Safe equipment operation
Trenching and shoring safety
Following directions
Equipment inspection
References
Available upon request
Seminars And Certificates
Hazmasters Shoring & Confined Space Course
Certified Traffic Control Person
St John’s Ambulance Emergency First Aid: Industry Level ‘A’ CPR