Experienced construction professional with a background in commercial and residential projects. Skilled in overseeing construction sites as a superintendent, site and safety health officer, and quality control inspector. Adept at coordinating daily field activities with management teams, including material procurement, schedule development, and daily reports/logs. Ensures subcontractor compliance with project safety and quality control requirements. Possesses extensive knowledge of construction protocols and standards as an adaptable Project Superintendent. [Number] years of experience supervising subcontractors, consistently delivering projects within budget and on time. Recognized as a top-notch professional known for exceptional composure.

Overview

17
17
years of professional experience
1
1
Certification

Work History

Project Manager / Construction Superintendent / Quality Control

Fredrick Quinn Corp
01.2023 - Current
  • 2023-2024: Wood Dale Public Works, Wood Dale, IL
  • Contract Value: $11,400,000
  • Scope: Constructed large pre-engineered building for vehicle storage, remodeled existing building into Public Works offices, installed mechanical systems, electrical upgrades, elevator installation, site development including storm traps, retention pond, and parking lots.

Project Superintendent

Cornerstone Contracting, Inc.
01.2016 - 01.2022
  • 2021-2022: Wyoming Air National Guard Air Command
  • Contract Value: $2,500,000
  • Scope: Constructed brick/block building with mechanical, electrical, and plumbing systems.
  • 2020-2021: Army Corps Fish Barrier, Romeoville, IL
  • Contract Value: $1,500,000
  • Scope: Construction of a pre-engineered building, mechanical, electrical, plumbing, and site development work.
  • 2019-2020: DOJ FCC, Forrest City, AR
  • Contract Value: $2,696,000
  • Scope: Replacement of generator.
  • 2019-2020: VAMC Dublin, GA
  • Contract Value: $1,394,000
  • Scope: Implement retro commissioning recommendations, general construction, alterations, mechanical, and electrical work for necessary removal of existing construction and certain other items.
  • 2019: Systemwide CCTV Camera and Communication Upgrade, Illinois Tollway
  • Contract Value: $1,223,000
  • Scope: Removal of existing wireless radio assemblies, CCTV cameras, microwave vehicle detection systems (MVDS), and associated equipment; removal of existing ITS device enclosures, poles, and foundations; installation of new CCTV cameras, MVDS, and associated equipment; installation of new ITS device enclosures, poles, and foundations; installation of new frame-mounted disconnect switches; installation of new conduit and fiber optic cable; maintenance of traffic, site restoration, and other associated work.
  • 2017-2018: EO-6 Building, M6 Maintenance Facility, Illinois Tollway
  • Contract Value: $1,223,000
  • Scope: Construction of pre-engineered building, mechanical, electrical, and plumbing work.
  • 2017: Robley Rex VA Medical Center, Louisville, KY
  • Contract Value: $859,000
  • Scope: Upgrade campus communications regarding fire alarm systems and replace existing copper wire with fiber backbone.
  • 2016-2017: VA Medical Center, Erie, PA
  • Contract Value: $2,325,000
  • Scope: General construction, alterations, roads, walks, grading, drainage, mechanical and electrical work, laboratory equipment, utility systems, water storage facilities, necessary removal of existing structures and construction of certain other items.
  • 2016-2017: DOJ FTC, Oklahoma City, OK
  • Contract Value: $4,845,000
  • Scope: Materials, labor, and equipment for replacement of absorption chillers.

Project Superintendent

Englewood Construction
01.2015 - 01.2016
  • 2015-2016: Hobby Lobby, Rochester, NH
  • Contract Value: $5,100,000
  • Scope: 54,000 Sq. Ft. new construction of Hobby Lobby hobby store as part of new shopping center; foundation work required blasting and excavation of granite subgrade.
  • 2015: Motherhood Maternity Store, Tampa Bay, FL
  • Contract Value: $310,000
  • Scope: 1,000 Sq. Ft. interior build-out at Tampa Premium Outlet Mall retail shopping center.

Project Superintendent

D.S.R. Construction
2015 - 2015

2015: Broadview Retail Center, Broadview, IL
Contract Value: $1,038,000
Scope: New construction of a 10,000 Sq. Ft. retail shopping center.

  • Conducted walk-throughs with clients prior to project close, completing punchlists and answering all questions.
  • Continuously inspected job sites for observation of safety protocols by staff and subcontractors.

Project Superintendent

F.H. Paschen S.N. Nielsen General Contractors
01.2008 - 01.2014
  • 2013: Maywood Courthouse Demolition and Clearing Project, Cook County, IL
  • Contract Value: $451,000
  • Scope: Demolition for future grounds development.
  • 2013: Chicago Area Pavement Maintenance and Improvements, Cook County, IL
  • Contract Value: $2,300,000
  • Scope: Paving rehabilitation.
  • 2012: CPS - Crane High School Renovation, Chicago, IL
  • Contract Value: $2,700,000
  • Scope: Renovation of 58 classrooms.
  • 2011: CPS - John F. Kennedy High School ADA Renovations, Chicago, IL
  • Contract Value: $5,500,000
  • Scope: ADA renovations.
  • 2010: CPS - Dumas Elementary School ADA Upgrades, Chicago, IL
  • Contract Value: $1,200,000
  • Scope: ADA renovations.
  • 2010: CPS - Haley Elementary School MCR, Chicago, IL
  • Contract Value: $3,500,000
  • Scope: Roof replacement and structural reinforcement.
  • 2009: CPS - Curtis Elementary School Boiler Replacement, Chicago, IL
  • Contract Value: $2,000,000
  • Scope: Boiler replacement.
  • 2009: CPS - Englewood Campus Renovation, Chicago, IL
  • Contract Value: $2,600,000
  • Scope: Exterior restoration and ADA upgrades.

Education

Associates Degree in Business Administration

Kendall College
Chicago, IL

Skills

  • Deadline Management
  • Permit processing
  • Project safety
  • Budgetary controls
  • Crew safety meetings
  • Cost Control
  • Blueprint Interpretation
  • Building Codes
  • Commercial construction experience
  • Site Inspections
  • Cost Estimation
  • Change order management

Certification

  • OSHA 30 Hour
  • CPR/AED
  • AGCA – Certified General Superintendent
  • NARI – Certified Carpenter
  • USACE Construction Quality Management for Contractors

Personal Information

Title: Construction Project Superintendent

Affiliations

  • Boy Scouts of America

Timeline

Project Manager / Construction Superintendent / Quality Control

Fredrick Quinn Corp
01.2023 - Current

Project Superintendent

Cornerstone Contracting, Inc.
01.2016 - 01.2022

Project Superintendent

Englewood Construction
01.2015 - 01.2016

Project Superintendent

F.H. Paschen S.N. Nielsen General Contractors
01.2008 - 01.2014

Project Superintendent

D.S.R. Construction
2015 - 2015

Associates Degree in Business Administration

Kendall College
  • OSHA 30 Hour
  • CPR/AED
  • AGCA – Certified General Superintendent
  • NARI – Certified Carpenter
  • USACE Construction Quality Management for Contractors
Kurt Schlosser