Dynamic Field Supervisor/Lease Operator with a proven track record at Wadi Exploration and Production/ D10 Energy LLC, excelling in leadership and electrical troubleshooting. Mastered project management and safety management, significantly enhancing operational efficiency and compliance. Skilled in conveying complex data to stakeholders, demonstrating exceptional communication and problem-solving abilities.
Overview
11
11
years of professional experience
1
1
Certification
Work History
Field Supervisor/Lease Operator (Maintenance)
Wadi Exploration and Production/ D10 Energy LLC
08.2014 - Current
Planning and organizing the production schedule.
Inspected the work and equipment used for the job assignment
Ensuring safety regulations are met
Organizing maintenance work orders – selecting and ordering material
Assessing project requirements
Supervising the work of staff – organized and train staff
Railroad commission documents: Production reports, H-15, W-10 and G-10
Manage and budget account
Budgeted rigs and paraffin clean up by treatment theory
Conduct fluid level shots with echo meter – worked with pipe, tubing, and fittings to plumb in tank batteries, oil wells, and gas lines
Have done some minor welding, tubing cutting and working ball valve, 90- and 45-degree elbows, poly pipe transitions and many other various plumbing equipment
Conduct time test on wells and set timer so well is pumped off
Trouble shoot well problems
Set back pressure valve to standard settings
Monitoring wells
Allocate oil wells, data entry on Microsoft Excel
Well file maintenance, schedule well treatments
Conduct power point and excel stats to CEO and investors
Repair and maintain compressor station
Operate properties to meet environmental and safety regulations
Daily reports on oil, gas, and water movement
Monitor chemical usage at wells
Work on production equipment such as pump valve, treater dump valves, gas regulators, working will high pressures on a daily basis
Repair and troubleshoot electrical panels such as: changing blown fuses, cleaning contacts, replacing transformers from 480 Volts to 240/120 volts, wiring up a panel to a 25 HP motor, setting and replacing timers, checking voltage with a multimeter, checking resistance on capacitors, replacing and wiring capacitors, and changing the main fuse on the power line with a hot stick.
Site IT Support Officer at STERLING OIL EXPLORATION & ENERGY PRODUCTION CO. LSite IT Support Officer at STERLING OIL EXPLORATION & ENERGY PRODUCTION CO. L
Deputy Director, Business Development at Sterling Oil Exploration and Energy Production Company LimitedDeputy Director, Business Development at Sterling Oil Exploration and Energy Production Company Limited