Overview
Work History
Education
Skills
Certification
Timeline
Generic

Lance Tucker

Slocomb,AL

Overview

20
20
years of professional experience
1
1
Certification

Work History

System Maintenance Technician

Charter Communications, Time Warner Cable
02.2005 - 12.2016
  • Operated varied hand and power tools to complete repairs.
  • Used problem-solving skills to alleviate issues efficiently with minimal supervision.
  • Troubleshot equipment breakdowns and performed preventive maintenance.
  • Followed work orders and specifications for equipment replacement, repair, or maintenance.
  • Followed safety protocols to minimize workplace accidents.
  • Successfully completed complex repair tasks within tight deadlines, minimizing disruptions to daily operations.
  • Minimized production delays, responding swiftly to emergency breakdowns or unexpected malfunctions.
  • Assisted management in developing long-term plans for equipment upgrades and replacements.

Field Operations Supervisor

Charter Communications, Time Warner Cable
01.2017 - 06.2019
  • Conducted regular site inspections to ensure adherence to quality standards and identify areas for improvement.
  • Managed field operations for successful project completion, ensuring timely delivery and client satisfaction.
  • Developed standard operating procedures to ensure consistent work results across all team members and improve overall operational efficiency.
  • Streamlined communication between departments, fostering collaboration and efficient problem solving.
  • Implemented safety protocols for field operations, reducing workplace accidents and maintaining compliance with industry regulations.
  • Set and managed schedules to give proper coverage to required areas and meet customer service demands.
  • Supervised a team of technicians, maintaining high-quality work standards and promoting safe practices in the field.
  • Collaborated with management to develop strategic plans for operational improvements, driving long-term success in the organization.
  • Trained technicians on safety, task prioritization and project management techniques.
  • Reduced duplicate work and budget issues by organizing processes for division between technology and purchasing.
  • Met with senior management to determine needs and develop roadmaps.
  • Inspected equipment and tools used for safe operation.
  • Sourced suppliers and purchased necessary materials for work.

Engineering Coordinator

Choctawhatchee Electric Coop.
06.2019 - 12.2021
  • Collaborated with cross-functional teams to ensure seamless integration of engineering designs into final products.
  • Participated in regular design reviews, offering constructive feedback to colleagues and incorporating suggestions to enhance overall quality.
  • Assisted in the development of project specifications, ensuring accurate representation of client requirements within engineering designs.
  • Developed detailed technical documentation to support design decisions and facilitate future modifications.
  • Optimized existing designs for improved performance, cost reduction, and enhanced functionality.
  • Maintained up-to-date knowledge of applicable codes, regulations, and industry standards, ensuring full compliance in all engineering designs.
  • Managed multiple projects simultaneously while adhering to strict deadlines and maintaining high-quality results.
  • Improved engineering designs by incorporating innovative solutions and utilizing advanced software tools.
  • Achieved greater accuracy in modeling complex systems through diligent attention to detail in calculations and drawings.
  • Assisted with installation, calibration and testing of engineering systems.
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
  • Assisted with design and implementation of new engineering processes and procedures to optimize productivity.
  • Collaborated with other departments to facilitate successful project completion.
  • Led engineering teams to successfully complete projects on time and within budget.

Project Manager Fiber Optic Design & Construction

Bigham Cable Construction
01.2022 - Current
  • Maintained schedules to meet key milestones at every project phase.
  • Directed changes to project scope and cost and implemented appropriate change management processes to keep project on track.
  • Presented regular status reports to executive leadership, providing insights into progress made toward achieving key milestones.
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Managed projects from procurement to commission.
  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Negotiated and managed third-party contracts related to project deliverables.
  • Achieved significant improvements in project quality by establishing rigorous quality control processes.
  • Completed projects within tight deadlines, coordinating team efforts and prioritizing tasks effectively.
  • Maintained compliance with industry standards and regulations, conducting regular audits and updates to project practices.
  • Optimized project schedules, identifying critical path tasks and reallocating resources to maintain momentum.
  • Reported regularly to managers on project budget, progress, and technical problems.
  • Recruited and oversaw personnel to achieve performance and quality targets.

Education

High School Diploma -

Slocomb High School
Slocomb, AL
05-2003

Skills

  • Project management
  • Budget management
  • Quality control
  • Contract negotiation
  • Technical documentation
  • Project planning and development
  • Project tracking
  • Inventory control
  • Technical support
  • Construction management
  • Forecasting
  • Systems installation, configuration, and upgrading
  • Permit processing

Certification

Training and hands on with CWDM and DWDM Fiber Optics designs and fusion splicing and troubleshooting

Timeline

Project Manager Fiber Optic Design & Construction

Bigham Cable Construction
01.2022 - Current

Engineering Coordinator

Choctawhatchee Electric Coop.
06.2019 - 12.2021

Field Operations Supervisor

Charter Communications, Time Warner Cable
01.2017 - 06.2019

System Maintenance Technician

Charter Communications, Time Warner Cable
02.2005 - 12.2016

High School Diploma -

Slocomb High School
Lance Tucker