Summary
Overview
Work History
Education
Skills
Timeline
Generic

Lannie Patterson

Jacksonville,FL

Summary

Hardworking Rod Buster with skills to tie rebar. Experience in utilizing metal mesh when preparing concrete slabs and foundations. Customized rebar to better fit and join sections of walls together through cutting, bending using proper tools needed. Very determined worker willing to do what is necessary to get the job done.


Determined Concrete Finsher focused on completing quality concrete work. Experienced in building forms, directing pours and finishing surfaces


Experience in road construction and working along busy stretches of highway during high traffic hours.


Holds multiple OSHA certifications.

Overview

5
5
years of professional experience

Work History

Concrete Finisher

Florida Roads
Jacksonville, FL
02.2022 - 05.2022
  • Created specific finishes on poured concrete.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Wore correct clothing and protective equipment for jobs.
  • Applied concrete fabrication techniques to achieve desired project specifications, quality and code standards.
  • Set wood and other forming materials to prepare for concrete pours.
  • Completed physically demanding tasks such as lifting up to 75 pounds to move job materials.
  • Shoveled materials such as dirt, gravel and asphalt.
  • Demolished and repaired old concrete surfaces.
  • Mixed, spread and patched concrete to specifications.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Adhered to safety and reporting procedures.
  • Routinely lifted and moved items weighing up to 75 pounds.

Concrete Finisher

Perma Curbs Of Jacksonville
Jacksonville, FL
07.2021 - 01.2022
  • Created specific finishes on poured concrete.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Wore correct clothing and protective equipment for jobs.
  • Set wood and other forming materials to prepare for concrete pours.
  • Shoveled materials such as dirt, gravel and asphalt.
  • Demolished and repaired old concrete surfaces.
  • Mixed, spread and patched concrete to specifications.
  • Measured precise amounts of concrete and verified levelness to improve quality of finished product.
  • Adhered to safety and reporting procedures.

Pipe Layer

Jr Davis Construction
Jacksonville, FL
11.2019 - 04.2021
  • Assembled and installed underground pipe, fittings and valves of various sizes.
  • Checked and tested underground gas lines and pipes to verify proper functionality.
  • Used hand signals to direct equipment operators and alert to hazards.
  • Handled all repairs for sanitary and storm water sewer structures and pipe systems.
  • Observed all safety measures and company equipment policies to prevent job site accidents.
  • Read and understood drawings, written instructions and blueprints to plan work and layout pipe.
  • Located existing pipes needing repair or replacement using magnetic or radio indicators.
  • Followed plans to locate existing utilities prior to digging and flagged locations for operators.
  • Checked slopes for conformance to requirements using levels or lasers.
  • Reviewed schematics and measured pipes to make accurate cuts.
  • Covered completed pipes with earth or materials and prepared sites for grading.
  • Used equipment such as rollers, dump trucks and front-end loaders to move important supplies.
  • Graded or leveled trench bases using tamping machines or hand tools.
  • Accessed existing pipes, repaired issues and put in new components for underground utility systems in new construction residental areas
  • Installed new hydrants, valves and lines to meet fire department needs and protect residents.
  • Proved successful working within tight deadlines and fast-paced atmosphere.
  • Devoted special emphasis to punctuality and worked to maintain outstanding attendance record.

Rod Buster

Archer Western Construction
Jacksonville, FL
12.2015 - 02.2019
  • Skilled in use of specialized metalworking and concrete manipulation tools to perform assigned tasks.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Determined size, shape, placement and material of supports based on blueprints and structural standards.
  • Positioned rebar and other iron reinforcement following pouring of concrete.
  • Prioritized safety across job site with specific attention to load suspension, welding and cutting.
  • Complied with OSHA and company safety guidelines for height safety, lock out tag out, confined space and hazardous material handling.
  • Reviewed work plans and blueprints to ascertain all requirements for project.
  • Cut metal components to required lengths using metal shears, hacksaws and bar cutters.
  • Examined architectural drawings and building blueprints to determine reinforcement requirements.
  • Spaced and fastened rods using wire and pliers.
  • Studied blueprints to determine accurate lengths for reinforcement bars and cut pieces.
  • Reinforced concrete slabs and pieces by placing and securing steel bars to enhance and extend life of structures.
  • Positioned and secured steel bars or mesh using fasteners or hand tools.

Education

GED -

FSCJ
Jacksonville, FL
05.2007

Skills

  • Concrete Spreading
  • Safety Instruction
  • Steel Plate Installation
  • Hand and Power Tool Operation
  • Surface Compound Application
  • Surface Leveling and Smoothing
  • Concrete, Grout and Slurry Mixing
  • Concrete Pour Facilitation
  • Form Setting and Alignment
  • Power Saws
  • Corporate Standards
  • Power Grinding
  • Compacting and Grading
  • Hole and Crack Filling
  • Concrete Casting
  • Pitch and Depth Correction
  • Waterproofing and Surface Restoration
  • Laborer Supervision
  • Expansion Joint and Edge Molding
  • Jointers and Edging Tools
  • Commercial Projects
  • Civil Engineering
  • Work Assignments
  • Floats and Spreaders
  • Standards Compliance
  • Material Needs Determination
  • Maintaining Clean Work Areas
  • Complex Problem-Solving
  • Work Planning and Prioritizing
  • Critical Thinking
  • Weather Monitoring
  • Operational Safety
  • Active Listening
  • Safe Work Practices
  • Heavy Labor
  • Reinforced Steel
  • Project Deadlines
  • Tools and Equipment
  • Rod-Bending Machines
  • Equipment Safety
  • Traffic Control
  • Metal Cutters
  • OSHA Regulations
  • Crew Safety Meetings
  • Rebar Tying
  • Concrete Finishing
  • Safety Procedures
  • Efficient Multitasking
  • Joint Sealing
  • Locating Underground Utilities
  • Accurate Measurements
  • Water and Sewer Piping
  • Heavy Machinery Operation
  • Detail Work
  • Backhoe Operation
  • Pipefitting

Timeline

Concrete Finisher

Florida Roads
02.2022 - 05.2022

Concrete Finisher

Perma Curbs Of Jacksonville
07.2021 - 01.2022

Pipe Layer

Jr Davis Construction
11.2019 - 04.2021

Rod Buster

Archer Western Construction
12.2015 - 02.2019

GED -

FSCJ
Lannie Patterson