Summary
Overview
Work History
Education
Skills
Timeline
Generic

Larry Heffner Jr

GASTONIA,NC

Summary

Accomplished electrical professional with a proven track record at Belmont Textile Machinery, enhancing troubleshooting processes and customer satisfaction. Expert in wiring installation and fostering team collaboration, I've significantly improved efficiency and project turnaround times. Skilled in circuit analysis and electrical safety, my work has led to increased positive customer feedback and streamlined operations.

Overview

18
18
years of professional experience

Work History

Tech

Belmont Textile Machinery
09.2023 - 01.2025


  • Streamlined troubleshooting processes for faster resolution of electrical issues in the facility.
  • Developed comprehensive documentation for electrical systems, ensuring consistency and easy access to information.
  • Tested wiring and other system parts for electrical flow and function.
  • Interpreted blueprints, schematics, drawings, and layouts to complete repairs.
  • Tested, troubleshot, and calibrated equipment in shop and field.

Senior Installer of Automated Machinery

CCS Card Clothing and Services
09.2020 - 09.2023
  • Delivered high-quality workmanship consistently, contributing to an increase in positive customer reviews and referrals.
  • Streamlined installation processes for increased efficiency and reduced labor costs.
  • Provided exceptional customer service through effective communication, addressing client concerns, and ensuring satisfaction with completed work.
  • Traveled all over North America for installs.
  • Service calls were troubleshooted by me over the phone or on site.

Electrical Control Panel Builder and Installer

Solvere
05.2007 - 06.2020
  • Collaborated closely with clients to understand their unique needs and customize panel designs accordingly, resulting in high levels of satisfaction with the final product.
  • Improved panel building efficiency by streamlining assembly processes and implementing time-saving techniques.
  • Reduced project completion times by effectively managing resources and prioritizing tasks for optimal workflow.
  • Streamlined communication channels within the team, fostering improved collaboration between departments for smoother project execution.

Education

No Degree - Electrical Studies

Gaston College
Dallas, NC
09-1998

Skills

  • Wiring installation
  • Circuit analysis
  • Electrical troubleshooting
  • Motor controls
  • Conduit bending
  • Electrical safety

Timeline

Tech

Belmont Textile Machinery
09.2023 - 01.2025

Senior Installer of Automated Machinery

CCS Card Clothing and Services
09.2020 - 09.2023

Electrical Control Panel Builder and Installer

Solvere
05.2007 - 06.2020

No Degree - Electrical Studies

Gaston College
Larry Heffner Jr