Hardworking Lineman with a background inspecting poles and lines for damage and experienced in troubleshooting techniques. Organized employee with a strong work ethic and a terrific job attendance record. Highly communicative and offering great problem solving skills.
Overview
38
38
years of professional experience
Work History
Cable Spicer/Jounreyman Lineman
San Diego Gas & Electric Co
San Diego
05.2005 - 07.2013
Installed and maintained overhead and underground power lines. 4KV to 35KV
Conducted routine inspections of electrical systems for safety compliance.
Responded to service calls for outages and repairs in various locations.
Operated specialized tools and equipment for line installation and maintenance.
Collaborated with team members to ensure efficient project completion.
Adhered to safety protocols while working in high-risk environments.
Trained junior linemen on best practices and safety procedures.
Assisted in the development of emergency response plans for outages.
Followed OSHA regulations related to safety procedures at job sites.
Maintained, repaired and replaced poles and cross-arms.
Operated bucket trucks to install or maintain high voltage power lines.
Assisted in the repair of damaged lines due to storms or accidents.
Performed pole climbing, digging holes and backfilling trenches for line installation.
Removed old wires from utility poles before replacing them with new ones.
Assisted in the maintenance of underground cables and conduits.
Participated in emergency response teams during natural disasters.
Assisted in various capacities during construction, repair and maintenance of electrical lines.
Read blueprints and diagrams for proper installation techniques.
Cleaned up work sites after completing projects.
Connected new customers by running service drops from existing main line wires to customer premises.
Installed transformers, meters, regulators and other electrical components.
Assessed power lines, poles and electrical equipment for wear and damage and reported deficiencies to appropriate supervisor.
Inspected equipment for faults or damage to determine repair needs.
Constructed distribution systems using hand tools such as shovels, hammers, saws and drills.
Provided technical assistance to apprentices while they learned the trade.
Shortened or lengthened wires by removing or adding wire and used different types of splices, connectors and clamps. All terminations and slices from 600v to 35KV
Shortened or lengthened wires by removing or adding wire and used different types of splices, connectors and clamps.
Climbed poles to compare printed data on transformers with work orders and examine wires and auxiliary equipment on poles.
Opened switches or attached grounding devices to remove electrical hazards from disturbed or fallen lines.
Conducted safety inspections of all power line equipment prior to use.
Troubleshot overhead distribution lines to restore power service.
Compared layout and methods of installation to blueprints and sketches and marked differentiations on drawings.
Tested conductors to identify corresponding conductors and prevent incorrect connections.
Worked closely with electricians on complex construction projects.
Tested and inspected electric distribution equipment and wiring outside and within buildings to verify conformance of installation with construction and building code specifications.
Measured distances between posts when installing wire support structures.
Replaced defective or burned out conductors on utility poles using aerial lift devices.
Documented work performed, including repairs made and materials used, for record-keeping purposes. to include 4KV to 35KV
Coordinated with other utilities to ensure safe working conditions and prevent service disruption.
Adhered to local, state, and federal regulations governing electrical transmission and distribution.
Utilized volt meters, ammeters, and other testing devices to assess and ensure system functionality.
Installed and maintained overhead and underground power lines to ensure uninterrupted power supply. both OH and URD
Communicated effectively with customers, addressing concerns and explaining the nature of work.
Performed ground work, setting up traffic cones and safety signs to secure work areas.
Spliced wires and soldered connections to complete circuitry for effective power distribution. to include splices tbodies elbows elbow arrestors fault indicators. 4kv to 35kv
Read and interpreted work orders, diagrams, and specifications to determine repair or installation requirements.
Installed street lights and security lights, including wiring and fixture mounting.
Participated in safety meetings and workshops to stay updated on industry practices and standards.
Worked with team to install cables, poles and transformers.
Maintained electric work tools and equipment.
Climbed wooden poles, ladders and towers or used bucket trucks to reach power lines and complete work.
Performed pre-installation procedures to attach cross-arms, insulators and auxiliary equipment to poles.
Completed resagging on older or improperly installed lines.
Assigned tasks to employees and monitored productivity, performance and task completion.
Superintendent/Journeyman Lineman/Cable Splicer
Powerplus Electric
Pensacola
03.2002 - 08.2004
Supervised daily operations on construction sites to ensure project compliance. Military bases in Az, Ft Campbell Ky, Dover, De, Paris Island, SC, Ft Hood,Tx, Polk Airbase,La, Honolulu Ha, Fl
4KV to 35KV
Coordinated subcontractors and vendors to maintain project timelines and quality standards.
Implemented safety protocols to promote a safe work environment for all personnel.
Led site meetings to discuss progress, challenges, and upcoming tasks with teams.
Monitored material deliveries and inventory for efficient resource management.
Reviewed blueprints and specifications to ensure adherence to project requirements.
Trained new staff on site procedures, safety measures, and equipment usage.
Reviewed blueprints and drawings to ensure accuracy of plans prior to commencement of construction activities.
Conducted regular meetings with foremen to review job status updates and discuss any problems or challenges encountered in the field.
Prepared cost estimates for labor, materials, and equipment required for projects.
Inspected worksites regularly to identify potential issues or risks associated with construction activities.
Oversaw material delivery schedules and ensured that adequate supplies were available on site.
Directed personnel in proper installation techniques for a variety of materials used in construction projects.
Resolved conflicts between contractors regarding scope of work or other matters concerning contracts.
Enforced adherence to local building codes as well as OSHA safety regulations throughout the duration of the project.
Inspected buildings to determine quality of work and need for corrections to meet project standards.
Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
Prepared and planned worksites to help jobs run smoothly.
Kept production team moving forward for progress in daily site operations.
Recruited and hired workers, in addition to supervising and monitoring daily performance.
Obtained specifications and directed work for construction crews.
Maintained, repaired and replaced poles and cross-arms.
Operated bucket trucks to install or maintain high voltage power lines.
Assisted in the repair of damaged lines due to storms or accidents.
Performed pole climbing, digging holes and backfilling trenches for line installation.
Removed old wires from utility poles before replacing them with new ones.
Assisted in the maintenance of underground cables and conduits.
Assisted in various capacities during construction, repair and maintenance of electrical lines.
Read blueprints and diagrams for proper installation techniques.
Cleaned up work sites after completing projects.
Assessed power lines, poles and electrical equipment for wear and damage and reported deficiencies to appropriate supervisor.
Inspected equipment for faults or damage to determine repair needs.
Constructed distribution systems using hand tools such as shovels, hammers, saws and drills.
Shortened or lengthened wires by removing or adding wire and used different types of splices, connectors and clamps.
Climbed poles to compare printed data on transformers with work orders and examine wires and auxiliary equipment on poles. 4KV to 35KV
Opened switches or attached grounding devices to remove electrical hazards from disturbed or fallen lines.
Climbed poles to compare printed data on transformers with work orders and examine wires and auxiliary equipment on poles.
Conducted safety inspections of all power line equipment prior to use.
Compared layout and methods of installation to blueprints and sketches and marked differentiations on drawings.
Troubleshot overhead distribution lines to restore power service.
Tested conductors to identify corresponding conductors and prevent incorrect connections.
Measured distances between posts when installing wire support structures.
Participated in safety meetings and workshops to stay updated on industry practices and standards.
Trained and mentored apprentice linemen, sharing knowledge and reinforcing safety practices.
Performed ground work, setting up traffic cones and safety signs to secure work areas.
Installed and maintained overhead and underground power lines to ensure uninterrupted power supply.
Spliced wires and soldered connections to complete circuitry for effective power distribution.
Adhered to local, state, and federal regulations governing electrical transmission and distribution.
Worked with team to install cables, poles and transformers.
Climbed wooden poles, ladders and towers or used bucket trucks to reach power lines and complete work.
Assigned tasks to employees and monitored productivity, performance and task completion.
Operated splicing tools and equipment for precise cable connections.
Conducted routine inspections to maintain cable integrity and performance.
Documented splicing processes and maintained accurate records for future reference.
Followed safety protocols to ensure a secure working environment during installations.
Assisted in training new staff on splicing techniques and best practices.
Conducted routine maintenance on underground and aerial cabling systems.
Recommended improvements in procedures based on field experience.
Collaborated with team members to troubleshoot cable issues effectively.
Adhered to established safety protocols while performing cable splicing tasks.
Climbed poles and ladders to install, maintain or inspect equipment
Supervisor/Journey Lineman/Cable Splicer
Burns and Roe
Atlanta
02.2001 - 02.2002
Supervisor for high voltage and underground utilities.
Supervised crew of 60 workers
Installed 4 kV to 35 kV in Guantanamo, Cuba
Used a bucket truck and a helicopter to install overhead power lines.
Supervised daily operations to ensure efficient workflow and productivity
Fostered a collaborative work environment through effective team communication.
Complied with company policies, objectives and communication goals.
Managed team of XX employees, ensuring high productivity and quality standards were met.
Utilized document management system to organize company files, keeping up-to-date and easily accessible data.
Lead Lineman/ Safety Advisor
Great Southwestern Construction Inc.
Atlanta
02.2000 - 03.2001
OH/URD 4KV/35KV installation and maintenance
Trained apprentices in proper safety procedures while working on high voltage lines.
Installed and maintained overhead and underground electrical distribution systems.
Performed preventive maintenance on power line equipment such as transformers, switchgear, circuit breakers, and other related equipment.
Assisted in the construction of new power lines by stringing wires, installing poles, and connecting cables to structures.
Identified defective sectionalizing devices, circuit breakers, fuses, voltage regulators, transformers, switches, relays or wiring using wiring diagrams and electrical-testing instruments.
Cable Splicer
Opened switches and attached grounding devices to remove electrical hazards from disturbed or fallen lines or to facilitate repairs.
Inspected and tested power lines and auxiliary equipment to locate and identify problems using reading and testing instruments.
Climbed wooden poles, ladders and towers or used bucket trucks to reach power lines and complete work.
Worked with team to install cables, poles and transformers.
Handled repair work for overhead and underground electrical power lines.
Performed pre-installation procedures to attach cross-arms, insulators and auxiliary equipment to poles.
Prepared installations by analyzing staking sheets and job sites, gathering required materials and supplies and locating existing cables and other utilities.
Maintained adequate supply of approved safety and PPE supplies for work force.
Journeyman Lineman/Cable Splicer
Gulf Power Company
Pensacola
06.1975 - 05.2000
Installation and maintenance of electrical distribution to include network systems, underground distribution systems, submarine and lead cable, poly, paper, and E/P/R rubber, all overhead and service-related installation and maintenance. 4 kV to 35 kV. Some 500 kV.
Worked as a Lineman Development Instructor.
CPR and First Aid Instructor.
Involved in new materials and methods of underground systems.
Trained linemen and apprentices in the above areas.
Certified Transmission and Distribution Switchman
Developed and implemented the Training and Specifications Manual used by Gul Power