Summary
Overview
Work History
Education
Skills
Timeline
Generic

Larry Smith

Pensacola

Summary

Hardworking Lineman with a background inspecting poles and lines for damage and experienced in troubleshooting techniques. Organized employee with a strong work ethic and a terrific job attendance record. Highly communicative and offering great problem solving skills.

Overview

38
38
years of professional experience

Work History

Cable Spicer/Jounreyman Lineman

San Diego Gas & Electric Co
San Diego
05.2005 - 07.2013
  • Installed and maintained overhead and underground power lines. 4KV to 35KV
  • Conducted routine inspections of electrical systems for safety compliance.
  • Responded to service calls for outages and repairs in various locations.
  • Operated specialized tools and equipment for line installation and maintenance.
  • Collaborated with team members to ensure efficient project completion.
  • Adhered to safety protocols while working in high-risk environments.
  • Trained junior linemen on best practices and safety procedures.
  • Assisted in the development of emergency response plans for outages.
  • Followed OSHA regulations related to safety procedures at job sites.
  • Maintained, repaired and replaced poles and cross-arms.
  • Operated bucket trucks to install or maintain high voltage power lines.
  • Assisted in the repair of damaged lines due to storms or accidents.
  • Performed pole climbing, digging holes and backfilling trenches for line installation.
  • Removed old wires from utility poles before replacing them with new ones.
  • Assisted in the maintenance of underground cables and conduits.
  • Participated in emergency response teams during natural disasters.
  • Assisted in various capacities during construction, repair and maintenance of electrical lines.
  • Read blueprints and diagrams for proper installation techniques.
  • Cleaned up work sites after completing projects.
  • Connected new customers by running service drops from existing main line wires to customer premises.
  • Installed transformers, meters, regulators and other electrical components.
  • Assessed power lines, poles and electrical equipment for wear and damage and reported deficiencies to appropriate supervisor.
  • Inspected equipment for faults or damage to determine repair needs.
  • Constructed distribution systems using hand tools such as shovels, hammers, saws and drills.
  • Provided technical assistance to apprentices while they learned the trade.
  • Shortened or lengthened wires by removing or adding wire and used different types of splices, connectors and clamps. All terminations and slices from 600v to 35KV
  • Shortened or lengthened wires by removing or adding wire and used different types of splices, connectors and clamps.
  • Climbed poles to compare printed data on transformers with work orders and examine wires and auxiliary equipment on poles.
  • Opened switches or attached grounding devices to remove electrical hazards from disturbed or fallen lines.
  • Conducted safety inspections of all power line equipment prior to use.
  • Troubleshot overhead distribution lines to restore power service.
  • Compared layout and methods of installation to blueprints and sketches and marked differentiations on drawings.
  • Tested conductors to identify corresponding conductors and prevent incorrect connections.
  • Worked closely with electricians on complex construction projects.
  • Tested and inspected electric distribution equipment and wiring outside and within buildings to verify conformance of installation with construction and building code specifications.
  • Measured distances between posts when installing wire support structures.
  • Replaced defective or burned out conductors on utility poles using aerial lift devices.
  • Documented work performed, including repairs made and materials used, for record-keeping purposes. to include 4KV to 35KV
  • Coordinated with other utilities to ensure safe working conditions and prevent service disruption.
  • Adhered to local, state, and federal regulations governing electrical transmission and distribution.
  • Utilized volt meters, ammeters, and other testing devices to assess and ensure system functionality.
  • Installed and maintained overhead and underground power lines to ensure uninterrupted power supply. both OH and URD
  • Communicated effectively with customers, addressing concerns and explaining the nature of work.
  • Performed ground work, setting up traffic cones and safety signs to secure work areas.
  • Spliced wires and soldered connections to complete circuitry for effective power distribution. to include splices tbodies elbows elbow arrestors fault indicators. 4kv to 35kv
  • Read and interpreted work orders, diagrams, and specifications to determine repair or installation requirements.
  • Installed street lights and security lights, including wiring and fixture mounting.
  • Participated in safety meetings and workshops to stay updated on industry practices and standards.
  • Worked with team to install cables, poles and transformers.
  • Maintained electric work tools and equipment.
  • Climbed wooden poles, ladders and towers or used bucket trucks to reach power lines and complete work.
  • Performed pre-installation procedures to attach cross-arms, insulators and auxiliary equipment to poles.
  • Completed resagging on older or improperly installed lines.
  • Assigned tasks to employees and monitored productivity, performance and task completion.

Superintendent/Journeyman Lineman/Cable Splicer

Powerplus Electric
Pensacola
03.2002 - 08.2004
  • Supervised daily operations on construction sites to ensure project compliance. Military bases in Az, Ft Campbell Ky, Dover, De, Paris Island, SC, Ft Hood,Tx, Polk Airbase,La, Honolulu Ha, Fl
  • 4KV to 35KV
  • Coordinated subcontractors and vendors to maintain project timelines and quality standards.
  • Implemented safety protocols to promote a safe work environment for all personnel.
  • Led site meetings to discuss progress, challenges, and upcoming tasks with teams.
  • Monitored material deliveries and inventory for efficient resource management.
  • Reviewed blueprints and specifications to ensure adherence to project requirements.
  • Trained new staff on site procedures, safety measures, and equipment usage.
  • Reviewed blueprints and drawings to ensure accuracy of plans prior to commencement of construction activities.
  • Conducted regular meetings with foremen to review job status updates and discuss any problems or challenges encountered in the field.
  • Prepared cost estimates for labor, materials, and equipment required for projects.
  • Inspected worksites regularly to identify potential issues or risks associated with construction activities.
  • Oversaw material delivery schedules and ensured that adequate supplies were available on site.
  • Directed personnel in proper installation techniques for a variety of materials used in construction projects.
  • Resolved conflicts between contractors regarding scope of work or other matters concerning contracts.
  • Enforced adherence to local building codes as well as OSHA safety regulations throughout the duration of the project.
  • Inspected buildings to determine quality of work and need for corrections to meet project standards.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Prepared and planned worksites to help jobs run smoothly.
  • Kept production team moving forward for progress in daily site operations.
  • Recruited and hired workers, in addition to supervising and monitoring daily performance.
  • Obtained specifications and directed work for construction crews.
  • Maintained, repaired and replaced poles and cross-arms.
  • Operated bucket trucks to install or maintain high voltage power lines.
  • Assisted in the repair of damaged lines due to storms or accidents.
  • Performed pole climbing, digging holes and backfilling trenches for line installation.
  • Removed old wires from utility poles before replacing them with new ones.
  • Assisted in the maintenance of underground cables and conduits.
  • Assisted in various capacities during construction, repair and maintenance of electrical lines.
  • Read blueprints and diagrams for proper installation techniques.
  • Cleaned up work sites after completing projects.
  • Assessed power lines, poles and electrical equipment for wear and damage and reported deficiencies to appropriate supervisor.
  • Inspected equipment for faults or damage to determine repair needs.
  • Constructed distribution systems using hand tools such as shovels, hammers, saws and drills.
  • Shortened or lengthened wires by removing or adding wire and used different types of splices, connectors and clamps.
  • Climbed poles to compare printed data on transformers with work orders and examine wires and auxiliary equipment on poles. 4KV to 35KV
  • Opened switches or attached grounding devices to remove electrical hazards from disturbed or fallen lines.
  • Climbed poles to compare printed data on transformers with work orders and examine wires and auxiliary equipment on poles.
  • Conducted safety inspections of all power line equipment prior to use.
  • Compared layout and methods of installation to blueprints and sketches and marked differentiations on drawings.
  • Troubleshot overhead distribution lines to restore power service.
  • Tested conductors to identify corresponding conductors and prevent incorrect connections.
  • Measured distances between posts when installing wire support structures.
  • Participated in safety meetings and workshops to stay updated on industry practices and standards.
  • Trained and mentored apprentice linemen, sharing knowledge and reinforcing safety practices.
  • Performed ground work, setting up traffic cones and safety signs to secure work areas.
  • Installed and maintained overhead and underground power lines to ensure uninterrupted power supply.
  • Spliced wires and soldered connections to complete circuitry for effective power distribution.
  • Adhered to local, state, and federal regulations governing electrical transmission and distribution.
  • Worked with team to install cables, poles and transformers.
  • Climbed wooden poles, ladders and towers or used bucket trucks to reach power lines and complete work.
  • Assigned tasks to employees and monitored productivity, performance and task completion.
  • Operated splicing tools and equipment for precise cable connections.
  • Conducted routine inspections to maintain cable integrity and performance.
  • Documented splicing processes and maintained accurate records for future reference.
  • Followed safety protocols to ensure a secure working environment during installations.
  • Assisted in training new staff on splicing techniques and best practices.
  • Conducted routine maintenance on underground and aerial cabling systems.
  • Recommended improvements in procedures based on field experience.
  • Collaborated with team members to troubleshoot cable issues effectively.
  • Adhered to established safety protocols while performing cable splicing tasks.
  • Climbed poles and ladders to install, maintain or inspect equipment

Supervisor/Journey Lineman/Cable Splicer

Burns and Roe
Atlanta
02.2001 - 02.2002
  • Supervisor for high voltage and underground utilities.
  • Supervised crew of 60 workers
  • Installed 4 kV to 35 kV in Guantanamo, Cuba
  • Used a bucket truck and a helicopter to install overhead power lines.
  • Supervised daily operations to ensure efficient workflow and productivity
  • Fostered a collaborative work environment through effective team communication.
  • Complied with company policies, objectives and communication goals.
  • Managed team of XX employees, ensuring high productivity and quality standards were met.
  • Utilized document management system to organize company files, keeping up-to-date and easily accessible data.

Lead Lineman/ Safety Advisor

Great Southwestern Construction Inc.
Atlanta
02.2000 - 03.2001
  • OH/URD 4KV/35KV installation and maintenance
  • Trained apprentices in proper safety procedures while working on high voltage lines.
  • Installed and maintained overhead and underground electrical distribution systems.
  • Performed preventive maintenance on power line equipment such as transformers, switchgear, circuit breakers, and other related equipment.
  • Assisted in the construction of new power lines by stringing wires, installing poles, and connecting cables to structures.
  • Identified defective sectionalizing devices, circuit breakers, fuses, voltage regulators, transformers, switches, relays or wiring using wiring diagrams and electrical-testing instruments.
  • Cable Splicer
  • Opened switches and attached grounding devices to remove electrical hazards from disturbed or fallen lines or to facilitate repairs.
  • Inspected and tested power lines and auxiliary equipment to locate and identify problems using reading and testing instruments.
  • Climbed wooden poles, ladders and towers or used bucket trucks to reach power lines and complete work.
  • Worked with team to install cables, poles and transformers.
  • Handled repair work for overhead and underground electrical power lines.
  • Performed pre-installation procedures to attach cross-arms, insulators and auxiliary equipment to poles.
  • Prepared installations by analyzing staking sheets and job sites, gathering required materials and supplies and locating existing cables and other utilities.
  • Maintained adequate supply of approved safety and PPE supplies for work force.

Journeyman Lineman/Cable Splicer

Gulf Power Company
Pensacola
06.1975 - 05.2000
  • Installation and maintenance of electrical distribution to include network systems, underground distribution systems, submarine and lead cable, poly, paper, and E/P/R rubber, all overhead and service-related installation and maintenance. 4 kV to 35 kV. Some 500 kV.
  • Worked as a Lineman Development Instructor.
  • CPR and First Aid Instructor.
  • Involved in new materials and methods of underground systems.
  • Trained linemen and apprentices in the above areas.
  • Certified Transmission and Distribution Switchman
  • Developed and implemented the Training and Specifications Manual used by Gul Power
  • Installed T Bodies, Elbow arrestors, Switch Gear Transformers, Sectional Switch Gear.

Education

Associate of Science - Line Construction And Developement OH/URD

Pensacola Junior Cllege
Pensacola, FL
01-1971

Skills

  • Cable installation
  • Power line maintenance
  • Safety compliance
  • Electrical troubleshooting
  • Team collaboration
  • Emergency response
  • OSHA certification
  • Confined spaces certification
  • Safety observer for safety observation for Gulf Power Company
  • CPR/First Aid Instructor for Gulf Power Company
  • Certified trainer by Gulf Power Company training
  • Line development instructor
  • Underground line and cable theory instructor, cable fault location expert
  • High voltage and low voltage high pot tester using Vaughn Thumper
  • High voltage cable fault locating and repair
  • Secondary fault location and repair, Dinatel cable locators
  • Trace and spot cable
  • Graduate of ARU University in Chicago, IL
  • Expert with the Associated Research Unit
  • Tree trimming and chainsaw safety
  • Transformer theory and connection
  • Oil circuit reclosure theory and connection
  • Dot coning and safety
  • Firefighting safety
  • Grounding safety, theory, and application
  • Troubleshooting: Theory and application
  • Pole top and bucket truck response
  • Pole climbing and safe bucket truck operation
  • New materials and methods, both OH and underground, practical use analyst

Timeline

Cable Spicer/Jounreyman Lineman

San Diego Gas & Electric Co
05.2005 - 07.2013

Superintendent/Journeyman Lineman/Cable Splicer

Powerplus Electric
03.2002 - 08.2004

Supervisor/Journey Lineman/Cable Splicer

Burns and Roe
02.2001 - 02.2002

Lead Lineman/ Safety Advisor

Great Southwestern Construction Inc.
02.2000 - 03.2001

Journeyman Lineman/Cable Splicer

Gulf Power Company
06.1975 - 05.2000

Associate of Science - Line Construction And Developement OH/URD

Pensacola Junior Cllege
Larry Smith