Insert the upper bracket into the tube. Torque the upper bracket and mark it. Tie the bearings and torque them. Install the lower bracket bolts and nuts, then torque them.Install the actuator and torque it.
Verify that all torque steps are completed. Confirm all marked torque points are clearly visible. Check that all components are level and properly aligned. Ensure the assembly is fully finished and not
Check the torque on the MIPS straps, ensuring both sides have equal tension, are level, and properly positioned.
Leave the materials BHA, Berryns, lower bracket, and actuary with the pilots. Separate the ears for now, then return later to install the ears on the pilots using bolts and nuts
Use all the materials torque tube, MIP shocks, and Berryns and prepare them to be sent and installed.
Leveled the pile using a laser to prepare it for installation. Ears were then attached using bolts and nuts, followed by the installation of the BHA.
All materials, including the torque tube, MIPs, shocks, and bearings, were assembled and positioned. Additional materials were prepared and staged near the work tables to facilitate continued operations.
Ears were installed onto the pile using bolts and nuts. Following installation, hacking and booming operations were carried out as part of the BHA system setup.
A laser level was used to ensure the piles were correctly leveled. The central pile served as a reference point to determine the elevation required for setting the cap heights.
Initially placed all components including the pilot assembly, bearings, lower bracket, and actuator in position. The ears were then removed for separate handling. Upon return, the ears were installed into the pilot assembly using bolts and nuts to secure them.