Overview
Work History
Education
Timeline
Generic

Laura E Mendoza

Calexico,CA

Overview

11
11
years of professional experience

Work History

Worker

Granite Construction
10.2024 - 03.2025

Insert the upper bracket into the tube. Torque the upper bracket and mark it. Tie the bearings and torque them. Install the lower bracket bolts and nuts, then torque them.Install the actuator and torque it.

Verify that all torque steps are completed. Confirm all marked torque points are clearly visible. Check that all components are level and properly aligned. Ensure the assembly is fully finished and not

Worker

Solv Energy
10.2023 - 02.2024

Check the torque on the MIPS straps, ensuring both sides have equal tension, are level, and properly positioned.

Worker

Swinerton
05.2021 - 02.2022

Leave the materials BHA, Berryns, lower bracket, and actuary with the pilots. Separate the ears for now, then return later to install the ears on the pilots using bolts and nuts

Worker

Arraycon
05.2020 - 03.2021

Use all the materials torque tube, MIP shocks, and Berryns and prepare them to be sent and installed.

Worker

Conti Corporation
05.2019 - 03.2020

Leveled the pile using a laser to prepare it for installation. Ears were then attached using bolts and nuts, followed by the installation of the BHA.

Worker

Arraycon
06.2018 - 04.2019

All materials, including the torque tube, MIPs, shocks, and bearings, were assembled and positioned. Additional materials were prepared and staged near the work tables to facilitate continued operations.

Worker

Mortenson Construction
04.2018 - 06.2018

Ears were installed onto the pile using bolts and nuts. Following installation, hacking and booming operations were carried out as part of the BHA system setup.

Worker

D& R Electric
07.2015 - 05.2016

A laser level was used to ensure the piles were correctly leveled. The central pile served as a reference point to determine the elevation required for setting the cap heights.

Worker

D&R Electric
11.2013 - 08.2014

Initially placed all components including the pilot assembly, bearings, lower bracket, and actuator in position. The ears were then removed for separate handling. Upon return, the ears were installed into the pilot assembly using bolts and nuts to secure them.

Education

Calexico High School
Calexico, CA
06.2021

Timeline

Worker

Granite Construction
10.2024 - 03.2025

Worker

Solv Energy
10.2023 - 02.2024

Worker

Swinerton
05.2021 - 02.2022

Worker

Arraycon
05.2020 - 03.2021

Worker

Conti Corporation
05.2019 - 03.2020

Worker

Arraycon
06.2018 - 04.2019

Worker

Mortenson Construction
04.2018 - 06.2018

Worker

D& R Electric
07.2015 - 05.2016

Worker

D&R Electric
11.2013 - 08.2014

Calexico High School
Laura E Mendoza