
Experienced MEP Superintendent with a strong track record in project management, quality assurance, and safety protocols. Proven ability to oversee complex installations and optimize workflows for enhanced efficiency.
Experienced with managing large-scale construction projects, ensuring quality and adherence to timelines. Uses effective communication to coordinate between various stakeholders and optimize project outcomes. Track record of implementing safety protocols and fostering collaborative team environment.
Overseeing the fabrication and install of Off Site Manufacturing Chill Water and Heat Recovery Production Plants For Semi Conductor Fabs in Rio Rancho, NM and Boise, ID.
Duties included:
Verification of site specs and local codes were met.
Pressure Testing, and Passivation of these hydronic systems.
Start up and Commissioning of these Plants.
Supervising the full mechanical install related to Data Center Build.
Coordinating daily activities with all trades to assure successful build.
Tracking progress, schedule and budget.
Scope of Work and JHA reviews for Mechanical Sub Contractors.
Implementing Safety Protocols and Procedures to insure IIF workplace.
Supervising the Base Build of two Semi Conductor Fabs, one in Chandler, AZ and one in Rio Rancho, NM.
4/11 - 2/13 Chandler, AZ
Field Supt Civil Underground Plumbing rough in for the entire site.
Field Supt for the Boiler, Chiller Plant.
Supporting material take off and pre purchase of long lead.
Estimating and processing sub contracts and change orders.
Coordinating the Commissioning and Startup of equipment with vendors,subcontractors and system owners.
8/08 - 4/11 Rio Rancho, NM
Supervised the process pipe, waste and I&C Base Build Install
Coordinate and track schedules with all trades and system owners.
Required strong ability to comprehend Process, Elect and I&C design.
Estimating and processed change orders and warranties.
Early Days,
Started Pipefitter Apprenticeship in 1979 and earned Journeyman status in 1983.
Spent 13 years in Los Alamos, NM (LANL) 1981- 1993 working in the Utilities Dept.
Duties included Installing, monitoring and maintaining ground water wells.
Maintaining Potable drinking water systems and operating Activated Sludge Waste Water treatment plants.
Maintaining Natural Gas along with Steam and Condensate systems.
1983- 2008 Worked on the semi conductor facility in Rio Rancho, NM
Worked under several contractors over the years as a Pipefitter, Foreman, General Foremen and Superintendent.
Duties include install of High Purity Gas and Water systems along with Process Waste, Collection and Treatment.