Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Leonardo Leon

Lynnwood,WA

Summary

Experienced tile installation and design professional leveraging industry trends to create unique installations and increase homeowner equity. Demonstrates a superior command of job-specific tools and equipment.

Overview

20
20
years of professional experience

Work History

Lead Tile Installer

T & S Remodeling
Lynwood Center, WA
12.2020 - Current
  • Measured, cut, and installed ceramic, porcelain, stone, and marble tile in residential and commercial settings.
  • Prepared surfaces for tiling by removing existing flooring material or other obstructions.
  • Installed backer boards as required prior to tiling on floors and walls.
  • Grouted joints between tiles to fill gaps and create a waterproof seal.
  • Inspected work areas to identify any potential problems with substrate conditions or layout issues.
  • Assisted customers in selecting appropriate materials for their tiling project needs.
  • Provided technical advice regarding installation techniques as needed.
  • Followed industry standards for proper installation methods.
  • Collaborated with contractors, subcontractors, architects, designers., throughout entire process from start to finish.
  • Cleaned and leveled surface areas and removed excess grout.
  • Created decorative wall and floor designs using mosaic tile setups.
  • Ordered flooring supplies and tiling equipment according to project requirements.
  • Completed post-installation inspections and processed work invoices.
  • Produced high-quality work with power and hand tools and accurate calculations of distances and surface areas.
  • Reviewed blueprints and work instructions to determine and execute requirements.
  • Prepared cost and labor quotes based on estimated time and materials needed.
  • Achieved professional finishes with expert polishing.
  • Identified materials and amount of labor required for project completion after reviewing blueprints.
  • Handled many installations each month smoothly.

Lead Remodler

Meniz contracting
Ballard, WA
02.2016 - 11.2020
  • Planned and coordinated remodeling projects, including scheduling subcontractors and ordering materials.
  • Performed demolition work to remove existing structures in preparation for new construction.
  • Installed drywall, trim, doors, windows, cabinets and countertops.
  • Repaired plumbing fixtures such as sinks, toilets and showers.
  • Assembled and installed cabinetry according to manufacturer instructions.
  • Installed flooring material such as tile, hardwood or laminate floors.
  • Applied paint or wallpaper to walls or ceilings for a finished look.
  • Installed insulation in walls or ceilings using various materials such as fiberglass batting or foam board insulation.
  • Constructed decks from composite lumber or pressure-treated wood.
  • Built custom shelving units utilizing power tools such as saws, drills and sanders.
  • Replaced damaged roofing shingles with new ones according to local building codes.
  • Removed old siding from exterior walls and replaced it with vinyl siding.
  • Grouted ceramic tiles on bathroom walls and floors for a professional finish.
  • Set up scaffolding around homes during renovations for worker safety.
  • Maintained a clean job site by sweeping away debris at the end of each day's work.
  • Operated heavy equipment such as backhoes, bulldozers and forklifts when needed.
  • Measured rooms accurately before starting any construction project.
  • Worked with homeowners to design kitchen layouts that fit their needs.
  • Worked with clients to find appropriate material sources according to client budgets and specific project needs.
  • Maintained customer satisfaction by finishing projects with skill and adding professional details for best-in-class work.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Managed projects in progress simultaneously by frequently checking supply inventories and work orders.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Displayed high standards for quality workmanship and routinely double-checked work.

Lead Coordinator III

Panasonic Avionics
Bothell, WA
02.2012 - 06.2016
  • Led projects, ensuring tasks met schedules.
  • Developed effective methods for timely project execution.
  • Formulated solutions for identified project-related issues
  • Aligned with supervisory teams to reach objectives.
  • Delegated work to staff, setting priorities and goals.
  • Developed work schedules for administrative staff

Lead Remodeler

Hoffmen Renovations
Edison, NJ
03.2005 - 10.2012
  • Managed project timelines and resource allocation for efficient completion
  • Installed drywall, trim, doors, windows, cabinets and countertops.
  • Repaired plumbing fixtures such as sinks, toilets and showers.
  • Assembled and installed cabinetry according to manufacturer instructions.
  • Installed flooring material such as tile, hardwood or laminate floors.
  • Executed painting tasks ensuring smooth, professional outcomes
  • Crafted durable decks with selected building materials
  • Replaced damaged roofing shingles with new ones according to local building codes.
  • Removed old siding from exterior walls and replaced it with vinyl siding.
  • Managed operations of diverse heavy machinery when required
  • Coordinated concurrent projects through consistent review of supply levels and job orders.
  • Collaborated with various construction employees to complete projects on time.
  • Maintained superior quality workmanship

Education

Some College (No Degree) - Architectural Drafting Technology

Universidad Privada DE Piura
Piura Peru

Some College (No Degree) - Business Administration

Instituto IPAE
Piura, Peru

Skills

  • Proficient in Waterproofing Solutions
  • Effective Client Interaction
  • Surface Conditioning Proficiency
  • Floor Surface Preparation
  • Worksite Coordination
  • Comprehensive Project Budgeting
  • Skilled in Mosaic Design Implementation
  • Layout planning
  • Commercial and residential projects
  • Proactive Self-Starter

Languages

English
Professional
Spanish
Professional

Timeline

Lead Tile Installer

T & S Remodeling
12.2020 - Current

Lead Remodler

Meniz contracting
02.2016 - 11.2020

Lead Coordinator III

Panasonic Avionics
02.2012 - 06.2016

Lead Remodeler

Hoffmen Renovations
03.2005 - 10.2012

Some College (No Degree) - Architectural Drafting Technology

Universidad Privada DE Piura

Some College (No Degree) - Business Administration

Instituto IPAE
Leonardo Leon