Detail-oriented Lineman with expertise in bucket truck operation, storm damage repair, and live-line work. Achieved efficient service restoration through strong blueprint reading, OSHA 10 compliance, and electrical safety knowledge. Focused on team collaboration and adaptability in high-stakes environments.
Work History
Live Line Barehand Lineman
2 Months
Rok Power | 09.2026 - Current
Climbed poles and operated bucket trucks while following strict safety procedures.
Set poles, stringed wire, and secured hardware for utility line projects.
Assisted with installation and maintenance of overhead and underground power lines.
Supported troubleshooting of electrical outages and line equipment issues.
Worked on both dead and energized lines.
Trained new team members in proper procedures, fostering a safe and efficient work environment.
Participated in ongoing training programs to stay current on industry trends and best practices.
Live Line Bearhand Lineman
1 Year 1 Month
North Houston Pole Line | 08.2025 - 09.2026
Repaired damaged utility poles and replaced worn line equipment with precision.
Installed overhead pole line components, including conductors, hardware, and crossarms.
Operated bucket trucks, digger derricks, and hand tools to complete field assignments.
Pulled and secured wire runs while maintaining proper tension and alignment.
Assisted crew members with material staging, pole setting, and jobsite preparation.
Removed old poles and hardware and replaced with new equipment.
Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
Followed all safety protocols and regulations while working at height and with live electricity.
Improved workplace safety by conducting regular equipment inspections and maintenance.
Maintained a strong safety record by diligently adhering to OSHA regulations and company policies. Ensured the well-being of both team members and the public.
Lineman
4 Months
Frontline | 04.2025 - 08.2025
Installed and maintained overhead and underground power lines, ensuring safe, reliable service.
Climb poles and used bucket trucks to repair conductors, transformers, and related hardware.
Strung, spliced, and tensioned wire during line construction and system upgrades.
Inspected poles, crossarms, and insulators to identify damage and prevent outages.
Lineman
9 Months
Bright Star | 07.2024 - 04.2025
Set poles, anchors, and underground equipment while following utility specifications and safety standards.
Interpreted blueprints, maps, and work orders to complete line installation accurately.
Traced electrical faults and restored service following storm-related and routine repairs.
Supported crew operations by handling tools, rigging materials, and maintaining clean work zones.
Lineman
1 Year 10 Months
North Houston Pole Line | 08.2022 - 06.2024
Assisted in emergency storm restoration efforts, restoring power to affected communities as quickly as possible.
Responded to emergencies and outages that required additional labor and assistance for repairs.
Assisted in emergency storm restoration efforts, restoring power to affected communities.
Performed maintenance and reconducting work in varied weather conditions.
Lineman
2 Years
PAR | 01.2020 - 01.2022
Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
Assisted with constructing new power lines by using appropriate tools and equipment.
Inspected power lines for any damage or irregularities and replaced components.
Proved successful working within tight deadlines and a fast-paced environment.
Lineman
2 Years
INTREN LLC | 01.2018 - 01.2020
Utilized advanced diagnostic tools to identify issues in power lines, ensuring timely repairs and minimal downtime.
Enforced adherence to industry best practices, safety protocols and proper installation techniques.
Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
Contributed to positive teamwork dynamics by effectively communicating with colleagues and supervisors throughout project lifecycles.
Lineman
5 Years
Wilbros T & D | 01.2009 - 01.2014
Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
Completed complex installations for major power distribution projects, ensuring adherence to industry standards.
Collaborated with cross-functional teams to complete large-scale projects on time and within budget.
Effectively managed multiple projects simultaneously, prioritizing tasks based on urgency and impact on overall operations.
App.Lineman
2 Years
Pike | 01.2007 - 01.2009
Collaborated with physicians, nurses, and care teams to coordinate treatment decisions.
Ordered and interpreted diagnostic tests to support timely clinical decision-making.
Documented encounters accurately in electronic health records using compliant clinical terminology.
Performed comprehensive patient assessments and developed evidence-based care plans.
Operator
6 Years
MCG Construction | 09.2001 - 09.2007
Operated heavy equipment safely for excavation, grading, and material handling across active construction sites.
Positioned equipment accurately to support trenching, backfilling, lifting, and precise material placement.
Inspected machinery daily, identifying mechanical issues early and coordinating timely maintenance support.
Followed site safety procedures, traffic control requirements, and job hazard standards to maintain compliant operations.
Underground Distribution
1 Year 3 Months
Standard Utility | 06.2000 - 09.2001
Optimized power distribution by maintaining transformers, circuit breakers, switchgear, and other electrical components.
Streamlined inventory management for efficient oxygen supply distribution.
Streamlined team communication for increased efficiency in content creation and distribution.
Prepared medications for distribution within the healthcare facility while adhering to strict quality control measures.