Dynamic leader with a proven track record of safe operation in the field of high voltage construction. Skilled in oversight of complex projects, and fostering strong team relationships, I excel in driving projects to completion while ensuring health and safety standards.
Worked directly with the USDA/FSIS inspectors for wholesale manufacturing of beef jerky.
Oversaw all aspects of manufacturing operations, including production planning, scheduling, and resource allocation • Implemented lean manufacturing principles to optimize efficiency and reduce waste throughout the production process • Led a team of 2 supervisors and 15 frontline employees in achieving production targets and maintaining high-quality standards • Developed and implemented strategic initiatives to improve operational performance, resulting in an 35% increase in productivity • Managed the procurement of raw materials and equipment necessary for production, ensuring timely delivery while minimizing costs • Collaborated with cross-functional teams to develop and implement new product introductions, ensuring seamless integration into existing manufacturing processes
Worked as a superintendent over multiple crews of 50 or more employees to install and maintain electrical infrastructure. I was responsible for scheduling clearances, holds and repairing faults to repair underground lines. I fostered solid relationships with field construction coordinators and municipality inspectors.
I worked for Driver Pipeline as a Superintendent directing multiple crews to install new construction high voltage equipment as well as existing natural gas service line replacements. General responsibility included job planning, crew placement, and general project oversight. In depth communication with Oncor and Atmos Field Construction Coordinators was a critical component.
I started at JC Evans as a field foreman and finished as a Superintendent. My duties and responsibilities included directing crews to install high-voltage underground electrical systems. I was responsible for multiple crews, job planning, and crew placement. I was responsible for directly communicating with Oncor Field Construction Coordinators to ensure work done was to standard and all safety guidelines were followed.
Roseann Schaub
rschaub419@gmail.com
(940)389-0224
Art Trevino
arttrevino15@yahoo.com
(214)228-3215
Roger Coston
racoston@gmail.com
(817)235-7561
Scott Johnston
scottjohnston0515@yahoo.com
(817)291-7783