Summary
Overview
Work History
Education
Skills
Accomplishments
Project Work For M-Tech
Software
Personal Profile
Timeline
Generic

LIGIN CHACKO VARGHESE

Electrical Engineer
DOHA,QATAR

Summary

Experienced Electrical Engineer with over 7 years of experience in Qatar airways with excellent reputation for resolving problems and improving customer satisfaction and contribute to team success through hard work, attention to detail and excellent organizational skills.

Overview

6
6
years of post-secondary education
8
8
years of professional experience

Work History

FM Engineer

QATAR AIRWAYS
Doha, Qatar
06.2014 - Current

QATAR AIRWAYS
CS-Facilities Management- Commercial
Doha, Qatar


CURRENT ROLE ACHIEVEMENTS
OPERATIONAL
 Quality control of FM operation, managing complete facilities relates areas, which include MEP and cleaning service contractors, planning, and execution of facilities related project works at Qatar airways Oryx International School.
 Periodic performance of Thermographic inspection and PAT Testing works on electrical system at Qatar Airways Commercial building, sales Offices and QDC building to ensure electrical systems for safe and reliable operation by submitting the report with action plan and implementing preventative and corrective maintenance.
 Periodic inspection of assigned facilities to determine condition ,preparation of building inspection reports ,diagnose problems and initiates necessary actions to optimize the life span and operational reliability and ensure that the facilities are properly maintained in accordance with the best engineering practices.
 Contingency planning for responding emergency situation such as power failures, AC failures, activation of fire alarm or any other facilities related major issues
 Communication with relevant shareholders to ensure about the project and contractual works are completed within the set QR timelines and standards
 Plan, preparation of scope of work, administrates the work of contracted staff on all facilities related projects, including assigning work, reviewing and evaluating the work progress.
 Review request for service, determining whether the problem can be resolved through in-house resources, set priorities/timeline, communicate the timelines to customer and execution of job.
 Plan for workforce and material needs for designated maintenance and repair jobs to ensure adequate materials and equipment’s are available to carry out scheduled /unscheduled maintenance task.
 Develop and maintain a preventative maintenance program as per OEM recommendation for all MEP equipment’s, oversees and participate in the preventative maintenance activity .Maintain data/records relates to PPM and performance monitoring.
 Planning, Implementation and Up-gradation of critical equipment’s like UPS power network, modification works and facility amendments to support the 24/7 centralized operational unit and executing the power shutdown works for the project without affecting the business operations including testing and completion of works.
 Managing and execution of projects like MV panel modification works like ACB replacement, capacitor bank installation and other electrical installation without affecting business operations and completion of works.
 Preparation of Building manual, conducting Electrical inspections at various Qatar airways commercial buildings and submitting reports with action plan

MANAGEMENT & LEADERSHIP
 Establish the team objectives and priorities to align with and support business objectives
 Regularly evaluating the team objectives, plan, procedures and practices and make appropriate changes if needed.
 Oversee and supervise the employees, daily activities, recruit sub-contractor staff, train, develop to ensure for a high standard of service delivery.
 Take responsibility for own going projects; assist in the response to any emergency or major operational disruption affecting Qatar airways or its subsidiaries.
 Ensure compliance to all relevant safety, security, quality and environmental management policies, procedures and control across operation to assure employee safety, security, legislative compliance and delivery of high quality services with a responsible environmental attitude.
 Take a direct and personal interest in reported injured injuries, incidents, near misses and hazards to ensure that appropriate reporting, investigation and response is being achieved.

Electrical Engineer

ELECTRO LINKS Pvt Ltd. ENGINEERS & CONTRACTORS, KERALA –INDIA
Kerala, India
06.2010 - 06.2011
  • Panel board Erecting and Cable Termination.
  • Generator Erecting and Earthing.
  • Cable laying and Termination.
  • Supervise activities such as preventive maintenance of equipment’s and improvement works on electrical system as per requirement.
  • General maintenance of Commercial buildings.
  • Preparation of repair log documents and schematic diagram for electrical installations.

Education

Master of Science - Power Electronics and Drives

The Oxford College of Engineering
Bangalore
06.2011 - 09.2013

Bachelor of Engineering - Electrical and Electronics Engineering

Amal Jyothi College of Engineering
Kerala,India
11.2006 - 11.2010

Skills

    Multitasking abilities

undefined

Accomplishments

1. Presented and published Technical paper in National Conference on METHODS ENRICHING POWER AND ENERGY DEVELOPMENTS Organized by Jeppeiar College of Engineering, Chennai , India on 12 April 203

2. Presented and published Technical paper in National Conference on RECENT INNOVATIONS IN SCIENCE AND TECHNOLOGY Organized by College of Engineering Kidangoor, Kerala, India during 26 & 27 of April 2013.

3. Participated in national level Workshop on APPLICATION OF MATLAB/SIMULINK TO POWER ELECTRONICS AND DRIVES organized by the Department of Electrical and Electronics Engineering under ISTE Chapter.

Project Work For M-Tech

DESIGN OF MICROCONTROLLER BASED SLIP POWER RECOVERY CONTROL OF SLIP-RING INDUCTION MOTOR
ABSTRACT:
The project deals with design of microcontroller based slip power recovery control of slip ring induction motor. The steady state performance analysis of conventional slip power recovery scheme using static line commutated inverter in the rotor circuit is done. Simulation of the scheme is carried out using Mat lab/Simulink environment and experimental set-up is prepared in the laboratory for a 2-hp wound rotor induction motor. The microcontroller used to implement speed and current controllers and generate firing pulses for the line-commutated inverter.

Software

Mat Lab Simulink

AutoCad 2010 Level-01

AutoCad Electrical 2010 Level-01

Ms Office

Basic Knowledge in C,C

Personal Profile

Date of Birth- 23-12-1988

Gender -Male

Marital Status -Married

Nationality-Indian

# Reference are available on request

Timeline

FM Engineer

QATAR AIRWAYS
06.2014 - Current

Master of Science - Power Electronics and Drives

The Oxford College of Engineering
06.2011 - 09.2013

Electrical Engineer

ELECTRO LINKS Pvt Ltd. ENGINEERS & CONTRACTORS, KERALA –INDIA
06.2010 - 06.2011

Bachelor of Engineering - Electrical and Electronics Engineering

Amal Jyothi College of Engineering
11.2006 - 11.2010
LIGIN CHACKO VARGHESEElectrical Engineer