Effectively partnered on multimillion-dollar projects, leveraging advanced tools like Nikon and Sokkia systems to deliver precise, high-quality results. Showcased strong technical expertise and meticulous attention to detail. Dedicated to upholding the company’s commitment to excellence in surveying for construction clients. Eager to apply my skills and foster professional growth as a Lead Surveyor.
Overview
11
11
years of professional experience
1
1
Certification
Work History
Pipefitter
Belcan
01.2021 - 12.2021
Read isos and grab materials that were necessary for daily completion goals.
Utilize math to do takeoffs, grind and bevel pipe, prep for welders.
Use JLG and scissor lifts to reach elevated areas of the jobsite, always adopting 100% tie off rule when above 4 ft.
Calculate and verify calculations, elevations, provide layouts for supports, and pipe modifications.
Assistance with promoting a safety culture, participated in daily morning toolbox meetings to discuss issues and daily goals/objectives.
Project Surveyor
Austin Industrial
01.2020 - 12.2021
Consisted in establishing control for a Thermal Oxidizer Project.
Provide layouts for excavations, overseeing the entire construction process, from excavation to setting of equipment.
Use Total Station and survey equipment to provide coordinates, elevations required for construction, create sketches, as builts.
Calculate and verify calculations, elevations, provide layouts for the civil department.
Assistance with promoting a safety culture, ensure everyone has all the PPE required to do the job right and most importantly safely.
Party Chief
Worley
05.2025 - Current
Assist in construction of Train 4 / phase II
Provide as builts of every single piece of equipment, along with attached nozzle report and isos to ensure location and elevations.
Calculate angles, coordinates, slope per ft percentages for paving, trenches, pipe racks,
pumps and miscellaneous mechanical equipment.
• Worked closely with the engineers on the project to detect any potential clashes during the construction
process.
• Produced a number of as-builts on almost a daily basis.
Party Chief
Performance Contractors
10.2023 - 03.2025
1. Provide centerlines and off sets for structural steel being erected for LNG modules, modules are erected and built for offsite LNG facilities.
2. Shoot grade on embed plates to ensure a level working surface for structural steel columns being erected.
3. Plumb steel columns during the construction entire erection process and afterwards to ensure columns are within tolerance.
4. As-built all pipe tie in on modules to ensure no connectivity issues at the job site.
5. On call for all craft support, electrical, mechanical, millwrights, iron department.
Party Chief
Worley
01.2021 - 10.2023
Assist in construction of Ethylene Unit /Tank Farm/Roads
Provide as builts of every single piece of equipment, along with attached nozzle report and isos to ensure location and elevations.
Calculate angles, coordinates, slope per ft percentages for paving, trenches, pipe racks, sumps, berms, pumps etc.
Worked closely with the engineers on the project to detect any potential clashes during the construction process.
Produced a number of as-builts on almost a daily basis.
Project Surveyor
Blanchard Industrial, LLC
01.2021 - 12.2022
Party Chief for a survey crew, assisted in construction for a Desalter Unit, set elevations, benchmarks, working centerlines, offsets, etc.
Instruct and assist civil, pipe, iron, millwrights, QC, Electrical, in construction methods and procedures.
Use Total Station and Optical level to collect and provide data, assisted in identifying engineering bust and possible clashes.
Calculate and verify calculations, and create field sketches whenever necessary.
Maintain records of the project as job progresses, quantities, as builts, other information that was vital to turnover packages for the client.
Project Surveyor
Blanchard Industrial, LLC
01.2019 - 12.2020
Party Chief for a survey crew, assisted in establishing control for a Pump Station, set elevations, benchmarks, working centerlines, offsets, etc.
Instruct and train survey crew in surveying and construction methods, use of equipment, and field safety procedures.
Use Total Station and survey equipment to collect and validate data, process that data, and create reports, as builts.
Calculate and verify calculations, and create field sketches.
Maintain records of the project as job progresses, quantities, as builts, other information that was vital to the completion of the project.
Instrument Man
Jacobs/ Worley
01.2017 - 12.2019
Operated and maintained survey instruments.
Utilize measuring devices to assist the Party Chief in completing different types of survey work assignments.
Performed established procedures under limited supervision.
Operated survey equipment (Total Station and Conventional Instrumentation)
Basic field calculations and procedures to calculating angles and distances for points to be set.
Worked closely with the party chief and the engineers on the project to detect any potential clashes during the construction process.
Oversaw equipment by making sure it was safely loaded, unloaded, and stored each working day.
Produced a number of as-builts on almost a daily basis.
Instrument Man
KBR
01.2015 - 12.2017
Provided various crafts with ongoing support on a daily basis, regarding coordinates, elevations, as-builts, general questions regarding information on the construction drawings.
Oversaw equipment by making sure it was safely loaded, unloaded, and stored each working day.
Prepared supplies needed for a survey job.
Made copies of field notes and reports.
Kept survey vehicles clean and organized and in proper working order.
Performed other duties as assigned by the Party Chief.
Education
Diploma - undefined
Springwoods Senior High School
Houston, TX
01.2001
Languages
English - Expert
Spanish - Fluent
Timeline
Party Chief
Worley
05.2025 - Current
Party Chief
Performance Contractors
10.2023 - 03.2025
Pipefitter
Belcan
01.2021 - 12.2021
Party Chief
Worley
01.2021 - 10.2023
Project Surveyor
Blanchard Industrial, LLC
01.2021 - 12.2022
Project Surveyor
Austin Industrial
01.2020 - 12.2021
Project Surveyor
Blanchard Industrial, LLC
01.2019 - 12.2020
Instrument Man
Jacobs/ Worley
01.2017 - 12.2019
Instrument Man
KBR
01.2015 - 12.2017
Diploma - undefined
Springwoods Senior High School
Skills
Expertise working with a wide range of construction materials and equipment; familiarity with building processes, from project initiation through completion
Successful in completing difficult projects on schedule with consistency throughout the project to ensure quality and safety
Offer support for all crafts on the project
Proficient in establishing project control
Solid communication skills and possess trade-related math skills