Summary
Overview
Work History
Skills
References
Timeline
Generic

Luis Cintron

New York,New York

Summary

Skilled Construction Worker with a robust background of over 30 years of experience in a variety of projects, from home renovations to commercial construction, notably with Temporary Walls INC. Excelled in framing, flooring installation, and demonstrating exceptional problem-solving abilities. Known for outstanding attention to detail and team collaboration, significantly enhancing project efficiency and safety standards.

Overview

38
38
years of professional experience

Work History

Construction Worker

Monte Bo Low
11.2016 - 03.2024
  • Commercial work
  • Finish molding
  • Wood, vinyl, & aluminum sidings
  • Installed and maintained ceiling tiles.
  • Doors & windows installation
  • Skilled in both sheet rock and hardware floor installations.
  • Prepared walls and other surfaces for painting by scraping, sanding, and cleaning.
  • Achieved high-quality finishes on various surfaces.

Construction Worker

Commercial Construction Ltd
03.2018 - 06.2020
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Ensured a hazard-free work area by disposing of site debris.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Managed heavy machinery proficiently to maintain workflow and adhere to project timelines.
  • Enhanced efficiency by streamlining usage of materials across project phases.
  • Contributed to a positive work culture by fostering teamwork among staff through open communication channels, which led to higher overall productivity levels during projects.

Construction Worker

Rybak
11.2016 - 01.2018
  • Promoted a clean worksite environment by consistently collecting trash, excess materials, and discarded equipment during all phases of construction.
  • Contributed to project success by installing rebar and wire mesh reinforcement materials for added strength in concrete structures.
  • Supported project completion by setting up and dismantling concrete forms, framework, and scaffolding.
  • Enhanced project efficiency by assisting in the preparation of construction sites, including cleaning and removing debris.
  • Expedited job progress with efficient transportation of materials such as gravel or sand to designated areas within the worksite using wheelbarrows or other vehicles when needed.
  • Demonstrated adaptability with successful completion of diverse tasks including foundation work, wall construction, slab creation, retaining walls installations.
  • Optimized project outcomes by effectively communicating with supervisors and team members regarding progress updates and any challenges encountered during construction.
  • Ensured high-quality results by performing necessary repairs to concrete surfaces, including patching cracks or filling voids.

Construction Worker

Forthill
01.2013 - 09.2016
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.
  • Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Conducted safety audits to ensure compliance with federal and state regulations, reducing workplace accidents.
  • Led safety workshops for crew, fostering culture of safety and reducing incidents on site.
  • Coordinated with subcontractors to ensure quality standards, achieving high levels of client satisfaction.
  • Concrete construction

Sign Installer

Lucidity Awards & Signage Corporations
10.2010 - 05.2012
  • Evaluated job sites before beginning work, identifying potential hazards or obstructions that could impact the installation process.
  • Effectively managed multiple concurrent assignments while maintaining a high level of attention to detail and adherence to quality standards.
  • Sign installations
  • Conducted thorough pre-installation assessments to determine optimal placement strategies for maximum visibility of signs without compromising safety or aesthetics.
  • Participated in ongoing professional development opportunities to stay current on trends within the sign industry.
  • Performed regular site visits to inspect completed installations, ensuring compliance with client specifications and industry standards.
  • Streamlined communication between teams, ensuring seamless coordination during the design, fabrication, and installation phases.

Construction Worker

Temporary Walls INC
09.2009 - 02.2010
  • Framing with metal & wood
  • Sheet rock & hardwood floors installation
  • Operated power equipment to move materials and promote job efficiency.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.

Construction Worker

A Galina Heating
08.2006 - 07.2009
  • Concrete work
  • Assisted in building of new condominiums
  • Framing with metal & wood
  • Sheet rock & hardwood floor installation
  • Doors & windows installation
  • Commercial work
  • Drop ceilings
  • Finish molding
  • Operated heavy machinery efficiently, ensuring timely progress on construction projects while minimizing risk of accidents or damage.
  • Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.

Construction Worker

E Staff Control/USS
04.2006 - 07.2006


  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Demonstrated adaptability by quickly learning new techniques and equipment when required, increasing overall productivity on job sites.
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Loaded and removed debris from sites to keep areas clean and avoid safety concerns.
  • Increased overall efficiency by effectively utilizing various hand tools, power tools, and heavy machinery for each task.
  • Set up ladders, scaffolding, fences and temporary structures to prepare sites and protect public.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Demolition of office buildings

Construction Worker

Ibk Construction Group
12.2005 - 03.2006


  • Foundation
  • Performed general housekeeping and cleaning tasks.
  • Demonstrated flexibility with shifting responsibilities based on project needs, contributing to overall productivity levels.
  • Maintained high-quality workmanship through attention to detail and adherence to industry standards.
  • Supported construction projects by assisting with heavy equipment operations and manual labor tasks.
  • Pouring of concrete
  • Assisted with installation of steel and anchor bolts to reinforce concrete.
  • Installed rebar and molded expansion joints and edges for concrete projects.

Construction Worker

Janco Contractors INC
12.2005 - 03.2006
  • Painting and staining
  • Assisted in home renovations
  • Assisted in building of new homes
  • Framing with metal & wood
  • Sheet rock & hardware floor installation
  • Doors & windows installation
  • Drop ceilings
  • Wood, vinyl, & aluminum sidings
  • Commercial work
  • Finish molding
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.

Construction Worker

CAF Construction Cooperation
07.1994 - 09.2005
  • Commercial work
  • Finish molding
  • Wood, vinyl, & aluminum sidings
  • Drop ceilings
  • Doors & windows installation
  • Sheet rock & hardware floors installation
  • Framing with metal & wood
  • Assisted in home renovations
  • Assisted in building of new homes

Construction Worker

A S J Construction Corporation
01.1986 - 08.1994
  • Commercial work
  • Finish molding
  • Wood, vinyl, & aluminum sidings
  • Drop ceilings
  • Doors & windows installation
  • Sheet rock & hardware floors installation
  • Framing with metal & wood
  • Assisted in home renovations
  • Assisted in building of new homes

Skills

  • Problem-solving
  • Heavy lifting
  • Construction
  • Attention to detail
  • Power tool operation
  • Team collaboration
  • Worksite safety
  • Painting and finishing
  • Equipment operation
  • Basic carpentry
  • Truck loading
  • Team-oriented and dependable
  • Framing
  • Flooring installation
  • Concrete finishing
  • Materials loading
  • Traffic control
  • Formwork construction
  • OSHA regulations
  • Drywall installation
  • Window installation
  • Construction safety
  • Landscaping
  • Concrete pouring techniques
  • Construction site project life-cycle

References

  • Lucidity awards & signage group 212-289-4300
  • Temporary walls INC/ Tim McManus 973-432-4324
  • Galina heating - 347-248-7291
  • Frank Costello- 845-627-1700
  • Janco contractors INC/ Jeffrey Orgen 914-906-1803

Timeline

Construction Worker

Commercial Construction Ltd
03.2018 - 06.2020

Construction Worker

Monte Bo Low
11.2016 - 03.2024

Construction Worker

Rybak
11.2016 - 01.2018

Construction Worker

Forthill
01.2013 - 09.2016

Sign Installer

Lucidity Awards & Signage Corporations
10.2010 - 05.2012

Construction Worker

Temporary Walls INC
09.2009 - 02.2010

Construction Worker

A Galina Heating
08.2006 - 07.2009

Construction Worker

E Staff Control/USS
04.2006 - 07.2006

Construction Worker

Ibk Construction Group
12.2005 - 03.2006

Construction Worker

Janco Contractors INC
12.2005 - 03.2006

Construction Worker

CAF Construction Cooperation
07.1994 - 09.2005

Construction Worker

A S J Construction Corporation
01.1986 - 08.1994
Luis Cintron