Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

LUIS Feliciano Ramos

Deltona,FL

Summary

Hardworking Maintenance Technician bringing 4+ years of experience performing diverse maintenance and repair duties. Dedicated to maintaining optimal equipment functionality by managing routine and complex equipment and facility matters. Strong knowledge of hand and power tool operation and safety measures. Possessing necessary basic knowledge of primary systems including HVAC, plumbing and electrical. Offers 4 years of experience in maintenance industry and solid commitment to safety. Communicative and easygoing professional skilled in performing minor fixes.

Overview

4
4
years of professional experience
1
1
Certification

Work History

Maintenance Technician

First Communities
12.2022 - 08.2023
  • Operated varied hand and power tools to complete repairs.
  • Troubleshot equipment breakdowns and performed preventive maintenance.
  • Used problem-solving skills to alleviate issues efficiently with minimal supervision.
  • Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.

Maintenance Technician

Tig Management LLC
12.2019 - 12.2022
  • Used problem-solving skills to alleviate issues efficiently with minimal supervision.
  • Troubleshot equipment breakdowns and performed preventive maintenance.
  • Followed work orders and specifications for machine and equipment replacement, repair or maintenance.
  • Quickly responded to internal service calls regarding malfunctioning equipment and completed repairs.
  • Completed daily, weekly and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Installed new locks, door handles and door closers.
  • Worked frequently with mechanical and plumbing systems to complete knowledgeable inspections and skilled repairs.

Handyman

Cardec Handyman & Paint
07.2013 - Current
  • Completed tear-down of existing structures and prepared for new construction
  • Applied caulk, sealants and other agents to installed surfaces
  • Accurately estimated time and materials costs for projects
  • Dug trenches, back filled holes and compacted earth to prepare for new construction
  • Provided accurate measurements and estimates for all projects
  • Mixed porridge of catch basins and poured and sawed off concrete and asphalt
  • Requisitioned new supplies and equipment
  • Consistently assumed additional responsibilities and worked extended hours to meet project deadlines
  • Monitored inventory and reported items to be restocked for each job
  • Cleared drains and drainage and cleaned gutters
  • Prepared and cleaned construction sites by removing debris
  • Loaded and unloaded building materials used for construction
  • Kept interior and exterior of buildings clean, safe and welcoming
  • Performed repair work on Sprayer and power tools equipment, typically returning machines and tools to service within 30 minute

Independent Contractor Assistant

Hector Silva
07.2011 - Current
  • Determined materials needed for daily shift and loaded vehicles with equipment and supplies
  • Interacted daily with various company leaders, subcontractors, customers and city inspectors to complete construction projects
  • Managed on-site property inspections and worked to resolve issues
  • Developed project site schedule to share with site manager
  • Delivered high level of service to all customers and effectively resolved issues
  • Performed minor wall repair to maintain walls, including installing drywall and repairing and applying wallpaper
  • Studied system requirements to order components and parts and perform acceptance tests
  • Scrubbed and cleaned bathroom fixtures and partitions on 20 minute basis to remove mildew, dirt and mold

Replacing AC Pipe Insulation

Caribbean Insolation
04.2006 - 01.2007
  • Insulate Air Conditioners industrial lines to Keep Cool Air In, Hot Air Out
  • Maintained fueled and fully operational equipment to jump on any project requirement and keep teams on tight schedules
  • Communicated with ground team members and fellow operators to prevent safety hazards and keep materials moving
  • Moved equipment between job locations using truck and trailer
  • Reviewed supply levels and aging inventory to forecast purchasing needs for week
  • Drove process, efficiency and quality improvements, resulting in 15% increase in patient discharge times

Education

Associate degree - criminal justice

ICPR Junior College
Mayagüez
2011

Skills

  • HVAC Systems
  • Power and Hand Tool Use
  • Problem-Solving Ability
  • Apartment Painting
  • Scheduled Maintenance
  • Facility Upkeep
  • Drywall Painting
  • Facility Inspections

Certification

  • EPA Certification ( For Stationary HVACR Systems and Equipment )

Languages

Bilingual English (Spanish)

Timeline

Maintenance Technician

First Communities
12.2022 - 08.2023

Maintenance Technician

Tig Management LLC
12.2019 - 12.2022

Handyman

Cardec Handyman & Paint
07.2013 - Current

Independent Contractor Assistant

Hector Silva
07.2011 - Current

Replacing AC Pipe Insulation

Caribbean Insolation
04.2006 - 01.2007

Associate degree - criminal justice

ICPR Junior College
LUIS Feliciano Ramos