Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Luis Zaragoza

Oakley,CA

Summary

Dynamic Carpenter Foreman at Green Hammer Design with expertise in blueprint reading and team leadership. Successfully managed all stages of residential construction projects, ensuring high-quality craftsmanship and exceptional customer service. Demonstrated proficiency in installing diverse building structures while motivating and supervising teams to achieve project goals efficiently.

Overview

12
12
years of professional experience

Work History

Carpenter Supervisor/General Construction

Green Hammer Design
06.2013 - Current
  • Read and interpreted blue prints
  • Framing
  • built concrete forms.
  • Executed rough-in plumbing projects for new and renovated homes.
  • Installed wiring, outlets and ceiling lights independently.
  • Performed installation of windows and doors with precision.
  • Completed finish carpentry work.
  • Installed and finished drywall surfaces.
  • Installed siding on residential properties.
  • Executed installations of diverse roof types, including torch down and shingles.
  • Baseboard, cabinets
  • Build small decks
  • Installed high-grade insulation materials to enhance energy efficiency.
  • Installed fire sprinkler pipes and fittings in residential buildings.
  • Interior door installation pocket doors trim casing
  • Some experience setting tile
  • Performed mig welding tasks.
  • Managed all stages of building new homes.
  • Collaborated with other skilled tradespeople to ensure seamless integration of carpentry work within larger construction projects.
  • Delivered exceptional customer service by addressing client concerns promptly and professionally while keeping them informed of project progress.
  • Operated heavy machinery for excavation work.
  • Built and hung custom doors and frames.
  • Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
  • Cut and shaped materials to meet outlined measurements.
  • Executed professional gutter installation projects to ensure optimal drainage performance.
  • Installed insulation, trim and other finishing touches.
  • Measured, cut and installed drywall, paneling and other materials.
  • Repaired damaged doors, windows and other structures.
  • Demonstrated versatility in carpentry techniques, working proficiently with both hand tools and power tools to achieve desired results.
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Executed professional gutter installation projects to ensure optimal drainage performance.
  • Completed several painting assignments.
  • Skilled at managing heavy equipment like mini skid steer loader.
  • Foundation and floors
  • Concrete and formwork
  • Interior finish
  • Exterior finish
  • Modified HVAC ductwork to optimize air distribution.
  • Executed roof framing tasks

Education

High School Diploma - N/A

Justo Sierra
N/A
07.1994

Skills

  • Hand and power tools
  • Job site maintenance
  • Safety processes and procedures
  • Blueprint reading
  • General carpentry
  • Carpentry projects
  • Decision-making
  • Team leadership
  • Employee motivation
  • Attention to detail
  • Worker supervision
  • Following instructions
  • Dependable and hardworking
  • Stress tolerance
  • Hand and power tool operation
  • Residential construction
  • Physical strength and stamina

Languages

Spanish
English

Timeline

Carpenter Supervisor/General Construction

Green Hammer Design
06.2013 - Current

High School Diploma - N/A

Justo Sierra
Luis Zaragoza