Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Magdaleno Montes Lepe

Concrete Finisher
Santa Clara,Utah

Summary

Hardworking Concrete Laborer adept at completing tasks quickly and correctly to maximize team productivity and job efficiency. Knowledgeable about mixing, pouring and smoothing concrete on-site as well as how to work with pre-cast pieces. Offering 15 years of experience in construction jobs.

Focused Concrete Laborer with strong attention to detail, commitment to safety and 10 years of experience in construction environments. Bringing understanding of appropriate protective measures, correct equipment operation and how to effectively contribute to team success through dedicated and responsible work.

Versatile Concrete Laborer accustomed to working in various environments and taking on multiple tasks. Exceptional work ethic, stamina and reliability. Offering 6-year history of construction experience, excellent attendance record and reputation for reliability.

Dedicated Industry professional with history of meeting company goals utilizing consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.

To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level electrical position. Ready to help team achieve company goals.

Overview

17
17
years of professional experience

Work History

Concrete Finisher

Rowley Bro Construction
St George , UT
01.2017 - 07.2022
  • Created specific finishes on poured concrete.
  • Demolished and repaired old concrete surfaces.
  • Mixed, spread and patched concrete to specifications.
  • Set wood and other forming materials to prepare for concrete pours.
  • Completed physically demanding tasks such as lifting up to Number pounds to move job materials.
  • Routinely lifted and moved items weighing up to Number pounds.
  • Adhered to safety and reporting procedures.
  • Shoveled materials such as dirt, gravel and asphalt.
  • Observed manufacturer's safety procedures and corporate standards for pouring and finishing.
  • Reviewed all project documentation and blueprints to prioritize and schedule job tasks.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Measured precise amounts of concrete and verified levelness to improve quality of finished product.

Concrete Finisher

Jensen Concrete
St George , UT
05.2010 - 01.2016
  • Routinely lifted and moved items weighing up to Number pounds.
  • Applied concrete fabrication techniques to achieve desired project specifications, quality and code standards.
  • Wore correct clothing and protective equipment for jobs.
  • Monitored inventory of key tools and materials used at each project site to provide consistent availability.
  • Completed physically demanding tasks such as lifting up to Number pounds to move job materials.
  • Shoveled materials such as dirt, gravel and asphalt.
  • Demolished and repaired old concrete surfaces.
  • Repaired damaged Type of Item using different chemicals and tools.
  • Adhered to safety and reporting procedures.
  • Observed manufacturer's safety procedures and corporate standards for pouring and finishing.
  • Operated equipment such as forklifts safely to efficiently complete site work.
  • Installed rebar and molded expansion joints and edges for concrete projects.

Pipe Layer

Joseph Kanes Pipe Line
Watford City, ND
03.2003 - 05.2009
  • Assembled and installed underground pipe, fittings and valves of various sizes.
  • Used equipment such as rollers, dump trucks and front-end loaders to move important supplies.
  • Covered completed pipes with earth or materials and prepared sites for grading.
  • Graded or leveled trench bases using tamping machines or hand tools.
  • Located existing pipes needing repair or replacement using magnetic or radio indicators.
  • Installed new hydrants, valves and lines to meet fire department needs and protect residents.
  • Followed plans to locate existing utilities prior to digging and flagged locations for operators.

Education

Mexico

Skills

Power saws

undefined

Accomplishments

  • Resolved product issue through consumer testing.
  • Achieved Result by completing Task with accuracy and efficiency.

Timeline

Concrete Finisher

Rowley Bro Construction
01.2017 - 07.2022

Concrete Finisher

Jensen Concrete
05.2010 - 01.2016

Pipe Layer

Joseph Kanes Pipe Line
03.2003 - 05.2009

Mexico
Magdaleno Montes LepeConcrete Finisher